坡角 的英文怎麼說

中文拼音 [jiǎo]
坡角 英文
angle of slope
  • : Ⅰ名詞(地面傾斜的地方) slope Ⅱ形容詞(傾斜) sloping; slanting
  • : 角Ⅰ名詞1 (牛、羊、 鹿等頭上長出的堅硬的東西) horn 2 (古時軍中吹的樂器) bugle; horn 3 (形狀像...
  1. Angle of repose of cohesionless soils test

    室內土工試驗無粘性土天然坡角試驗
  2. From the aspect of the coupling action of geological and engineering conditions, this paper analyzes their influences on high slope stability. the result shows that constructional surface, lithology, slope angle and height are the most influential factors. provided that a slope angle in a stepped slope is constant, the slope stability is very sensitive to the height / width ratios of steps, and the best design for the slope is to make the height of each step no more than one - third of the total height and the height / width ratio between 1 : 0. 2 - 0. 3

    從地質與工程耦合作用出發,分析了地質因素和工程條件對高邊穩定性的影響,指出結構面、巖性以及坡角高是邊穩定性的重要影響因素,在邊坡角一定的前提下臺階狀邊的臺階高寬比對邊穩定性影響山十分明顯,一般以每級臺階的高度不超過總高的1 / 3 ,高寬比在1 : 0 . 2 0 . 3之間為最佳設計。
  3. This dissertation also analyzed the problem of casually cutting grading angle, which fluently happens in construction of slope engineering

    通過對施工中經常遇到的坡角臨時切割問題進行分析,結果表明。
  4. Through discussion of numerical solution, the author get the effect of height of filled soil, size of culvert, width of valley, property of filled soil, construction procedure and techniques on soil stress of the culvert top ; 3. through the centrifuge test, the paper validates the reliability of numerical calculating on high - stack soil ; 4. the paper puts forward the simplified calculating method of soil stress of the culvert top on the foundation of numerical simulating and centrifuge modeling

    通過對數值解的討論,得到填土高度,涵洞截面尺寸,溝谷底部寬度,溝壁坡角,填築體性狀,施工速度,地下水對豎向位移場及涵洞頂部土壓力的影響情況; 3通過離心機的模擬試驗,驗證了數值計算對高路堤的計算結果的可靠性; 4在數值模擬和室內離心機模型試驗的基礎上,提出了高填方涵洞頂部土壓力簡化計算方法。
  5. Culvert under high - stack soil is a ubiquitous phenomena in road constructions in mountain, self - compression of high - stack soil can not be ignored, soil pressure at the top of culvert is affected by many factors, including the height of high - stack soil, section size of culvert, width of the bottom of valley, grade of valley, property of filled soil, construction procedure and techniques

    高路堤下埋設涵洞是山區公路建設的一種較為普遍的現象,高路堤自身壓縮較大,不可忽視,涵洞頂部土壓力的大小又受很多因素的影響,包括填土高度,涵洞截面尺寸,溝谷底部寬度,溝壁坡角,填築體性狀,施工工序與工藝等。
  6. Stereographic technique is used in the analysis of the footwall slope in the open - pit of bangmoshan iron mine. the slope fracture mode and the slipping direction of unstable blocks are given and the stable slope angle is calculated to be 46

    運用赤平極射投影的方法,對棒磨山鐵礦露天采場下盤邊進行了穩定性分析,給出了邊破壞模式和不穩定塊體的滑動方向,並推算穩定邊坡角為46 。
  7. The collapsing scope of bank accumulation body of zipingpu reservoir in national highway 213 which caused by the sharply falling of water level of zipingpu reservoir is estimated according to the fem plastic zone graph

    根據有限元法得出的塑性區圖,對紫坪鋪水庫蓄水后水位驟降可能引起213國道紫坪鋪庫區庫岸堆積體的坡角坍塌范圍進行了估計。
  8. ( 4 ) for hunshuihe river bridge, the stable angel of yichang and wanzhou bank slopes should be 62 ? and 50 ? respectively ; and the depth of piers on yichang and wanzhou banks should both be 21. 5m and the piers should both be at least 20m away from the slope edge

    ( 4 )混水河大橋宜昌端、萬州端穩定坡角分別為62 、 50 ,橋基埋深均為21 . 5m ,距岸邊緣均為20m 。
  9. The study results reveal some laws : ( 1 ) two failure modes exist in different obliquity slope and influence the internal force of soil nailing ; ( 2 ) the connection between face shield and soil nailing determines the distribution of the axial force along length ; ( 3 ) the influence of face shield involves its connection with soil nailing and its stiffness on soil nailing wall ; ( 4 ) the transversal effect of soil nailing depended on the joint of nail head is little ; ( 5 ) the maximum axial forces of other soil nailings except the first soil nailing increase gradually with excavation

