水庫回水計算 的英文怎麼說

中文拼音 [shuǐhuíshuǐsuàn]
水庫回水計算 英文
computation of reservoir backwater
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : 回構詞成分。
  • : Ⅰ動詞1 (計算) count; compute; calculate; number 2 (設想; 打算) plan; plot Ⅱ名詞1 (測量或計算...
  • : Ⅰ動詞1 (計算數目) calculate; reckon; compute; figure 2 (計算進去) include; count 3 (謀劃;計...
  • 水庫 : reservoir水庫岸防護林 reservoir bank protection forest; 水庫測量 reservoir survery; 水庫出流量 ou...
  • 計算 : 1 (求得未知數) count; compute; calculate; reckon; enumerate 2 (考慮; 籌劃) consideration; pla...
  1. I have taken impotance to analyze the rallying point of famous product, concrete cost and capability of providing and guarantee in this artical, meanwhile, i have caculated the quantity of concrete needed for the year and got the regression equation with the historic data for drilling footage of eight years and the consuming quantity of oilwell cement by the method of linear regression, and it has very significance for the making of stock contract and the plan of concrete production, i have analyzed the physical distribution of oilwell cement by the transpotation flex and the advantage or disadvantage between direct distribution and distribution to store in this artical, and i have tried to find the balance point of the two distribution ways by the ecnomic analysis and pointd out the conception of economic semidiameter, and come to the conclusion of direct distribution, distribution to store, and subarea of distribution to store at last

    本文對油井泥供應商在品牌號召力、泥成本、供應保障能力等方面進行了詳盡分析,並對供應商進行了能力排序;用線性歸方法從八年鉆井進尺與油井泥消耗量的歷史數據推了當年度油井泥需求量,得出了歸方程,這對于油井泥采購合同的制訂、泥供應商生產劃的制訂具有相當重要的意義;從運輸彈性分析出發對油井泥物流配送進行了研究,對直達配送、入配送的優缺點進行了詳細的分析,在經濟分析的基礎上力求找到兩種配送方式的均衡點,並提出了經濟半徑的概念,得出了直達配送、入配送、入分區距離等幾項結論。
  2. In this part, the first work is pretreatment of a numerical model, including creating calculating grids automatically, improvement of the linear boundary technique and so on. the second work is to estimate the siltation of a basin or channel by liu ' s equation. the third work is to build an edbms ( engineering data base management system ) for the result of mathematical model

    其中主要的工作是:其中主要的工作一是數學模型的前處理,網格自動生成,線邊界法的優化;二是應用劉家駒公式在長江口深航道治理工程地理信息系統的支持下實現港池、航槽開挖的實時淤估;三是將成果形成gis管理和支持下的工程數據系統( engineeringdatabasemanagementsystem ) ,同時嘗試解決時間序列數據如地形沖淤變化,潮位、流速過程的分析、查詢和顯示問題,並實現實時、互動的動態演示及三維可視化。
  3. Abstract : it was introduced in the paper on the basis of the famous tide model of s21hd, the sediment calulation for the design proposal of the reservoir of dandong power plant had been given by the newly setup generalized model of overall sediment which relying upon the data of original observation, and the relative wave model test conclusions and the forecast results of sediment by the joint action of wave and current were quoted

    文摘:簡要介紹以著名的潮流模型s21hd為基礎,用新建的依賴于原觀資料的全沙沖淤概化模型,對丹東電廠蓄方案進行的;引述了相應的波浪模型試驗結論和浪、流聯合作用淤積預報結果。
分享友人