傾斜臺 的英文怎麼說

中文拼音 [qīngxiétái]
傾斜臺 英文
tilt table
  • : 形容詞(跟平面或直線既不平行也不垂直的) oblique; slanting; skew; bevel; diagonal; askew; inclined; tilted
  • : 臺名詞(指臺州) short for taizhou (in zhejiang province)
  1. It occurred many times on the ocean of shengli oil field that driving piles were defeated, artesian well flat roof leaned, oil transport pipe brook and oil leaked in the year of 1984, 1987, 1994 and 1998

    勝利油田在1984年- 1987年、 1994年、 1998年多次發生海上插樁失敗和暴風浪下採油鉆井平、輸油管破裂漏油。
  2. Chippendale - style slant - front secretary bookcase inlaid with the initials jfk and a version of the united states seal sold for $ 452, 000

    一款齊本德爾式風格的正面的寫字式書架以45 . 2萬美元的價格賣出,這件傢具上鑲嵌著肯尼迪姓名的首字母縮寫jfk和一款美國圖章。
  3. A chippendale - style slant - front secretary bookcase inlaid with the initials jfk and a version of the united states seal sold for $ 452, 000

    一款齊本德爾式風格的正面的寫字式書架以45 . 2萬美元的價格賣出,這件傢具上鑲嵌著肯尼迪姓名的首字母縮寫jfk和一款美國圖章。
  4. Analysis of coseismal effect about vertical pendulum clinometer in yanshou seismic station of haerbin

    哈爾濱市延壽地震豎直擺同震效應分析
  5. In the research, a set of simulation equipment is developed to examine the drivers " static and dynamic fatigue. recur to the apparatus, contrast and control experiment are made among different ages, workload intension and workload factors group. the endings summarize as following : ( 1 ) driving sensation fatigue investigation ( investigation of psychological and physiologic index and contrast investigation of fatigue ) ; continuous driving load and discrete driving load investigation of fatigue

    ? ?門)駕駛疲勞平衡穩定性是通過在力檢測上描繪人體重心軌跡的方法,提出檢測駕駛員疲勞平衡穩定指數,在不同狀態下(度15 30 『以及閉目等狀態下)對不同負荷、不同年齡分別進行測試,建立駕駛疲勞客觀測試評價體系; n )經實驗室研究與現場調查,通過對駕駛疲勞與駕駛時間、駕駛速度等關系的研究,提出了不同年齡、不同條件下的最大連續安全駕駛時間標準,日駕駛時間標準,最大安全行車速度標準等。
  6. Stage projection ; oblique projection on plane screens, drawings and nomograms for use in practice

    放映.平面屏幕上的放映.實際應用的圖形和列
  7. To make the tilt front - up, loosen the set screw, insert a screwdriver into the feed bar shaft, and turn it by 90 in the direction of arrow mark

    想要向前上方時,請擰松固定螺絲,把螺絲刀插進送布軸,朝箭頭方向轉動90 。
  8. They came down the steps from leahy s terrace prudently, frauenzimmer : and down the shelving shore flabbily their splayed feet sinking in the silted sand

    她們從萊希的陽上沿著階小心翼翼地走下來了婆娘們15 。八字腳陷進沉積的泥沙,軟塌塌地走下的海濱。
  9. Design of control system of static inclining test table

    靜態試驗控制系統設計
  10. A bad combusting condition had been occurring on the two boilers typed dg670 / 13. 7 - - in the huanggezhuang power plant for two years : 2003 - 2004. there were fourteen times boilers break without arrangement which has had a serious influence on the development of the company. in order to improve the combusting condition of their boilers and prevent the “ four - pipes ” from leaking, we made experiments and improvements on the combusting system of # 22 boiler

    黃桷莊電廠dg670 / 13 . 7 -型型微爐底液態排渣爐近兩年鍋爐燃燒狀況不好, 2003年- 2004年兩爐「四管」泄漏非計劃停爐共14次,嚴重影響了電廠的經濟運行,使電廠的效益有較大的滑坡。
  11. In chapter 4, the influences of the earth ' s models on the elastic green ' s function, as well as on the atmospheric loading effects, are discussed using the numerical techniques. the attraction green ' s function is solved out based on the state equations of the ideal gas and the hydrostatic equilibrium equation. the influences of various factors upon the gravity and tilt green ' s functions, as well as upon the gravity and tilt, are considered in detail

    第四章:採用數值計算方法,研究了地球模型對彈性項格林函數及其對大氣負荷響應的影響;利用理想氣體方程和流體靜力學平衡方程解算了吸引項格林函數,討論各種因素對大氣重力和格林函數及其對重力和的影響;基於球對稱地球模型,給出了武昌站站依賴的大氣重力、格林函數
  12. Ocean tidal loading correction to tilt observations at sheshan station

    佘山固體潮觀測的海潮負荷改正
  13. Abstract : this article discusses the formation of the drilling rig platform, selection of the hole forming equipment and treatment of some incidents occurred during the construction of the bored pile foundation of the qi ? ao bridge in zhuhai under different geological conditions. it also studies such issues as the embedment of the steel casing and bottom elevation of the bored pile on the inclining rock and katarock