    研究表明: ( 1 )素土隨著坡角的變化,存在兩種破壞方式,破壞方式不同,土釘受力狀態不同; ( 2 )土釘和面層的連接方式決定著土釘長度方向上的軸力分佈形態; ( 3 )面層主要通過面層與土釘的連接和面層的本身剛度兩個方面對土釘內力和墻體變形產生影響; ( 4 )土釘橫向抗剪抗彎作用的發揮程度和土釘釘頭的連接方式有關,但作用不大,實際設計時可以忽略其影響; ( 5 )隨著體的開挖,第一排土釘的最大軸力變化不大,其它土釘的軸力都穩步增加。
  10. In this thesis, analysis of whole performance and interior mechanism of plain soil slope and soil nailing wall with flag finite difference program has been carried out. at the same time, the impacts on the internal force distribution of soil nailing and the deformation of soil nailing wall of many factors, including the connection between face shield and soil nailing, the friction decline between soil nailing and soil, the shear force & bending moment resistance of soil nailing, the cement crack in soil nailing, face shield, excavation, the obliquity of slope, and so on are studied in this thesis

    本文通過flac有限差分程序,分析了素土基坑和土釘墻體的整體性能和內在機理,研究了土釘和面層的連接變化、土釘表面性能的下降、土釘的橫向抗剪抗彎作用、土釘漿體的開裂、面層的有無、基坑的開挖過程、基坑放坡角度等因素對土釘內力分佈和土釘墻變形的影響。
  11. The main achievement has been obtained as follows in the paper : ( 1 ) most of class no. i and ii structure plane of the slope is steep dip and is more steep than the man - made slope, class no. i and ii structure plane do not compose latent local unstable block

    論文研究成果如下: ( 1 )邊、類結構面以中陡傾為主,且大多數大於邊開挖坡角。通過野外調研和理論分析,闡明工程邊開挖面附近, 、類結構面相互未組合成不利塊體。
  12. A solid - waste containment system can be simplified as a slope which contains a layer of geomembrane ( which is simplified as interlayer slope in the rest part ). shaking table model test and numerical analysis have been done to study the seismic stability of interlayer slope based on the two - part wedge theory in this paper. many factors which affect the slope stability ratio, including horizontal seismic coefficient, slope angle, soil - geomembrane interaction coefficient, slope length, layer thickness and soil character, have been took into consideration

    填埋場防滲基坑的邊可以簡化成含土工膜夾層的土(以下簡稱夾層土) ,本文根據「雙滑楔體」理論思想,對夾層土的地震穩定性問題進行了較為系統的模型試驗和數值分析,著重考慮了水平地震系數、夾層土坡角、土工膜與覆蓋層土體摩擦系數、夾層邊長度和厚度、夾層土覆蓋層土體性質等因素對土安全系數的影響,並對地震作用下夾層土的永久變形進行了初步的研究,給出了對實際工程設計有參考價值的結論。
  13. ( 2 ) for yeshanhe river bridge, the stable angel of yichang and wanzhou bank slopes should be 60 ? and 78 ? respectively ; and the depth of piers on yichang and wanzhou banks should both be 10m and the piers should be at least 25m and 24m respectively away from the slope edge

    ( 2 )野三河大橋宜昌端、萬州端穩定坡角分別為60 、 78 ,橋基埋深均為10m ,距岸邊緣分別為25m與24m 。
  14. 6. on the base of the two - phase flow theory, the paper studies the velocity distributing of solid - liquid two - phase flow, acquires the distributing function of velocity and consistence, on the other hand, studies the loosing during flow, and gets the movement equation of solid - liquid two - phase flow. finally, the paper analyzes the flow characters of solid - gas two - phase flow, put forwards the boltzmann equation, gets the critical condition of slope angle tg a > tg ( p1, and brings forwards the relevant m

    ( 6 )分別應用二相流理論研究了固液型碎屑流流速分佈,得出了流速分佈及濃度分佈的方程式,並進一步研究了固液型碎屑流流動過程的弛豫現象,得出了固液型碎屑流的運動方程;同時,分析了固氣型碎屑流(即干碎屑流)的運動特點,給出了固氣型碎屑流的boltzmann方程,得出了干碎屑流的臨界坡角條件哈a2igs 』 ,並給出了滿足此條件下干碎屑流的運動方程。
  15. With the help of this program, this paper does research on the moved backwards of the slide surface, lengthening the anchor section, the soil nail ' s total force, gets conclusion about relations between the soil nail ' s length and the slope ' s grade, height, soil ' s mechanical parameter ; relations between soil nail ' s total force and coulomb soil pressure. with the help of the large multiuse finite element program ansys, this paper analyzes the soil nailing in one - step ' s slopes, in two - steps " slopes, puts the emphasis on the axis force ' s distributing along the soil nail at each rows, the effect of both the excavating mode and the original slope figure to the axis force of the soil nail, the one another effect between the upper - step slope and the nether - step slope in the soil nail ' s axis force, gets conclusion about the design of soil nail at the first low, different slope body is the same with different excavating mode, the original slope figure has more effect to some than others because of the slope body, the reasonably design of the step width in two - steps slopes, the two - steps excavating and retaining has more virtue than the one - step ' s. through soil pressure analysis this paper does research on the differences and the links between the coulomb soil pressure theory and the rankin ' s, the vertical pressure at the slope surface when the slope surface is inclined and the retaining wall is rough, the soil pressure ' s distributing behind the panel, gets conclusion about the effect of both the slope body inner stability and the slope surface local stability to the soil pressure

