匯合的河流 的英文怎麼說

中文拼音 [huìdeliú]
匯合的河流 英文
confluent
  • : Ⅰ動詞1 (匯合) converge 2 (聚集; 聚合) gather together 3 (通過郵電局、 銀行把款項劃撥到別處)...
  • : 合量詞(容量單位) ge, a unit of dry measure for grain (=1 decilitre)
  • : 4次方是 The fourth power of 2 is direction
  • : 1 (天然的和人工的大水道) river 2 (指銀河系) the milky way system; the galaxy 3 (特指黃河) t...
  • : Ⅰ動1 (液體移動; 流動) flow 2 (移動不定) drift; move; wander 3 (流傳; 傳播) spread 4 (向壞...
  • 河流 : rivers; stream
  1. The little rills of selfishness had united and made a channel.

    一點兒細微自私涓涓之成了一條大
  2. Through examination of the recession limbs of the observed hydrographs, during periods with no rain and thus no surface runoff, one can determine the value of. for this catchment, a value of 0. 8 is obtained. the simulated subsurface runoff at each grid is routed to the outlets through a unit - hydrograph method for overland flow and the linear saint - venant equation for channel flow to get the discharge at xixian station

    對所研究域而言,經過估算消退系數為0 . 8 .耦著這兩種不同地下徑機制clm模型都可以計算出每個網格地表地下徑深,採用dag lohman 34 , 35發展模型進行由於是研究地下徑,所以取每個網格地表徑為0 ,該模型採用單位線計算坡面線性聖維南saint - venant equation進行
  3. A delta is a deposit of sediments that forms near the junction of some rivers with a standing body of water.

    三角洲由沉積累積而成,這些沉積物形成於某些與靜水體附近。
  4. The hydrolic power station stands at the junction of two rivers

    水力發電站在兩條處。
  5. Many geological and hydrological factors of the river section, where the yellow river water intake engineering is laid out, such as the capacity of the reservoirs along the river section upstream and downstream, the rate of the flow discharge, the erosion and silt of the watercourse, the form of the riverbed and the water current, ice tuck, the convergence of the upstream branches of the river section, flood crest, sand crest size, the capacity for flood discharge of the watercourse, the effect of flood control structure around and the impacts on surrounding environment and the third person " s legitimate rights and interests, should be considered

    取水工程布設要考慮工程所處地質水文等諸多因素。如該段上下游水庫庫容,泄水量、道沖刷、淤積、床形態、水形態、冰塞、段上游入、洪峰、沙峰大小、道行洪能力大小、周圍防洪工程影響及對周圍環境和第三人法權益影響等等。
  6. The main features in the study of flood forecasting and control system are as follows : ( 1 ) runoff generating and confluence theory and hydro - dynamic method are adopted to predict the water level of taihu lake and key nodes, the basin wide forecasting and control system with the function of real time correction has been first established in plain river network to meet the complicated flow conditions of taihu lake basin and to enhance the reliability of forecasting results ; ( 2 ) according to the rainfall in foreseen period multiple schemes can be made in the forecasting model and adjusted with time, which overcomes the errors caused by the uncertain rainfall in the foreseen period so as to make the forecasting results approach reality

    本文所研究預報調度系統有如下特點: ( 1 )本系統採用產理論和水動力學方法預報太湖及重要節點水位,首次在平原網地區建立了具有實時校正功能域預報調度系統。以適太湖域復雜水力條件,增強預報可靠性; ( 2 )預報模型可以根據預見期降雨量進行多方案預報,並隨時間推移,可以實時進行調整,克服由於預見期降雨不確定引起誤差,使預報結果更接近實際。
  7. At nine the train stopped at the important town of north platte, built between the two arms of the river, which rejoin each other around it and form a single artery, - a large tributary whose waters empty into the missouri a little above omaha

    九點鐘火車到達了位於南北普拉特中間一座大城市北普拉特。兩條大在這座城附近形成一條巨,然後和奧馬哈北面不遠密蘇里
分享友人