坑道支撐 的英文怎麼說

中文拼音 [kēngdàozhīchēng]
坑道支撐 英文
gallery frame
  • : Ⅰ名詞(道路) road; way; route; path 2 (水流通過的途徑) channel; course 3 (方向; 方法; 道理) ...
  • : Ⅰ名詞1 (分支; 支派) branch; offshoot 2 (地支) the twelve earthly branches3 (姓氏) a surname...
  • : Ⅰ動詞1 (抵住; 托住) prop up; support 2 (用篙使船行進) push or move with a pole 3 (支持) mai...
  • 坑道 : 1 [采礦工程] (井筒、平峒和巷道的統稱) gallery; adit; mine2 [軍事] (地下工事; 地下通道) (unde...
  • 支撐 : 1 (抵抗住壓力) prop up; sustain; support 2 (勉強維持) support; prop up3 [建築] strut; brace; ...
  1. The pillars sustain the roof of the pit.

    頂用柱子著。
  2. The strength and stability of diaphragm wall are calculated respectively during different period ( digging period and application period etc ), according to different plans in choosing concatenation wall. it is proved that the support plan of excavation protection of meili garden is safe by introducing diaphragm wall and two horizontal steel supports. it is also proved that the total cost of that is low

    針對所選用的地下連續墻方案,分別計算了基開挖期和使用期等不同受力情況地連墻的強度和穩定性,論證了美荔園深基採用地下連續墻和兩水平鋼的基圍護方案是安全可靠的,其綜合成本也是經濟合理的。
  3. The roof of the tunnel was supported by wooden props

    頂用木柱
  4. Type nhss wire rope pulling hoist is widely suitable for use in bridge - construction, laying of large - size pipes, installation and adjusting of machinery an electric apparatus, and large reaction tower of petrochemical industry ; the installation and alignment of storage tanks ; erecting, fitting, welding and alignment of masts, steel concrete timber structures ; laying and translocating of rails and sleepers ; loading and unloading bulky heavy goods during transportation. cable tensioning ; demolishing of gallery supporting logs ; stacking forrestry wood ; and othersimilar cases. the hoist of this series is especially suitable for use in narrow working sites of limited space, where the job is high above the ground or in open air places, in tunnel of deep well, where no power for traction or lifting is available

    Nhss型鋼絲繩手扳葫蘆可廣泛用於建築施工、大型管鋪設、機電設備和石油化工大型反應塔、儲罐的安裝、校準、鐵塔及其它鋼木結構的豎立、拼裝焊接、校準、鐵軌、枕木的鋪設、移位、交通運輸中笨重貨物的裝卸、電線張緊、坑道支撐木的拆除、林區木材的集放等等,對于局部空間受到限制的狹窄工作場所、高空作業、野外作業、、深井作業和無機電供能場所的各種牽引、提升作業、選用本系列產品尤為適宜。
  5. 2. on the basis of the soil and water pressure and the lateral horizontal displacement in - situ investigation the force - resisting coefficient of soil layers are back - calculated. and it is less than that determinged form standard codes and the empirical values

    在基開挖過程中,下一土體開挖對上一的內力和位移有明顯的影響,揭示了經典法(假想梁法、山肩幫男法)的不合理性
  6. The pile building enclosure with two or three bracing pieces and the gravity retaining wall are particularized as example in this paper. from the antithesis with datum practically measured, it indicates that the fem which is adopt by this paper is logical and feasible

    本文分別對兩和三的樁(墻)式圍護結構及重力式擋墻圍護結構基工程進行了有限元模擬計算,根據與實際監測資料的對比分析,表明本文所採用有限元方法是合理可行的。
  7. At the same time, the uniqueness of the back - analyzed parameters is discussed. correctness and suitability are proved by the comparison the calculated with observed results through the practical foundation pit projects with different retaining structures

    通過對不同護形式(無、單、多)的實際基工程的計算與廣東工業大學工學碩士學位論文監測結果的比較,驗證了本文方法的正確性和適應性。
分享友人