    通過分析比較,論證了對數螺旋線型比圓弧形作為邊的假設滑裂面具有較多的工程優點,並為此編制了一個採用極限平衡法分析土釘支護的fortran語言程序,以此作工具對滑裂面的后移、土釘錨固段的超長、土釘總力的大小等方面作了研究,得出了有關土釘的長度與邊坡角高、土體力學參數的關系、土釘總力與庫侖土壓力間的關系等結論;採用大型通用有限元數值分析程序ansys分別對採用土釘支護的一階邊、二階邊進行分析,重點是研究各排土釘的軸力分佈規律、開挖方式及原始邊形態對土釘的軸力的影響、上下階邊在土釘軸力方面的相互作用,得出了有關第一排土釘的設計問題、不同類型的土體應適用於特定的開挖方式、原始開挖出的邊形態對一些類型體的邊土釘支護有較大的影響而對另外一些影響不大、二階邊臺階寬度的合理確定、二階開挖及支護比一階時具有較多的工程優點等結論;通過土壓力分析對朗肯、庫侖兩種經典土壓力理論的區別與聯系、面傾斜及墻背有摩擦時的面豎向應力分佈、面板背土壓力的分佈形態作了研究,得出了邊支擋土壓力受體內部穩定與面局部穩定兩個方面的影響、土釘支護面板背土體中卸荷拱的存在對面板受力有利等結論。
  16. On basis of the concrete character of the whole reservoir bank, the reconstruction of reservoir bank is valuated and forecasted by means of analogy method, which means to acquire the ultimately stable slope angel of zone being affected by reservoir water after reservoir storing water by analogy to the slopes " configuration parameters of the yangtze river before the reservoir storing water

    針對庫區的具體情況,採用現代長江河谷岸形態參數類推水庫蓄水后相應水位作用帶的最終穩定坡角,對145m和175m兩種庫水位條件下的庫岸再造進行了預測和評價。預測和評價結果表明,再造強烈的庫岸段累計總長4 . 05km ,占整個庫岸總長( 10 . 352km )的39 . 1 。
  17. Bearing capacity and displacement are two main problems in the application of geotechnical engineering. based on a series of pull - out tests using three kinds of paper and a sort of window screening as geogrid, twenty - seven in limit and several in working - stress geogrid - reinforced slope model tests designed through orthogonal principle have been conducted to have obtained the relationship between the bearing capacity and four factors ( i. e. reinforcement, angle of reinforced slope, the designed - length of reinforcement and the distance between layers of reinforcement ). the law of slope lateral ( horizontal ) displacement versus to the height of slope vary with external - load was derived from the model test data, and the main factor affecting the lateral and vertical displacement of geogrid - reinforced slope was obtained through analysis

    承載力(強度)和變形是巖土工程應用領域的兩大主要問題,本文以紙和窗紗布模擬加筋土邊的土工格柵,在一系列拉拔試驗的基礎上,以正交設計理論分別安排27個極限應力狀態和若干個工作應力狀態加筋土邊模型試驗,並以模型試驗獲得的數據為依據,採用誤差、極差及回歸分析方法,探討了加筋土邊承載力與筋類、筋長、層間距、坡角4因素的相關關系,獲得了在外荷載作用下加筋土邊的側向位移隨高的變化規律(並進行了定性解釋)和頂的豎向位移特性,並分析其主要控制因素。
  18. Study and optimization of working slope angle of open - pit mine

    關于露天礦工作幫坡角的研究與優化
  19. 4. the non - linear interaction mechanism derived from the scale of system was discussed. the paper deemed that, falling sliding face is not a rectilinear type, the non - linear coupling of falling factors sharply enhanced in large sand - pile ; the stabilization of surface layer sands are different in the time and space, especially the stating probability is higher than halting, and probability of fault in slope foot is higher than top as well ; the faulting forms will be affected by bounder situation strongly

    大尺度散粒體面的崩塌滑動面,一般並非直線形,在崩塌過程中的耦合作用將增大落沙規模;理想化的沿直線面滑動情況,面表層砂粒的穩定性也並不是在時間、空間上都均衡的,可以造成起動容易止動難,或坡角失穩概率大從而牽連整個面的情況;長大高陡面的失穩形式,可以受腳(邊界)的巨大影響。
  20. Based on the reservoir bank protection project, the reconnaissance design, the construction, distortion slope body technical and so on, and according to the ecological prospecting and the forecast appraisal achievement of mountainous area reservoir runned for many years, through actual investigation of the collapses of the bank, the distribution distortion, the types and forming conditions, the collapses formation mechanism of the bank and the types of the pattern are analyzed, and of the bank collapsing parameter of each kind of gneiss under and above water stable angle of slope and so on are confirmend

    摘要利用已運行多年的山區型水庫地質勘探、預測評價成果,在掌握庫岸防護工程的勘察設計、施工及變形體的監測等技術資料的基礎上,通過對塌岸及變形的分佈、類型及形成條件等方面問題的實測調查,分析塌岸效應的形成機制及模式類型,確定各類巖土體的水下及水上穩定坡角等塌岸參數。