卸載端 的英文怎麼說

中文拼音 [xièzǎiduān]
卸載端 英文
discharge end
  • : 動詞1 (從運輸工具上搬下來) remove cargo or freight; unload; discharge; unlade 2 (把加在人或牲...
  • : 載Ⅰ名詞(年) year : 一年半載 six to twelve months; six months to a year; 三年五載 three to five ...
  • : Ⅰ名詞1 (東西的頭) end; extremity 2 (事情的開頭) beginning 3 (門類; 方面) item; point 4 (原...
  1. The following conclusions are gained : ( 1 ) the located shear band prongs the ligament near the top crack tip and the structure may occur shear - mode fracture at the angle of 155 ? to crack when load is 87. 92mpa ; the mode of fracture of the flange joint structure is not possible to be void - mode ; ( 2 ) it is proved that loading and then unloading repeatedly can not increase the possibility of invalidation of the structure when the times of loading and unloading are not too more when load is operating pressure ; the structure is safe when the vessel is operating ; ( 3 ) in the fe model of the thesis, not considering the influence of water pressure test which is in the process of fabrication of vessel in fe results in larger deviation in analysi

    得出了以下結論:在8792mpa的荷下筒體一封頭連接結構處的集中剪切帶貫穿韌帶,可能發生沿與原裂紋線成155 「角方向剪切型斷裂;筒體一封頭連接結構不可能發生韌窩型斷裂; ( 2 )在工作壓力下進行次數不多的反復加、,結構不會破壞,也不會喪失安定性:結構在工作狀態下是安全的; m在本文的彈塑性有限元模擬計算中,對于裂紋尖進行力學分析時,不考慮壓力容器製造過程中水壓試驗的影響,將導致計算結果出現較大的偏差; ( 4 )筒體完全屈服時的荷為92石3mpa ,封頭完全屈服時荷為86
  2. Through the experimentation for the physical performance of cfpb masonry under local compression, the author has observed the deformation and failure of cfpbm. based on the mathematical statistics and regression analysis of the experimental data, the author derived a feasible and common formula for counting the cfpbm ' s local compression strength regarding the different local compression locations, analyzed stress distribution of local bearing masonry under beams end, and provided the calculating formula on effective supporting length of beam end in brick masonry. as the results of experiments demonstrate, owing to the cfpb ' s own holes " system, the beneficial effects, the bounding effect of surrounding masonry and the spread effect of force, have not developed completely

    試驗結果分析表明:由於多孔磚自身的孔洞結構,砌體內部的圍箍作用和力的擴散作用未得到充分發揮,局壓強度雖較軸心受壓強度有所提高,但仍低於同情況下實心磚的局壓強度;當有上部荷作用時,對砌體局壓有利的懸臂荷作用和內拱荷作用均不明顯,因此在推導梁局壓強度計算公式時,未考慮此可能存在的有利影響,計算偏安全;局壓強度提高系數公式除採用規范公式(二項式)的表達式,還用對數式進行了回歸推導,得到了一個較為普遍的公式;論文還對梁局壓的梁有效支承長度計算公式進行了回歸推導。
  3. Secondly after damage model of structure is analyzed and considering of rigid degradation in crossing section of structure, the damage index is defined by rotation rigid of element side and the model of damage of crossing section is developed. meantime, the damage model of structure is built by idea that damage index of elements endowed weight are added linearly

    其次,在對現有的結構損傷模型分析之後,考慮到構件截面恢復力模型中剛度的退化現象,作者基於構件部截面的轉動剛度定義了構件的損傷指標,建立了構件層次上的損傷模型。同時考慮到結構損傷前後固有頻率的變化,運用線性加權求和的思想建立了結構層次上的損傷模型。
  4. It is found that cyclic loading at high differential stress level will lead to the decrease of felicity ratio, and the value max can be decreased by some crack systems in specimen. there is still a lot of ae during unloading at high differential stress level, which implies that the deformation is dominated by fracturing at low differential stress level, and the deformation by frictional sliding increases greatly at high differential stress level

    關于應力方式對巖石破裂的影響,發現較高差應力水平下的多次循環加會使felicity比減小;某些構造能使巖石產生felicity效應的應力門檻值_ ( max )降低;由高差應力水平下時仍有大量聲發射產生推測:在低差應力水平下,破裂以裂紋尖的突然擴展為主;在高差應力水平下,沿已有的裂紋面的滑動破裂大量增加。
  5. At present some offloading chips have played an important role in network storage and high - grade servers

    目前部分協議晶元已經在存儲網路和高服務器中發揮著極為重要的作用。
  6. The steel structure of the national stadium the main venue for the 2008 beijing olympic games stood on its own yesterday after the last jack pad was removed

    9月17日上午11時,隨著建築工人在「鳥巢」的頂取下了最後一塊鋼墊塊,歷時4天的國家體育場鋼結構順利完成。
  7. This error sometimes occurs when a project uses a class from the mfc but the project settings don ' t explicitly tell the link editor to look in the mfc libraries

    現象:諾頓殺毒軟體客戶時,提示需要密碼,但當時安裝客戶時並沒設置密碼。
  8. This transformation can occur on either the server or the client ? provided that the client is capable ? thus offloading cpu cycles

    這種轉換既可以在服務器上發生,也可以在客戶發生(條件是客戶具備此功能) ,從而了cpu周期。
分享友人