    文摘:筆者介紹了淇澳橋主橋鉆孔灌注樁基樁施工中,在不同地質條件下,水上鉆機平的搭設、成孔設備的選型、事故的處理,並對鋼護筒的埋設及破碎帶巖面上鉆孔嵌巖面上鉆孔樁孔底標高問題作了探討
  14. N, fifty, said the englishman. good, for fifty imperials, that ill drink off a whole bottle of rum without taking it from my lips. ill drink it sitting outside the window, here on this place he bent down and pointed to the sloping projection of the wall outside the window and without holding on to anything. that right

    「好吧,賭五十金盧布, 」二人議定, 「我要一口氣喝乾一整瓶烈性糖酒,兩手不扶著什麼東西,坐在窗外邊,就坐在這個地方把它喝乾他彎下腰來,用手指指窗戶外邊那的墻壁上的突出部分就這樣,好嗎? 」
  15. On the illustration of mining in deeply inclined coal seam under buildings in muchengjian colliery in beijing, the confirmation method of coal pillar dimension and the united layout of pseudo - dip strip pillar and boundary pillar were put forward to provide theory foundation for the control of surface movement and subsidence in the mining of deeply inclined coal seam

    摘要以北京木城澗煤礦大井建築物下壓煤開采為例,提出了急煤層開采條件下條帶煤柱尺寸的確定方法和條帶煤柱與邊界煤柱相結合的條帶布置方案,為急煤層開采地表沉陷控制提供了理論依據。
  16. Stage projection ; oblique projection on plane screens

    放映.第1部分:平面銀幕上的放映
  17. Machines and plants for the manufacture, treatment and processing of flat glass - safety requirements - part 4 : tilting tables

    平板玻璃製造處理和加工用機械和設備.安全性要求.第4部分:傾斜臺
  18. With the help of this program, this paper does research on the moved backwards of the slide surface, lengthening the anchor section, the soil nail ' s total force, gets conclusion about relations between the soil nail ' s length and the slope ' s grade, height, soil ' s mechanical parameter ; relations between soil nail ' s total force and coulomb soil pressure. with the help of the large multiuse finite element program ansys, this paper analyzes the soil nailing in one - step ' s slopes, in two - steps " slopes, puts the emphasis on the axis force ' s distributing along the soil nail at each rows, the effect of both the excavating mode and the original slope figure to the axis force of the soil nail, the one another effect between the upper - step slope and the nether - step slope in the soil nail ' s axis force, gets conclusion about the design of soil nail at the first low, different slope body is the same with different excavating mode, the original slope figure has more effect to some than others because of the slope body, the reasonably design of the step width in two - steps slopes, the two - steps excavating and retaining has more virtue than the one - step ' s. through soil pressure analysis this paper does research on the differences and the links between the coulomb soil pressure theory and the rankin ' s, the vertical pressure at the slope surface when the slope surface is inclined and the retaining wall is rough, the soil pressure ' s distributing behind the panel, gets conclusion about the effect of both the slope body inner stability and the slope surface local stability to the soil pressure

    通過分析比較,論證了對數螺旋線型比圓弧形作為邊坡的假設滑裂面具有較多的工程優點,並為此編制了一個採用極限平衡法分析土釘支護的fortran語言程序,以此作工具對滑裂面的后移、土釘錨固段的超長、土釘總力的大小等方面作了研究,得出了有關土釘的長度與邊坡的坡角、坡高、土體力學參數的關系、土釘總力與庫侖土壓力間的關系等結論;採用大型通用有限元數值分析程序ansys分別對採用土釘支護的一階邊坡、二階邊坡進行分析,重點是研究各排土釘的軸力分佈規律、開挖方式及原始邊坡形態對土釘的軸力的影響、上下階邊坡在土釘軸力方面的相互作用,得出了有關第一排土釘的設計問題、不同類型的土體應適用於特定的開挖方式、原始開挖出的邊坡形態對一些類型坡體的邊坡土釘支護有較大的影響而對另外一些影響不大、二階邊坡階寬度的合理確定、二階開挖及支護比一階時具有較多的工程優點等結論;通過土壓力分析對朗肯、庫侖兩種經典土壓力理論的區別與聯系、坡面及墻背有摩擦時的坡面豎向應力分佈、面板背土壓力的分佈形態作了研究,得出了邊坡支擋土壓力受坡體內部穩定與坡面局部穩定兩個方面的影響、土釘支護面板背土體中卸荷拱的存在對面板受力有利等結論。
  19. A tilt table procedure for measuring the static rollover threshold for heavy trucks

    重型卡車靜態翻轉限度測量用傾斜臺程序
  20. Machines and plants for the manufacture, treatment and processing of flat glass - safety requirements - tilting tables

    平板玻璃的製造處理和加工用機械和設備.安全要求.傾斜臺
分享友人