填築機械 的英文怎麼說

中文拼音 [tiánxiè]
填築機械 英文
positive appliances
  • : 動詞1. (墊平或塞滿) fill; stuff 2. (補足; 充滿) replenish; supplement; complement 3. (填寫) fill in; write
  • : 築名詞(貴陽的別稱) another name for guiyang
  • : machineengine
  • : 名詞1. (器械) tool; instrument 2. (武器) weapon 3. [書面語] (枷和鐐銬之類的刑具) fetters, shackles, etc
  • 機械 : 1. (利用力學原理組成的各種裝置) machinery; machine; mechanism 2. (死板; 刻板) mechanical; inflexible; rigid
  1. Shuguang flexible shaft plant was built in 1985, is specializing in the production of motor vehicles, medical, architectural, mechanical assembly soft enterprises and filled gaps in hebei province, the provincial science and technology commission for funding support

    曙光軟軸廠始建於1985年,是專業生產各種動車、醫療、建軟軸總成的企業,補了河北省的空白,由省科委撥資輔助。
  2. The results simulated by the program are compared with the experiments. the experimental data come from the smoke filling experimental data conducted by ustc, the data of gravity venting and smoke exhaust in the examples of the report of the development on fire protection design in buildings, written by japanese construction commission, and the smoke exhaust experiments data conducted by the author

    論文中將中庭煙氣管理系統各部分的程序模擬結果分別與中科大煙氣充的實驗結果、日本建設省所編寫的《 '建物防火設計法的開發'報告書》 (第3卷)中的自然排煙和排煙的算例結果以及筆者所做的中庭排煙正交實驗結果進行了比較。
  3. Based on the productive rolling experiments on two material sources of the excavated debris for construction of the downstream side of dam body, the compaction characteristics of the materials are analyzed and the rationality of the related design filling standards are verified, and then the economic and reasonable compaction method, rolling equipments and the construction parameters accorded with the filling standards concerned are recommended as well

    摘要通過對下游壩體石渣料的兩個料源進行生產性碾壓試驗, ?解分析其壓實特性,核實設計標準的合理性,推薦達到標準的經濟合理的壓實方法、類型、施工參數等。
  4. Based on the roller - compacted test, check on construction and observation during operation, the fill - criteria of the design for the dam is obtained, and then the economic and reasonable roller compacted method, including selection of the roller, mechanical parameters, watering amount for material of sandy gravel etc., is determined as well

    摘要通過碾壓試驗、施工復核及大壩運行觀測,得到了大壩的設計標準,從而確定了經濟合理的壓實方法,包括壓實選型、參數、砂礫料加水量等。
分享友人