墩柱的身 的英文怎麼說

中文拼音 [dūnzhùdeshēn]
墩柱的身 英文
shank
  • : Ⅰ名詞1. (土堆) mound 2. (墩子) a block of stone or wood Ⅱ量詞(用於叢生的或幾棵合在一起的植物) cluster
  • : 4次方是 The fourth power of 2 is direction
  • : Ⅰ名詞1 (身體) body 2 (生命) life 3 (自己; 本身) oneself; personally 4 (人的品格和修養) on...
  1. Visual impacts will be mitigated by treesclimbers planting below the viaduct and on columns and parapets, reinstatement of fishponds and integration of the viaduct design with the local environment

    九鐵會在高架橋下面種植樹木,並以攀藤植物粉飾橋,而高架鐵路設計亦會盡量與環境融和,把視覺上影響減至最少。
  2. Works are accomplished as follows in this paper : firstly, according to the real condition of the fourth pier, through analysis of several generally - used anti - slipping schemes, new method has been put forward to substitute anchored column pile with the foundation of drilled shafts so as to prevent cofferdam from slipping

    為此本文主要做了以下工作:首先根據4 #基礎具體條件,通過對現有常用幾種抗滑方案綜合比較分析,提出了以工程本鉆孔樁基礎代替錨固樁防止鋼圍堰滑移方案。
  3. By finding the big penetrating crack in wangpu aqueduct upper frusta structure, the task group has adopted the integrated measures of chemical perfusion, carbonized fibre reinforcement and doping external surfaces to effectively reinforce the work, and improved the reinforcing techniques considering the characteristic of hydraulic engineering, made remarkable benefit in social, economic aspects

    摘要針對王鋪渡槽上部結構出現大開度貫穿性裂縫,經過全面分析和多方案綜合對比,採用裂縫化灌、碳纖維加固、外表面刷塗水性環保型乳膠漆外墻塗料作為防護綜合措施對原工程進行有效加固處理,並結合水利工程特點改進了加固技術工藝,取得了顯著經濟和社會效益。
  4. Next, a three - span curve continuous box beam has been studied by fem, and how to set the single - pedestal pier in curve continuous box beams has been discussed. when setting the single - pedestal pier, the vehicle flow should be inspected firstly, and then a best offset distance should be selected within the feasible range of the offset distance. meanwhile, increase the spacing interval of the double supports to the largest extent when installing a double supports on a sharing single - pedestal pier, which can enhance the stability and security of the bridge as a whole

    對上石立交橋中一座三跨連續曲線箱梁進行有限元分析,詳細地討論了在曲線箱梁中如何合理設置獨問題,分析表明獨設置應該根據車流調查實際情況,再結合結構本特徵,在可行偏距范圍內選擇一個最佳偏距,另在對公共雙支座進行設置時候應該盡量使雙支座間距增大,這樣可以保證橋梁整體穩定性和安全性。
  5. Also this paper analyzes the effect of different substructure constraint conditions or the size of pier on pier and beam in the light of the use of single - line piles with large diameter, taking into account the mutual effect of pile - earth - structure and the typical mechanic model used. with the analysis result of construction and traffic stages, the suggestion that single - line piles with large diameter claim precedence over all others is submitted in the design of continuous rigid - framed bridge of middle span

    對單壁樁式橋連續剛構而言,當尺寸改變時,抗推剛度武漢理工大學碩士學位論文亦相應改變,從而對及樁基受力影響顯著,且受力與自承載能力所要求剛度成反比。
分享友人