水庫回水 的英文怎麼說

中文拼音 [shuǐhuíshuǐ]
水庫回水 英文
reservoir backwater
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : 回構詞成分。
  • 水庫 : reservoir水庫岸防護林 reservoir bank protection forest; 水庫測量 reservoir survery; 水庫出流量 ou...
  1. In order to reduce the re - deposit volume of the dredged channel, the method must be based on decreasing the oncoming sediment, changing the mouth site, builting the sediment control dam and raising the reservoir level

    為了最大限度地減小疏浚挖槽的淤量,必須依靠控制上游來沙量、調整入口門位置、加設防淤堤及提高位等手段,而不能通過調整挖泥槽寬度、位置及數量等措施來達到目的。
  2. 8 days round trip from cusco by land and river. 4 days if flying to boca manu

    由陸路及路需八日自斯科來若搭乘飛機至玻卡曼努需四日。
  3. 8 days ( round trip from cusco ) by land and river. 4 days if flying to boca manu

    由陸路及路需八日(自斯科來) ;若搭乘飛機至玻卡曼努需四日。
  4. I have taken impotance to analyze the rallying point of famous product, concrete cost and capability of providing and guarantee in this artical, meanwhile, i have caculated the quantity of concrete needed for the year and got the regression equation with the historic data for drilling footage of eight years and the consuming quantity of oilwell cement by the method of linear regression, and it has very significance for the making of stock contract and the plan of concrete production, i have analyzed the physical distribution of oilwell cement by the transpotation flex and the advantage or disadvantage between direct distribution and distribution to store in this artical, and i have tried to find the balance point of the two distribution ways by the ecnomic analysis and pointd out the conception of economic semidiameter, and come to the conclusion of direct distribution, distribution to store, and subarea of distribution to store at last

    本文對油井泥供應商在品牌號召力、泥成本、供應保障能力等方面進行了詳盡分析,並對供應商進行了能力排序;用線性歸方法從八年鉆井進尺與油井泥消耗量的歷史數據推算了當年度油井泥需求量,得出了歸方程,這對于油井泥采購合同的制訂、泥供應商生產計劃的制訂具有相當重要的意義;從運輸彈性分析出發對油井泥物流配送進行了研究,對直達配送、入配送的優缺點進行了詳細的分析,在經濟分析的基礎上力求找到兩種配送方式的均衡點,並提出了經濟半徑的概念,得出了直達配送、入配送、入分區距離等幾項結論。
  5. This reservoir located in longhui couty, shaoyang, hunan province. the author make a whole tour panning including tour positioning, tour function areas classing and cunstruction, tour landscape planning, tour security guarantee planning, tour envirnment protecting planning and tour marketing. the author try to prove the theories of tour planning for reservoir stated before

    本文最後案例部分以湖南省邵陽市隆縣六都寨為例進行了旅遊開發規劃,從旅遊開發定位與方向、旅遊功能區劃建設、旅遊景觀規劃、旅遊安全保障規劃、旅遊環境保護規劃、旅遊市場宣傳等多個角度去驗證前述旅遊開發理論。
  6. Main results are as follows : ( 1 ) the analysis about water supply source. this paper analyzed the river water without and with configuration engineering to sure the reliable quantity of surface water ; analyzed the underground water source near river and in the urban to sure the reasonable quantity of exploitation, considered the recycle of sewage, evaluated the ability to the ensure city water supply

    對地表源包括無調蓄工程的峪(河)、有控制的峪(河)進行文分析,確定地表的可利用量;對傍河地下源和城區自備井所開采地下源進行分析,確定地下的合理開采量;並考慮污用,對城市供源綜合保證能力進行全面評估。
  7. The foreground of multi - source utilization of rain water and flood, recharge and replenishment, water reuse, and the method of operation and scheduling rule of groundwater reservoir were established

    預測分析了濟寧市未來時期雨利用、灌補源、污處理利用等多源開發的前景,並對濟寧市地下的調度運用進行了規劃。
  8. Based on the topographic features and data of sediment particle size of bed load at the fluctuating backwater reach of liujiaxia reservoir, the streamwise variation and variation process of median diameter of bed load during silting and scouring periods of the fluctuating backwater reach are analyzed, and it can be seen that the turning point for the sediment diameter variation from coarse to fine is located at the outlet of shigou gorge of the fluctuating backwater reach

    摘要根據劉家峽變動區的河段地形特徵和歷年河床質泥沙粒徑級配資料,分析了變動區河段淤積和沖刷時,河床質泥沙中值粒徑的沿程變化和歷年河床質泥沙中值粒徑變化過程,並指出粒徑分佈由粗變細的轉折點在變動區寺溝峽峽口處。
  9. Qualitative analysis on the effect of flood control and engineering safety -, seizing lots of water conservancy effective adjust storage. then making water level risen and reservoir backwater enlarged in the same flow level ? effect on beach and the buildings across river, soil salinization caused by flow from a lower to a higher place and unsmooth groundwater drainage destroy of travel resource caused by disorder enclose tideland for cultivation in reservoir silt up flood plain are given, then presents enclose tideland for cultivation dyke is important cause which water level rise in reservoir

