吊裝單元 的英文怎麼說

中文拼音 [diàozhuāngdānyuán]
吊裝單元 英文
hoisting unit
  • : hangsuspend
  • : Ⅰ名詞1 (服裝) dress; outfit; attire; clothing 2 (演員的化裝品) stage makeup and costume Ⅱ動詞...
  • 吊裝 : [建築] hoisting吊裝車 sling cart; 吊裝工 slinger; 吊裝豎井 emplacement hole; 吊裝套管 emplacement casing
  1. Cable - pulley element in finite element analysis of cableway erection system

    纜索系統有限分析中的滑輪
  2. Fourth, the paper treats two kinds of hoisting projects of high alititude construction in bulk and member assembly, hositing machine and plan layout, setting up scaffold and joints, and installing trunks, branches and joints etc. then in detail discusses the method which applys total station to measure three - dimensional coordinate of dendriform structure, including selecting survey sign points, creating survey system and converting survey coordinate system etc. the paper also deep research on the welding performance, welding method, welding process, welding stress and control, welding strain and rectification, weld defects analysis and weld quality inspection, and so on complicated heterogeneity steel weld proplems

    接著系統的論述了高空散法和分法兩種樹狀結構方案,樹狀結構機械及平面布置,樹狀結構胎架及節點的搭設,以及樹狀結構樹干、樹枝和節點的工藝等諸多工藝問題。詳細的論述了採用全站儀對樹狀結構進行空間三維坐標測量的方法,包括測量標志點的選取、測量系統的建立及測量坐標的轉換等問題。深入地研究了樹狀結構可焊性、焊接方法、焊接工藝、焊接應力及控制、焊接變形及矯正、焊接缺陷分析及焊接質量檢查等復雜的異種鋼焊接問題。
  3. Maintenance standards for civil aircraft. unit 2 : ground safety. part 38 : component hoisting for civil aircraft

    民用航空器維修標準.第2:地面安全.第38部分:民用航空器部件的
  4. Referring to some type of the structure such as plane truss, grid truss and grid shell, the author dissertates the common construction technique including whole installation, integral propping up, integral lifting, high altitude construction in bulk, member assembly and sliding construction

    結合大跨度鋼結構的各種形式,如平面桁架、網架、網殼等,概要的論述了其一般的施工方法、工藝和技術要點,包括整體法、整體頂升法、整體提升法、高空散法、分法和高空滑移法。
  5. The paper describes the main techniques in the integral sliding construction for large span structure, which includes jacking scheme, plan layout, assembly, transport and stacking of components, setting of sliding system, setting of track, conformation of falsework, traction facility etc. discusses emphatically the sliding falsework, which includes the material, conformation, manufacture, welding and assembling of the shape steel tape falsework

    系統分析了大跨度鋼桁架胎架整體滑移施工中的起重機具的選擇與布置、施工平面布置、桁架結構拼及滑移劃分、滑移施工方案及工藝流程、桁架的連接、拼運輸、及堆放、滑移軌道布置、滑移滾輪構造、延伸平臺布置以及滑移牽引系統等諸多工藝問題。
  6. Max michl gmbh nl is a society, which offers service units, hydraulic components and milled pieces, in addition is also concered with measuring devices, hose lines as well as with regulator

    不僅在以電桿器、調節閥和磁閥門以及電磁閥、執行件和動作器、放射體,兩極反應物,執行件領域內著稱,而且以其它產品馳名,如調節配件、調節閥和維修機、伺服驅動以及維修位。
  7. Tlv euro engineering gmbh is well - known not only in waibstadt with order, product and set - up as well as with computer - controlled, electronic computers and armatures, fittings, but also with further offers, like measuring instruments, rule and / or probe, service units and rule armature

    不僅在以電桿器、調節閥和磁閥門以及電磁閥、執行件和動作器、放射體,兩極反應物,執行件領域內著稱,而且以其它產品馳名,如調節配件、調節閥和維修機、伺服驅動以及維修位。
  8. The author gets these results by researching the method in construction technology : ( 1 ) from the common construction method of grid frame the paper summarizes the types of the sliding construction, the plan of for life - on construction, the seal method of the components, the grid frame assemble, the separating of the sliding unit, assemble in high altitude, and the sliding system

    從施工技術的角度對逐條滑移施工技術研究得到了如下成果: ( 1 )從網架一般施工方法入手,對網架滑移施工的分類、起重方案、構件的拼焊接、網架拼、滑移劃分、高空組對、滑移系統的構造、設置等工藝進行了整理、總結。
  9. According to the forward analysis method based on iterative theory, the simulation calculation procedure of rib - hoisting on the long - span cfst arch bridge is worked out. in this procedure, the finite element theory and the formation of flexible cable unit is analyzed detailed

    根據基於迭代理論的前進分析方法,本文編制了大跨度鋼管混凝土拱橋拱肋模擬計算程序,對程序中的有限理論、扣索的處理進行了詳細分析。
  10. With the development of modern manufacture technology and computer technology, multi - cell technology of garment manufacture system was enrichment and perfect by and by too. disquisition to garment suspending system scheduling technology was carried through in this thesis

    隨著現代製造技術、計算機技術的發展,服製造系統的各種技術也在不斷豐富和完善,本文對服掛生產線調度技術進行了研究。
  11. For the project of erecting the steel structures of the national stadium, the main truss was divided into two lifting elements, i. e. space 3 - d truss and 2 - d truss according to the actual conditions

    摘要國家體育場鋼結構安工程,主桁架根據安實際情況被分成空間立體桁架和平面桁架兩種吊裝單元
分享友人