Firstly, according to the natural geology study of the quarry, the control structure planes are determined, which are cut to be building blocks by two sets of main joints. failure can occur due to the intensity weaken of the joint planes caused by excavation relief and rain immersion
首先研究了采場的自然地質條件,確定了影響邊坡穩定的控制性結構面,即塊體主要由兩組節理切割而成楔形體,由於開挖卸荷及雨水浸泡,致使節理面強度減弱而發生破壞。The quantification indexes that token weathered degree are primary velocity, borehole rqd ( rock quality designation ), joint space, joint number and so on, and the unloading ones are primary velocity, joint opening, borehole penetrability and so on. the compartmentalization of different weathered and load - off zones according to quantification indexes tallies with the slope geo - stress computed by finite element method
其中研究風化分帶的定量指標有縱波速vp 、鉆孔rqd 、結構面間距與條數等,研究卸荷分帶的定量指標有縱波速度、節理開度與鉆孔巖體透水性,據此劃分的不同程度風化、卸荷巖體與有限元計算的壩區河谷應力場具有良好對應性。