傾斜桿 的英文怎麼說

中文拼音 [qīngxiégǎn]
傾斜桿 英文
tilting lever
  • : 形容詞(跟平面或直線既不平行也不垂直的) oblique; slanting; skew; bevel; diagonal; askew; inclined; tilted
  • : 桿名詞(桿子) pole; staff
  1. Robert leaned lightly on the lever and the rock groaned.

    羅伯特把身子稍微一點壓在杠上,巖石發出軋軋的響聲。
  2. The pedal angle can be changed as desired by adjusting the length of the link rod

    調節連接的長度,踏板的角度可以自動地變化。
  3. In the second storey rere of his bloom s house the light of a paraffin oil lamp with oblique shade projected on a screen of roller blind supplied by frank o hara, window blind, curtain pole and revolving shutter manufacturer, 16 aungier street

    在他布盧姆家的二樓後身,點起了一盞煤油燈,一個的人影投到卷式百葉簾上那是在安吉爾街十六號開業的百葉窗簾卷式簾製造商弗蘭克奧哈拉供應的。
  4. A creaking noise can be heard from the front suspension, particularly at manoeuvering speed and over uneven gradients imposing torsional pressure to the sway bar ( anti - roll bar )

    從前懸架下可以聽到一種吱吱嘎嘎聲音,尤其是在操縱速度下和經過不平坦的坡時,此時會給防(扭力)施加扭轉壓力。
  5. Optimal design with three variables is then done to the elbow - bar mechanism of the mp1040b moulding machine by utilizing the method of punishing function for constraint problems and variational scale for unconstraint problems. the optimal target function is the maxium of gradient in one work travel for the moulding plank of the elbow - bar mechanism. the result shows that the maximal gradient of moulding plank in one motion period declines by 25. 7 after optimization, and the angular acceleration of the bottom moulding plank decreases greatly

    動力學分析中,各構件的質量和轉動慣量是通過pro / engineer軟體,先建立各個構件幾何模型而求得;然後,利用解決約束問題的罰函數法和處理無約束問題的變尺度法對mp1040b型模切機肘機構進行三個設計變量的優化設計,優化目標函數為肘機構的下模切板在一個工作行程中達到的最大程度;通過優化設計,模切機肘機構的下模切板在一個工作行程中的最大程度降低了25 . 7 ,其角加速度明顯減小,提高了模切機動力學性能。
  6. The bowsprit was over my head

    船頭的桅正好在我的頭頂上方。
  7. Driver ' s position : optimised layout, based on the latest ergonomic principles, considerably reduced vibration and noise, throunh insulating the operator ' s compartment from the vehicle itself by means of shock absorbes, seat adjustable to operator ' s height and weight, as well as being spring suspended and hydraulically damped. lindedouble pedal control system offers accurate reversing without. changing gear. linde central control lever operates all mast functions

    駕駛室:根據人機工程學原理對駕駛室進行了優化設計.駕駛室與車身之間由減震墊隔離,大大地降低了震動和噪音,司機座下有彈簧和液壓減震裝置,並可根據駕駛員的身高和體重進行調整,以獲得最舒適的狀態.林德雙踏板控制系統具有無需切換即可實現靈敏向的功能:林德集中控制控制門架的提升,下隆和動作.發動機的轉速可根據提升和其它功能對輸出功率的需要而自動調節.護頂架與司機座聯成一體,並可裝配成舒適的全封閉駕駛室
  8. 2 kneading massage heads on neck and each 6 pcs on the back & waist controlled individual w / t 2 kneading speeds ; 2 ) 4 vibrators on seat with 4 vibration modes ; 3 ) 2 electronic hammer on calves with 4 tapping modes ; 4 ) back & calves inclined angle adjustable, the adjust lever at the same way to easy use and save space ; 6 ) simple armrest

    頸部2個,背部、腰部各6個揉捏按摩頭, 2種速度單獨控制; 2 )座墊4個振動馬達, 3種振動模式; 3 )腿部2個電捶, 4種捶打模式; 4 )背部、小腿角度可調,調節在同一方向使用方便,節約空間; 5 )簡易扶手。
  9. Move the throttle stick back to mid position - - swashplate moves to the mid point of its travel

    將油門操縱移動到中間,盤移動回行程的中點。
  10. Thirdly, in term of the results of testing and calculation, the displacement and libration, the difference of altitude, the flexibility and strain of crane - beams are all generally analysed, especially the reason why the crane - beams are attaint is lucubrated, and the reasons why the trigging pole is ruptured, the upper wingspan is damaged, the orbital movement, the exceptional incline of colums are open out, which has instructional significances that improve the design of the steel frame of the coke made by dry flameout

    第三,根據檢測和計算結果,對鋼框架的位移和振動、框架高差、吊車梁撓度和應變等進行了全面的分析,特別對吊車梁系統的損傷原因進行了深入分析,揭示了制動件斷裂、上翼緣磨損、軌道竄動、柱異常等一系列損傷現象的原因,對于改進干熄焦鋼框架的設計有著直接的指導意義。
  11. Owing to the cant of the vessel, the masts hung far out over the water, and from my perch on the cross - trees i had nothing below me but the surface of the bay

    由於船身的,桅都伸出水面上方很遠。我坐在桅頂橫桁上,下面只有一灣海水。
  12. The bias - ball system is the most aggressive, providing a highly consistent connection between the plunger and barrel by compressing a ball against an angled plunger

    偏置球系統最有積極性,通過將球壓到一個的頂,在頂針和客體之間提供極其一致的連接。
  13. Piast test method for using a portable inclineable articulated strut slip tester

    使用便攜式可鉸鏈支滑動測試儀
  14. Piast standard test method for using a portable inclineable articulated strut slip tester

    使用便攜式可鉸鏈支滑動測試儀
  15. 2, mix the room inside out to anticipate from taking to make dynamic electric motor to pass leather belt or putting the line deceleration machine peace bread round pole, made to mix room to turn inside out 140 degreeses to tilt to one side to anticipate before rounding, that organization loading ability big, the physical volume is small, structure tightly packed, operation steady

    2混煉室翻轉煉料,由帶制動的電動機通過皮帶或擺線減速機和平麵包絡蝸輪蝸,使混煉室繞前轉了翻轉140度煉料,該機構承載能力大體積小,結構緊湊運轉平穩。
  16. Of course, when the schooner canted over, the boom had swung out - board, and the cap of it and a foot or two of sail hung even under water

    時,主帆的下桁當然到了船外,桅頭連同兩英尺左右的帆平垂在水下。
  17. The fig. 1710 balancing globe valve is a straight pattern design having the stem / disc arrangement vertical to the direction of flow compared to conventional oblique " y " pattern globe valves

    型號1710平衡截止閥是直線型結構,其閥與閥瓣垂直於水流方向,而不是常規的式y形截止閥結構。
  18. At last, on the basis of the linear finite element model, the effect of different factors such as the stiffness of the arch rib, the arrangement form and the arrangement position of the lateral brace, the sloping angle of arch ribs, ratio of the width to the span, the form of the hangers, the stiffness of bridge decks, cables etc is discussed

    最後,本文還通過有限元模型的分析,就拱肋自身剛度、橫撐的布置形式和布置位置、拱肋內角、寬跨比、吊形式、橋面剛度、拉索等方面對該橋的整體穩定性的影響展開討論和研究。
分享友人