坡度計 的英文怎麼說

中文拼音 []
坡度計 英文
slope gage
  • : Ⅰ名詞(地面傾斜的地方) slope Ⅱ形容詞(傾斜) sloping; slanting
  • : 度動詞[書面語] (推測; 估計) surmise; estimate
  • : Ⅰ動詞1 (計算) count; compute; calculate; number 2 (設想; 打算) plan; plot Ⅱ名詞1 (測量或計算...
  • 坡度 : falling gradient; slope; inclination; declivity; pitch; batter
  1. The report takes account into the influence of foreshore and shallow foreshore, roughness, slope, berm, wave attack angle, vertical wall and so on

    報告給出了復雜斷面上波浪爬高和越浪量的算公式,算中考慮了前灘、邊糙率、邊、平臺、波浪入射角以及豎墻等因素的影響。
  2. According to the law of different forest stand can arise different forest fire, based on the existing forest distribution at the badaling forestry center, the area percentage of different forest types, forest age, crown density and slope for each sub - compartment were analyzed, and based on the different characteristics of each sub - compartment, some rational methods of fire prevention were put forward

    摘要本論文基於不同的林分能引起不同的林火特性規律,針對北京八達嶺林場林分狀況,統分析了各林班不同林分類型、林齡、郁閉的面積分佈百分比,根據不同林班林分特點,提出了合理的營林防火措施。
  3. Article 24 the local people ' s governments at various levels sha1l organize agricultura1 collective economic organizations and farmers to manage in a planned way the cultivated land with a slope of above 5 degrees but under the reclamation - forbidden degrees, by taking in line with different conditions such water and soil conservation measures as regulating drainage systems, building terraced fields, and practicing a method of cultivation conducive to water and soi1 conservation

    第二十四條各級地方人民政府應當組織農業集體經濟組織和農民,有劃地對禁止開墾以下、五以上的耕地進行治理,根據不同情況,採取整治排水系統、修建梯田、蓄水保土耕作等水土保持措施。
  4. The hydraulic gradients of settling slurry flow transported in three kinds of moving states, i. e. suspension, saltation, or partially suspension were investigated, based on analyzing the changes of solid particles and water in momentum, velocity and their mass related to momentum exchanging over the acceleration period of the solid particles

    從固體顆粒加速期間清水與固體顆粒的速變化、動量傳遞、相關質量等基本問題分析入手,研究了沉降性漿體在水平管道內流動時其固體顆粒在3種流動狀態下的水力,提出了沉降性漿體在水平管道內流動的機理模型,進而用該模型對一些輸送條件下的沉降性漿體的水力進行了算。
  5. Chemical fume hoods shall be of air foil design with 45 degree sloped sections on the sides and top of the hood opening to insure maximum containment and minimum eddying of air currents

    化學通風櫃應採用風道設,側面成45,罩頂開口,以確保抽氣量最大、空氣渦流最小。
  6. Based on the field exploration and long - term underground observation, this paper reveals the zoning of structure and the timing of mechanical strength for dilative soil, and puts forward the experiment method to obtain values by zoning in the design of dilative soil slope

    通過野外勘探及地下長期觀測,揭示了膨脹土的結構分帶性和力學強的時效性,提出了膨脹土邊中分帶取值和試驗方法。
  7. Based on an analysis of dynamic conditions for migration and precipitation of gold grains in water system and their diffusion in soil, this paper has advanced a discriminant formula for surfacce ore potential of gold anomalies from 1 : 50000 stream sediment survey, recounted methods for estimating the highest gold grade ores within the anomalies, calculated the discriminant indices for qinba area, and summed up index characteristics of ore - induced gold anomalies in 1 : 10000 soil survey, estimation formulae for orebody location as well as coefficients and constants of slope angles of various orders and grades

    摘要在分析金粒在水系中運移、落淤和在土壤中擴散動力條件的基礎上,本文建立了五萬分之一水系沉積物測量金異常地表含礦性的判別公式,闡述了推算異常內礦石最高金品位的方法並算了秦巴地區的判別指數;總結出萬分之一土壤測量礦致金異常的標志特徵、礦體定位的估算公式及各級次地形角的系數和常數。
  8. So, optimization of breakwater planning is of great practical value and should be resolved immediately. at first, the paper narrates the development of numerical modeling, which includes shallow water dynamics theory and method, and compares the boussinesq model and mild - slope equation model. the purpose is to select one model that best fit for wave calculation in harbor engineering

    本文首先綜述了波浪數值模擬的發展概況,其中包括淺水動力學的常用理論和方法,並詳細比較了目前使用較多的boussinesq模型和緩方程模型,其目的是選擇其中較為適合港區工程波浪算的模式,並將其作為優化模型的驗證或用於適應算。
  9. Article 6 where the building lot for a building and connected facilities in a hot spring area is subject to restriction in regard to the gradient of slope of land on which building development is not permitted, the city / county ( municipal ) government with due jurisdiction shall consider the particular characteristics of the hot spring area ? s development in setting other criteria for review in accordance with the proviso to article 262, paragraph 3 of the building design and construction section of the building technical regulations

