坑井 的英文怎麼說

中文拼音 [kēngjǐng]
坑井 英文
gallery and mine [pit]
  • : Ⅰ名詞1 (從地面往下鑿成的能取水的深洞) well 2 (形狀像井的東西) sth in the shape of a well 3 (...
  1. Geotechnical investigation and testing - graphical presentation of logs of boreholes, trial pits, shafts and adits

    土工調查和檢驗.礦孔試驗和入口測記錄
  2. Fire water drain pit is provided at side of bottom of each fire elevator well, waste water will be sucked up and drained out by the pumps

    在每個消防電梯底旁設有消防排水,廢水經潛污泵提升排至室外
  3. The child complied, and gazed down into the pit.

    這孩子答應著向下望那
  4. The student said " hello " to all of us when we met him. he was thin and his face was black, seems that he was undernourished. his father brushed the chairs with his sleeves immediately, asked us to sit down. his mother leaned the door with foolish smile all the time. it was even poorer of their family than our thought. the lime had started to come off as the wind and rain damage, the sunshine got through their house, shadow was remained on the sap of floor. two small rooms, a kitchen, a quadrate desk and some chairs here, there were not anything else ; the other one was bedroom, two beds were squeezed together. the bedding wasn ' t new any more and turned white, cotton was come out from the clothes. the only thing was what one old desk was cleaned well, it should be his book desk, there were some books on it

    那位學生見我們來了,高興地向我們問好.他看上去瘦瘦的,臉色黝黑,一副嚴重營養不良的樣子.他的父親趕緊用袖子在長凳上擦拭了幾下,笨拙地端給我們坐.他的母親一直倚著門檻傻傻地笑.他的家比我想像的更窮.墻面上的石灰經不起風雨的侵蝕而紛紛脫落,陽光透過磚縫射進屋裡來,在窪窪的地面上留下一個個斑駁的影子.兩間小屋,一間是灶間,除了一張方桌和幾張長板凳外,別無他物;另一間是臥室,兩張床擠在一起,被褥舊得發白,墊被連棉絮都露在外面.唯一整理的有條的是一張舊桌子,應該是他的書桌吧,上面整整齊齊放著幾本書
  5. Examples of " external works " include external carparks, paved areas, deep bored wells, cable ducts, draw in pits, fencing, and steel gates as mentioned in the above general specification

    外部工程的例子,在上述一般規格已有提到,包括戶外停車場、已鋪面地方、深鉆、電纜槽、進線、圍欄和鋼閘。
  6. Carry on computational analysis and compare the model with actually with ideal model and project, have drawn some basic laws during the hole precipitation of the base of well of horizontal well

    用理想模型和工程實際對模型進行計算分析和對比,得出了水平單在基降水中的一些基本規律。
  7. By direct shear for and normal triaxial shear tests of non - saturated desert sand, the parper studied the effect of water content and dry density on the strength of the non - saturated desert sand, and set up the code of this sand. based on the plane strain test of non - saturated desert sand slope, the paper analysed the destruction way of the excavaion side during the construction by means of adding water, and brough forward a formule that calculates the allowable of excavation and pile hole

    通過非飽和沙漠砂直剪試驗和常規三軸剪切試驗,研究了含水量和干密度對非飽和砂強度的影響,建立了這種砂的強度準則。通過非飽和沙漠砂邊坡室內平面應變試驗,分析了沙漠場浸法施工中就基壁的破壞方式,推導出了基和樁孔容許開挖深度的計算公式。
  8. Research on safety mining boundary of coal mining above limestone with pressurized water in gaokeng mine field

    坑井田承壓水上採煤安全開采邊界的研究
  9. They did all kinds of men s work by preference, including well - sinking, hedging, ditching, and excavating, without any sense of fatigue

    她們寧肯干男人乾的活兒,包括掘,修剪樹籬,開溝挖渠,刨,而且不感到勞累。
  10. In order to ensure the safety of engineering, it should be careful to use the test result of normal drilling sampling, the pitting sampling, shaft sampling, or double - tubles and thin - wall soil collecting methods should be used

    為保證工程安全,對常規鉆孔取樣試驗成果的使用應當慎重,對重要工程宜採用探、豎取樣,或採用雙筒薄壁取土技術。
  11. Combined witch the technical parameters in construction, this article mainly discusses the excavation method of deep end well of subway station, the " time - space effect " principle and the support system in case of complicated large span foundation

    根據「時空效應」原理制定的放坡、開挖單元及支撐架設的技術參數,對安全快速地完成大跨度端頭深基的開挖起到了決定性的作用。
  12. Abstract : in this paper, designs for foundation pit drainage, concrete pouring as well as side wall form, etc in shaft well construction are discussed

    文摘:介紹了豎施工中有關基排水、混凝土澆築以及側壁模板等設計問題。
  13. Article 41 enterprises and institutions shall be forbidden to discharge or dump waste water containing toxic pollutants or pathogens or other wastes into seepage wells or pits, crevices or karat caves

    第四十一條禁止企業事業單位利用滲、滲、裂隙和溶洞排放、傾倒含有毒污染物的廢水、含病原體的污水和其他廢棄物。
  14. A summary introduction is made of the electrovibrating ore - drawing techniques that have been used in shizishan copper mine, which includes the electrovibrating ore drawing of the ore pass in middle section, the one for in - stope ore drawing, the one for the main underground ore bin and the one for the coarse ore bin in the concentrator

    針對獅子山銅礦應用中的幾種電振動放礦技術進行了總結性介紹,它們分別是:中段溜電振動放礦、采場內電振動放礦、下主礦倉電振動放礦、選礦廠粗礦倉電振動放礦。
  15. The use of well dewatering in the engineering of deep foundation pit

    降水在深基工程中的應用
  16. The calculation result effectively indicate the change rule with the time and space of water table of the aquifer, soft dank aquifer, parameter in process of wells work in the pit

    計算成果較好地刻畫了基坑井群的實施過程中含水層、弱透水層水頭、參數的時空變化規律。
  17. This proof following enterprise already through the authentication, and has set up a file in the dongguan 114 nets industry and commerce enterprise database, inquires the more detailed enterprise material, please dial the dongguan enterprise information desk 96060 ( artificially ) 9686810114 billion ( to be automatic ), this enterprise numbers for 3747

    茲證明東莞東坑井美新里鞋廠已通過認證,並已在東莞114網工商企業數據庫中備案,查詢更詳細的企業資料,請撥東莞企業查詢臺96060 (人工) 9686810114 (自動) ,該企業編號為3747 。
  18. Construction practice of deep foundation pit well - point dewatering

    深基坑井點降水的施工與實踐
  19. Designing of well point of deep foundation ditch and problems in its operation and its solution

    深基坑井點降水設計與施工中的問題及其對策
  20. This proof following enterprise already through the authentication, and has set up a file in the dongguan 114 nets industry and commerce enterprise database, inquires the more detailed enterprise material, please dial the dongguan enterprise information desk 96060 ( artificially ) 9686810114 billion ( to be automatic ), this enterprise numbers for 12923

    茲證明東莞東坑井美東泰電機製造廠已通過認證,並已在東莞114網工商企業數據庫中備案,查詢更詳細的企業資料,請撥東莞企業查詢臺96060 (人工) 9686810114 (自動) ,該企業編號為12923 。
分享友人