墻的外表面 的英文怎麼說

中文拼音 [dewàibiǎomiàn]
墻的外表面 英文
face of wall
  • : 名詞(磚、石等築成的屏障或外圍) wall
  • : 4次方是 The fourth power of 2 is direction
  • : Ⅰ名詞1 (外面) outside; external side 2 (外國) foreign country 3 (以外) besides; beyond; in ...
  • : Ⅰ名詞1 (外面;外表) outside; surface; external 2 (中表親戚) the relationship between the child...
  • : Ⅰ名詞1 (頭的前部; 臉) face 2 (物體的表面) surface; top 3 (外露的一層或正面) outside; the ri...
  • 表面 : surface; superficies; boundary; face; rind; sheet; skin; outside; appearance
  1. Evolution has thus arranged things so that if a woman does cuckold ( a man married to an unfaithful wife ) her man, she is likely to gain the maximum advantage in terms of children with good immune systems, and sons who will have similarly rakish ( having a trim, streamlined appearance ) good looks and behaviour

    人類進化就是這么安排,所以,如果一個女性紅杏出,搞婚情,她實際上是從孩子角度出發,為了讓孩子在免疫系統方獲得最大優勢,這樣孩子們就會擁有類似英俊和言談舉止。
  2. Externally, the broad, smooth surfaces of stuccoed walls and the great unconcealed masses of vaults and domes pile up impressively

    上,寬闊,平滑粉刷和巨大,公開各個拱頂和圓屋頂堆積了令人難忘回憶。
  3. The study on salc includes : 1 ) the study on the harmonization between aeration rate and melts thickly rate ; 2 ) the study and application of the new multi - function composite additive ( nmca ) ; 3 ) the study on the durability of salc ; 4 ) the designation of the structure of new multi - functional unbearing compound wall and fast equipment mold, etc. the results show : the additive can improve the harmonization of the workability and mechanics characteristic of salc to a certain extent ; improve the volume stability of salc under different environment by enhancing the resistance to the freeze and thaw, dry and wet circle and drying shrinkage

    在salc研究方,主要包括發氣速度和稠化速度協調性研究、新型多功能復合加劑研製、耐久性能研究以及新型多功能非承重復合體結構及其澆注成型快速組裝模具設計等內容;結果明:科學合理引入輔助加劑在一定程度上使salc材料工作性及相應物理力學性能得以最佳匹配,增強了salc材料對凍融循環、干濕循環及乾燥收縮抵抗能力,使salc在不同環境下均具有較好體積穩定性。
  4. The huge thermometer is fixed outside the building of the provincial observatory, stretching from the ground floor to the 18th floor

    這只巨型溫度被安裝在省觀象臺大樓,從1樓一直延伸至18樓。
  5. And it can be concluded that cracks on top floor ' s walls are caused by the temperature difference between floor or wall ' s inner and outer surface and the temperature difference between floor and walls. if the floor and wall ' s thermal resistance is appropriate, the cracks issue on cscbb can be solved

    分析明,砌體建築頂層裂縫主要是體、屋板內溫度差異和屋板、體之間溫度差異所致,因此如果體和屋保溫隔熱措施合適,砌體建築溫度裂縫問題是可以解決
  6. Proceed from energy - conserving angle of building, a kind of passive evaporative cooling way is proposed that applies to the wall surface, namely porosity moisture - conditioned material is used on building envelope

    摘要從節能角度出發,提出一種應用於建築被動蒸發冷卻方式,即將多孔調濕材料貼附於,這種材料兼具自動吸放濕性能和蒸發冷卻性能。
  7. Features of roller coating ceiling : 1the roller coating undergoes the treatment process on the surface of alumbond panel

    1滾塗天花是用裝飾業中鋁塑板處理工藝來生產
  8. It is suitable to clean bathroom, bathtub, kitchen utensils, plastic, metal - articles, glass articles, walls and any smooth surfaces which are not water - absorbent

    適用於浴室浴缸洗手盆廚房用具塑料品金屬品玻璃品壁磁磚電器用品殼,及其它平滑但不吸水對象。
  9. Two typical examples analyses are conducted for the average conditions both of winter and summer climates under vapor diffusion and air leakage. a further discussion is set forth to determine the main factors that the moisture accumulation in wall is affected. it is found that the factors are the relative humidity at the wall surface, indoor temperature, permeability, air pressure difference and rate of the infiltrative or exfiltrative airflow

