  1. Erection of segmental bridge deck by launching gantry no. 1

    梁機興建中的高
  2. Erection of segmental bridge deck by launching gantry no. 2

    梁機興建中的高
  3. Erection of segmental bridge decks by launching gantry no. 1

    梁機興建中的高
  4. Erection of segmental bridge decks by launching gantry no. 2

    梁機興建中的高
  5. During its storage, transportation, maintenance and service, the solid rocket motor ( srm ) may encounter many incidents such as being dropped onto the ground while being hoisted up, crashing when vehicle turns over during transportation, being struck heavily in takeoff or landing accident while being carried by airplane, impacting with launch platform or buildings when there is abnormality during launch of multiple - stage rocket. impact of great intensity takes place in such accidents, which will lead to srm ignition or explosion

    固體火箭發動機在貯存、輸、維護及使用過程中可能遇到各種意外機械撞擊激勵,例如:裝過程中跌落,輸過程中因交通事故發生翻覆碰撞,機載固體導彈掛飛時因載機發生起降事故導致高速沖撞,多級火箭發射初期因發射異常與發射或地面建築物發生碰撞等,固體火箭發動機將受到劇烈機械撞擊載荷作用,導致其著火燃燒甚至爆炸。
  6. During the 3d finite element calculation, try to simulate different procedure of the construction ( like sunk well in - filling, main cable erection, box girder hoist, bridge flooring and opening to traffic ). and then, reveal the regulation of deformation and displacement on the foundation and soil during different period. after got these, this thesis put great attention on the analysis of the reason which cause the horizontal displacement of the cable saddle, as well as the regulation of the pressure ' s changing in the soil located on the front side of the sunk well foundation

    在三維有限元計算中,對不同工況(沉井充填、錨體澆築、主纜設、箱梁裝、橋面鋪裝以及通車營)下的施工過程作了模擬,全面揭示了各工況下錨碇沉井基礎與地基土的變形變位規律,著重分析了影響散索鞍水平位移的因素以及不同工況下沉井前測地基土水平向抗力變化規律,並提出了不同深度地基土水平向抗力與水平位移間的擬合關系。
  7. Fabrication of the box beam is divided into such parts as reinforcement, formwork, concreting, prestressing, moving and storing of beam, pipe grouting under pressure, end sealing of the beam, water - proof layer on the bridge surface system, protective coating etc. the paper makes description of effective box beam construction technology and workmanship which can be adopted in other projects, such technologies as : manufacturing and fixing of reinforcement, steel reinforcement fixing baseplate, web plate and top plate respectively and lifting the steel skeleton into form, requirements of design and manufacturing and way of utilization for dismantling - erection type formwork and hydraulic formwork, optimization of concrete ratio, concrete pouring process of two ends of beam in priority over the middle, in sequence of first baseplate followed by web plate and top plate at last, concrete pouring in inclined section and in horizontal layer, concrete vibration mainly by external vibrator in assistance with internal vibrator, methods and regulation for steam curing of concrete, dual controls over stress and strain to ensure quality of prestressing workmanship, construction method of effective beam moving by heavy - weight special moving facility, some regulations and key notes about construction of grouting under pressure, beam ends sealing, water - proof layer on the bridge surface system, protective coating

    箱梁製造由鋼筋工程、模板工程、混凝土工程、預應力工程、移存梁工程、孔道壓漿工程、梁體封端工程、橋面防水層和保護層工程等施工環節組成。文中介紹的採用胎具製作和綁扎鋼筋,分底腹板和頂板分別綁扎並裝鋼筋骨入模;拆裝式和液壓式兩種模板的設計、製作要求和使用方法;綜合考慮、優化混凝土配合比,混凝土灌注從兩端至中間、先底板、后腹板、再頂板的施工順序和斜向分段、腹板水平分層、附著式振搗為主、插入式搗固為輔的施工工藝,蒸汽養護的方法和規定;應力應變雙控制確保預應力施工質量的施工技術;採用重物移器有效移梁的施工方法;壓漿、封端、橋面防水層和保護層施工的一些規定和注意事項等都是對箱梁製造行之有效的施工技術和施工方法,並可為以後類似施工作借鑒。
  8. In this paper, on the basis of reviewing the traditional handling technology in container terminal, the handling technology of existing automatic container terminal is introduced : automated ohbc crane 、 agv - rmg 、 drmg - crmg relay

    摘要在回顧集裝箱碼頭的傳統裝卸工藝的基礎上,介紹了現有集裝箱自動化碼頭的裝卸工藝:行式自動化場橋與軌道式龍門配合;自動搬車( agv )與軌道式龍門配合;高型軌道( drmg )和矮型軌道( crmg )接力式。
  9. The common disadvantage of these methods is that the proceeding of construction need large space as a result the other parts of the structure construction ca n ' t go on at the same time