    溫泉區建築物及相關設施之建築基地,受山陡峭不得開發建築之限制者,直轄市、縣(市)政府應考量溫泉區發展特性,依建築技術規則建築設施工編第二百六十二條第三項但書規定,另定規定審查。
  10. On basis of fractal theory and the principle of fractional brownian motion, this paper puts emphasis on the following parts : firstly, the determination of fractal non - scale range on calculate fractional dimension is discussed, which adopts method associated artificial cognition with track decision. secondly, primeval data are segmented into blocks to evaluate their sub - fractional dimensions. in this process, the maximal value of sub - fractional dimensions in different directions is prioritized

    本文利用分形幾何理論與分形布朗運動原理,重點研究和分析了以下的幾個問題:分形維數算時無標區的確定,使用了人工法與軌跡法相結合的方法;對原始數據進行分塊分別算其子分形維數,考慮了實際地形特徵的方向性,算得到的子維數為局部的最大方向上的方向維數;改進了傳統的隨機中點移位( rmd )內插技術,使用不同的插值比系數進行插值。
  11. On the basis of published research of experts and scholars, relations among the velocity of water, that of solid particles and that of settling slurry have been established by the analysis of momentum transmission between water and solid particles in the upward inclined pipeline. then the calculation formulae for the upward - inclined - pipe hydraulic gradient are derived

    本文在系統總結現有專家學者的研究成果基礎之上,通過分析向上傾斜管道輸送中清水與固體顆粒的動量傳遞過程,從動量守恆的角建立了清水速、固體顆粒速和漿體流速之間的關系,進而推導出了向上傾斜管道輸送的水力坡度計算公式。
  12. Based on the empirical equations used for calculating the cost of main and distribution pipes of gravity sprinkler irrigation project, equations for calculating. 4. economical hydraulic gradient, pipe length and the minimum cost of the main pipe were derived through theoretical analysis and mathematical transformation

    3 .在建立的自壓噴灌工程主幹管和配水管道的造價算經驗公式基礎上,通過理論分析和數學變換,推導得出了自壓噴灌主幹管經濟水力、經濟管長和最低造價算公式。
  13. In the first, an academic concept of the slope spectrum was firstly put forward. the slope spectrum is defined as a statistic graph or a mathematical model with its x - axis denoting the numerical value of the slope factors ( e. g. gradient, aspect or curvature etc. ) and its y - axis the corresponding area on the ground in a specific statistic area

    首先,本文提出了地面譜的理論概念:地面譜是指在一個特定的統區域內,以某項面因子(向或曲率等)的大小為自變量,其對應的地面面積為因變量,構成的統圖表或模型。
  14. Through over - all stability analysis, the influence of height - span ratio, rafter slope to the stability and the effective factors of gable portal frames are also presented in this paper

    通過對門式剛架的整體穩定分析,研究了剛架的高跨比、斜梁對結構的穩定和算長系數的影響。
  15. According to climate condition, soil condition and afforesting tree species and water requirement rule of forest and grass, the paper analysed and calculated the slope length for collecting stream of three site preparation methods which were reverse - slope terrace, level trench and scale - hole, and the slope length for collecting stream of deferent gradients and planting bandwidths were acquired

    摘要根據寧南山區的氣候、土壤、造林樹種等,按照林草植被建設的水分需求規律,對不同水上流失區的反梯田、水平溝、魚鱗坑3種整地方式的集流面長進行分析與推算,算出了不同、植樹帶寬下的集流長。
  16. Original planation surface has some features, for example, it appears in large area with low altitude, small gradient and taking a long formation period, etc. discrimination of planation surface is based on plotting and field investigation and by using statistical methods and " 3s " technique

    原始的夷平面具有分佈面積較大(全流域范圍) 、較小、高較低、形成所需時間較長、有夷平作用的痕跡等特點。基於野外考察和室內作圖,可利用數學統方法和「 3s 」技術進行夷平面的識別,這加強了夷平面研究的精確性、客觀性和定量性。
  17. Based on geometry alignment data and speed difference, by stat. formula are established about the relation between downgrade, curve radius and deflection and speed change. then method to establish speed characteristic curve is present

    依據樣本路段的幾何線形數據和速變化特徵,利用統手段得出了縱、平曲線半徑和偏角等線形指標與速變化之間的關系公式,根據這些公式,給出了一定線形組合求解速特徵曲線的方法。
  18. A 2 - d model for debris flow is tested by experimental data of debris flow deposition. the plane extent, maximum length and width of the alluvial fan are computed under different conditions of supply process, initial ground slope and flow density

    為了驗證二維粘性泥石流運動數學模型的正確性,以泥石流小型堆積模型試驗為模擬對象,算模擬在不同來流方式、堆積區和泥石流容重情況下的泥石流堆積范圍。
  19. In order to develop a new ev fast, low cost, high technology and according with the acquirement of the market, choose advanced vehicle simulation by computer is a good way. in this dissertation, advisor as a simulator, be used to simulate a new kind ev - xl2000. in this dissertation, the author analyzed the technology of the ev, and founded the mathematics models of xl2000 with the battery, motor and the automobile, to simulate the dynamic property of xl2000

    本文在對電動汽車相關技術進行了綜合分析的基礎上,根據xl2000純電動汽車的特點,對動力電池、異步電機和整車受力情況建立了數學模型,主要對整車的動力性進行模擬,設定以下幾項算任務:工況行駛和續駛里程算、最高車速、最大爬坡度計算和加速性能等,在學習advisor軟體的基礎上進行了開發,建立了xl2000型電動汽車的模型,並進行了動力性的算。
  20. Algorithm of road slope estimation for automatic transmission control

    自動變速器控制的道路坡度計算方法研究
分享友人