    本文首先研究了體內濕氣遷移過程,詳細分析了濕積累現象形成原因,通過對夏、冬兩季平均氣候下內溫度、水蒸氣壓力、相對濕度及濕積累在僅有擴散、擴散與空氣滲透同時存在等情況所作具體計算,發現內、相對濕度、室內溫度、滲透率、空氣壓差以及空氣滲流速度是影響內濕積累主要因素。
  10. Structural columns and walls on external elevations and in common parts

    結構柱及公用地方結構柱及
  11. The results of experiments shows that core column can increase flexural and shear resistant capacity and improve deformability and entirety of composite walls ; it is coordinate ductility of two composite walls joining wire or steels out - of - plane ; the seismic of composite walls joining with wire is fine than joining with steels ; the deformation of out - of - plane only affect the crack - loading, the ultimate carrying capacity and ductility in - plane nearly has no change

    片試驗明:芯柱可以增加復合抗彎和抗剪承載能力,改善變形能力和整體性;分別應用鋼絲網片和鋼筋連接兩種復合延性大致相同,內協同工作良好;內之間連接提高了砂漿層抗拉強度,同時也提高了復合體向方向抗推和抗拉承載力。
  12. In a book written by an electronics expert who once participated in the us star wars program, the author discussed his findings in his studies on several fallen ufos unidentified flying object. according to him, ufos do not look very big from the outside, but after entering them, one might spend twenty minutes walking without reaching the opposite end due to a conversion of time and space. unlike an aircraft cockpit with dashboards and maneuvering devices, the ufos have only a few seats, surrounded by walls which themselves serve as jumbo tv monitors

    他在對多種墜落幽浮星人飛行器考察研究時發現,從看幽浮並不很大,但進去后卻走二十多分鐘走不到頭時空轉換,而且裏沒有像飛機駕駛艙內那樣眾多及操縱裝置,只有幾個坐椅,四周壁就是大屏幕觀測電視,內部也沒有復雜集成電路,只有大晶體塊,整個飛行器完全是在星人頭腦發出電磁波控制下運行。
  13. Granite imitate stone coating is a kind of coating which imitate the impression of nature stone, it looks like the face of granite, could instead of nature stone

    花崗巖仿石塗料是一種仿天然石材裝飾效果厚質裝飾塗料,塗層酷似花崗巖石,具有強烈巖石質感,達到以塗料代替天然石材、創造高貴典雅裝飾效果。
  14. By finding the big penetrating crack in wangpu aqueduct upper frusta structure, the task group has adopted the integrated measures of chemical perfusion, carbonized fibre reinforcement and doping external surfaces to effectively reinforce the work, and improved the reinforcing techniques considering the characteristic of hydraulic engineering, made remarkable benefit in social, economic aspects

    摘要針對王鋪渡槽上部墩柱結構出現大開度貫穿性裂縫,經過全分析和多方案綜合對比,採用裂縫化灌、碳纖維加固、刷塗水性環保型乳膠漆塗料作為防護綜合措施對原工程進行有效加固處理,並結合水利工程自身特點改進了加固技術工藝,取得了顯著經濟和社會效益。
  15. The projecting balcony and granite plaster wall surface reflect the eclectic spirit of the time

    汰石子陽臺,現了當時建築潮流中折衷主義時髦。
  16. Standard guide for assessment and maintenance of exterior dimension stone masonry walls and facades

    部石評價和維護標準指南
  17. I set up the mathematics model of heat transfer of the thermal bridge of the building and utilize numerical method to analysis whether occur condensation problem on the internal surface in the thermal bridge or not. through the analysis and studying of this subject, we can make conclusion as followed : because the internal surface of the bared wall body incline to be lower than the air dew point indoor, which apt to dew, with the reducing of out air temperature and increasing of the air temperature indoor

    ,通過建立建築熱橋傳熱數學模型,利用數值求解方法,分析了熱橋部位內是否結露問題,研究得出裸露體內極易低於露點溫度而結露,並且隨著室溫度降低,室內溫度越高,熱橋部位越容易結露。
  18. This article describes the main forms of water leakage through exterior walls and on the basis of hydromechanics and surface physicochemistry deduces theoretical formulas for the computation of the depth of infiltration of water through walls, its infiltration rate and infiltration duration and thus makes quantitative evaluation of the main influential factors and their influential degree for the water leakage through exterior wall

    介紹了建築滲漏主要形式,並根據流體力學及物理化學理論,推導出水在體中滲透深度、滲透量及滲透時間理論計算公式,從而對滲漏主要影響因素及其影響程度進行定量評估。
  19. Beams and slabs on external elevations and in common parts

    及公用地方橫梁及樓板
分享友人