    前者需要大量的腳手料,後者依賴裝、提升設備;而且大都存在佔用室內施工面,難以同步進行室內施工。因此,逐條積累滑移法應而生。
  10. Check pipe - hangers, supports, guides, expansion joints, and other pipe specialties for the removal of all shipping and erection stops and for the correctness of cold settings for the design service

    檢查管道、支、導向、膨脹節及其它管道特殊件,以除去所有的輸與安裝附件,確保設計服務冷設置的正確性。
  11. Abstract : the paper introduces the erection of the steel box girder of a long - span steel box - concrete composite bridge using broad double guide beam without affecting the normal operation of electrified railway and marshalling yard under the bridge, including construction plan, design of gantry crane and guide beam, as well as key points of construction technology

    文摘:介紹在保證電氣化鐵路、編組站場正常營情況下,用寬幅式雙導梁解決大跨度鋼箱混凝土結合梁橋的鋼箱梁設技術難題,重點闡述了施工方案,龍門、導梁設計,工藝要點等。
  12. The paper describes the main techniques in the integral sliding construction for large span structure, which includes jacking scheme, plan layout, assembly, transport and stacking of components, setting of sliding system, setting of track, conformation of falsework, traction facility etc. discusses emphatically the sliding falsework, which includes the material, conformation, manufacture, welding and assembling of the shape steel tape falsework

    系統分析了大跨度鋼桁整體滑移施工中的起重裝機具的選擇與布置、施工平面布置、桁結構拼裝單元及滑移單元劃分、滑移施工方案及工藝流程、桁的連接、拼裝輸、及堆放、滑移軌道布置、滑移滾輪構造、延伸平臺布置以及滑移牽引系統等諸多工藝問題。
  13. Model of a passenger aerial ropeway is established after conducting structural analysis of the cable, supporting mast and basket, and stress analysis is respectively performed under passengers or wind loads, providing a method of overall static strength design of passenger aerial ropeways

    摘要針對客索道系統中懸索、塔籃等特定結構,著重解決了索道系統分析中的整體有限元建模問題,並提出了客索道系統在自重或風力作用下的應力分析方法, ?客索道系統靜強度設計提供了整體性計算方案。
  14. Here s luck, a fair wind, and billy bones his fancy, were very neatly and clearly executed on the forearm ; and up near the shoulder there was a sketch of a gallows and a man hanging from it - done, as i thought, with great spirit

    前臂上精巧清晰地刺著「好在此」 「順風」以及「比爾彭斯的愛物」 ,而上頭挨近肩膀的地方則刺著個一個人在絞刑上的草圖。刺這些畫,照我看,是費了好大的功夫。
  15. Carcass holding area ( required when chilling room is not set up ) overhead rails and forced air blower shall be equipped

    七屠體待區(未設預冷室者應設之) :應設置高軌及送風設施。
  16. It specially produces all kinds of plactes materials and something else. for example, suits, cases, gloves, toy and sport appliances, elastic cords, cotton and rubber band strings

    澄新公司專業生產各類適用於服裝、箱包、手套、玩具、動器材等,各種松緊帶、棉繩、橡筋繩、服裝衣、照相、手機帶等;以及相關的塑料製品,並能按客戶提供之樣品生產。
  17. Subassemblage and prestressed concrete frames are assembled by precast prestressed beams and columns with tendons in the joints of the frames. these beams and columns are hoisted in site and the tendons are passed through the moire pipes. so prestressing force are brought to the joints of the frame. these tendons also can assume the moments at the end of the beams in ordinary condition

    預壓裝配式預應力混凝土框是採用工廠化生產的預制柱和預制預應力梁,至現場直接裝,樑柱就位后,將后張預應力筋穿過樑柱預留孔道,對節點實施預應力張拉預壓。
  18. Safety requirements for cableway installations designed to carry persons - carriers - part 1 : grips, carrier trucks, on - board brakes, cabins, chairs, carriages, maintenance carriers, tow - hangers

    載人用索道裝置的安全要求.載裝置.第1部分:夾緊裝置載貨汽車車裝制動裝置座艙椅子車廂維修承載裝置牽引
  19. Remote controllable advertising umbrella is our newly developed product, featuring stalbe flying, loudly sound, large advertising area, low flying speed, easily operation, no gas required, aluminum materialed wings, dispatchable for easy freight, competitive price, no ground personals needed ; japan xiaosong motor adopted with ff4 remote controller, germany air - use aluminum frame used

    它有飛行平穩,噪音大,廣告面積大,飛行速度慢,易掌握,不用充任何氣體,機翼航空鋁管,全部使用接管方式,輸極為方便,價格低,不需要地面人員。採用日本小松發動機,日本ff4遙控器,德國蒙皮,航空鋁,風動輪動連體方向。
  20. From the main suspension gallows, n. 10 + 10 hanging bars hang the whole structure during concreting or bracket replacing

    在主上,設10 + 10根桿,在澆注混凝土和輸牛腿過程中支撐整個結構。