Abstract : large transmission main pipe line engineering, treated foundation on deep muddy, thick backfilling ground is introduced in this paper, cement mixed combined earth foundation is designed and calculated, pipe bridge 、 pipe pass through dam and etc, technical measures are also introduced
文摘:本文介紹深淤泥厚填土場地大型輸水干管工程的地基處理,水泥攪拌樁復合地基基礎設計與計算及過橋管、過堤管等的技術處理措施。Through the practice of deep foundation top - down for youyou international square, some key construction techniques were introduced, including structure of bored and double stirring piles, down - top construction in high - rise buildings, top - down in low - rise buildings, protection of railways, methods for excavation
摘要通過由由國際廣場深基坑逆作施工實踐,著重介紹了灌注樁加雙排攪拌樁止水帷幕圍護體系、主樓順作裙房逆作、電纜翻交、軌道交通四號線保護、挖土施工等關鍵施工技術。Considering that the load was added in steps, dynamic design based on in - sile test parameter is an effective and practical method. based on the author ' s experience of djm composite ground engineering, and two projects of highway djm composite ground, it systemically analyzed and summarized the in - site test result as well as the settlement deformation, pore water pressure dissipation, deep horizontal displacement, stress ratio, stress of pile. etc. it also compares the in - site test results of djm composite ground with or without rigid bearing stratum, and draws many practical conclusions
根據筆者多年粉噴樁加固路基工程的經驗,結合兩個高等級道路粉噴樁加固路基工程實例,全面系統地分析和總結了現場試驗路段試驗結果,對攪拌樁復合地基沉降特性、孔壓消散特性、深層水平位移特性、樁土應力比、樁身應變等作了深入細致地分析,對有硬持力層和無硬持力層(浮樁)的粉噴樁復合地基現場試驗結果作了對比,得到了許多有應用價值的結論。The action mechanism, construction technology of deep cement mixing pile and inspection for the project as well as the advantage of using deep cement mixing method to consolidate soft soil foundation were expounded in the paper by the actural example of the coal yard expended southward of no. 1 and no. 2 berths of the phase two project, beilun
通過北侖港區二期1 、 2泊位煤炭堆場南延工程實例,闡述了深層水泥攪拌樁的作用機理、施工工藝、工程檢驗以及應用深層水泥攪拌樁加固軟土地基的優點。According to the prior achievements, based on pile deformation test data, it puts forward a method that combined the mindlin ' s solution with boussinesq ' s solution to calculate the superimposed stress of djm composite ground, and then uses the superimposed stress to calculate the settlement by layer - wise summation method. by a nonlinear elastic and viscoelastic fem model, based on in - site test data, the back - analysis method of the direct optimal multiple parameters are adopted to calculate the road embankment settlement of typical project
在前人的基礎上,結合樁身應變測試結果,提出了聯合mindlin解和boussinesq解求解攪拌樁復合地基的附加應力的方法,根據計算出來的附加應力再用分層總和法計算攪拌樁復合地基的沉降;採用非線性和粘彈性有限元模型,根據現場實測資料,運用直接優化多參數反演分析方法,對典型工程實例進行了沉降計算對比分析。Further more, the computer code pdss is used to analyze the consolidation process of composite ground with cement - mixed columns under one teaching building and under one laboratory building, respectively, and the principle of the developments of excess pore water pressure in these composite ground and of the settlement is revealed. finally, the fem results are compared with the ones obtained from traditional method and field observation, and the feasibility of using pdss to calculate the settlement of composite ground with cement - mixed colu mns after construction of building is discussed
進而運用pdss程序對一教學樓和一實驗綜合樓的水泥攪拌樁復合地基的固結過程進行了較完整的數值計算,分析了該類復合地基中超靜孔壓和基底沉降的發展規律,並通過與規范法計算值和現場實測數據的比較,討論了採用pdss程序計算建築物下水泥攪拌樁復合地基沉降和工后沉降的可行性。分享友人