    本文從青銅峽泥沙淤積入手,分析泥沙淤積特性和區圍墾堤開發利用淤積灘地的現狀,對防洪安全及工程安全的影響、侵佔大量的有效調蓄容、造成同級流量下位抬升水庫回水上延、對沿岸及過河建築構成影響、因位抬升致使區周邊灌區地下不暢乃至倒灌而造成土地鹽堿化、對區大量淤積灘地無序圍墾造成旅遊資源破壞等五方面影響的定性分析,提出區圍墾堤是位抬升的重要原因。
  10. In this paper, based on much connected and basic data about fenhe first reservoir, second reservoir and shanxi wanjiazhai yellow river diversion project, etc, the multi - object optimal model for united operation of fenhe first and second reservoirs was found, the operation rule by using multiple regression technology in optimal outcome for them was also made

    本文參閱了大量國內外有關文獻、並全面收集了汾河一、汾河二、引黃工程等基本資判。的基礎上,建立了汾河、二聯合運用的多目標優化模型,並對優化結果用多元歸擬合技術制定了汾河一、汾河二的運行規則。
  11. The participants will run along sai kung man yee road to the east dam of high island reservoir where they will return and finish the race at the junction of sai kung man yee road and sai kung sai wan road

    參加者將會沿西貢萬宜路跑向萬宜東壩,再折跑至位於西貢萬宜路與西貢西灣路交界的終點位置。
  12. The usual measuring method, that is, to use the water temperature of 1 meter under water surface to adjust the spinning speed of the sounding device, will result in greater measuring errors. this article put forwards the mathematical model of water temperature with the vertical water temperature that was measured at the deepest site of six sections. after adjusting the sounding device w

    本文依據實測的6個斷面深泡點處的垂線溫建立了溫輔助測深數學模型,依據該模型即可得到保證聲儀測深精度的溫值,用該溫值校正聲儀后,便可得到斷面對應于各起點距處的深值,從而解決了丹江三維模型建立的關鍵問題。
  13. The 3d model needs three parameters, among them, the distance from the dam and the distance from the starting point of the section can be measured directly, and the depth of the water corresponding to the distance from the starting point of the section can be measured by the sounding device. however, because the reservoir is very deep, the measuring error of the water depth is greater

    而建立其三維模型需要三個參量,其中距壩里程、備斷面起點距可直接測得,而對應于各起點距的深值因丹江口較深,按通常的方法使用聲儀測深,即以下二米處的溫校正聲儀的轉速來測深有較大誤差。
  14. ( 6 ) the reservoir operation function is established utilizing the optimal dispatching results. the state variable and decision variable of the operation function is discussed, and the stepwise regression method is used to derive the operation function. because of the nonlinear features of the function have n ' t been reflected in traditional regression methods, the back - propagation neural network model is introduced to establish the operation function

    ( 6 )利用優化調度結果建立調度函數,在分析調度函數各特徵量的基礎上,介紹了用逐步歸方法建立調度函數的具體過程,考慮到傳統歸方法未能反映調度函數的非線性特性,引入bp神經網路模型求解模型,建立調度函數。
  15. The qingtongxia reservoir is the important travel and cultivation zone in nixia hui autonomous region. in order to strengthen the cultivation of traveling resources, full environmental control should be taken around the reservoir

    青銅峽區是寧夏族自治區重點旅遊開發區,為加強旅遊資源的開發,應對區周邊西安理工大學工程碩士學位論文環境進行全面治理。
  16. Abstract : it was introduced in the paper on the basis of the famous tide model of s21hd, the sediment calulation for the design proposal of the reservoir of dandong power plant had been given by the newly setup generalized model of overall sediment which relying upon the data of original observation, and the relative wave model test conclusions and the forecast results of sediment by the joint action of wave and current were quoted

    文摘:簡要介紹以著名的潮流模型s21hd為基礎,用新建的依賴于原觀資料的全沙沖淤概化模型,對丹東電廠蓄設計方案進行的淤計算;引述了相應的波浪模型試驗結論和浪、流聯合作用淤積預報結果。
  17. To construct the high island reservoir, it was necessary to take back 2. 3 million sq. ft. of private agricultural land and 0. 61 million sq

    至於興建西貢萬宜,政府更需收附近230萬平方尺私人耕地及6
  18. The main points of this topic as follows : 1. review the changing at home and abroad of the reservoir " s seepage control on the carst region

    主要工作和結論如下: 1 、全面顧了國內外巖溶地區防滲的現狀和發展趨勢。
  19. " thirdly, the seepage monitoring data of dongzhang dam are analyzed with stepwise regression method ; the origin of some abnormal uplift pressure drill holes is studied. the factors affecting seepage are revealed and several disadvantages will be controlled

    3 、應用逐步歸分析的統計方法對東張大壩滲流觀測資料進行分析,研究了部分揚壓力測孔異常情況的起因,揭示大壩滲流的變化規律,為控制不利因素實現大壩的安全運行提供有益的依據。
  20. A multi - degree regression analysis model for formulation of reservoir operation function is established

    摘要建立了決策變量與其影響因素間的多層遞階歸分析模型。
分享友人