壓制混凝土 的英文怎麼說

中文拼音 [zhìhúnníng]
壓制混凝土 英文
compressed concrete
  • : 壓構詞成分。
  • : Ⅰ動詞1 (製造) make; manufacture 2 (擬訂; 規定) draw up; establish 3 (用強力約束; 限定; 管束...
  • : 混形容詞1. (渾濁) muddy; turbid2. (糊塗; 不明事理) foolish; stupid
  • : 動詞1. (凝結) congeal; curdle; coagulate 2. (注意力集中) fix
  • 混凝土 : concrete; beton; jetereting混凝土壩 concrete dam; 混凝土板 concrete slab; 混凝土標號 concrete gra...
  1. Based on the analysis of mechanism for joint region, the " frame - wall " and " aslope compression stub column " mechanical models and yielding patterns of core zone of the joints are set up. the shear load - carrying formulation for joint core zone is also given in terms of plastic ultimate analysis. and then, the comparisons between the formulas given in this paper and that of chinese design code ( draft ) and nonlinear fem as well are presented

    對節點核心區的抗剪,通過受力機理的分析,建立了鋼「框架剪力墻」加「斜短受力體系及其屈服機,根據塑性極限分析,給出了節點核心區抗剪承載力計算的迭加公式, 《規程》公式和非線性有限元近似模擬分析結果進行了比較。
  2. Precast autoclaved aerated concrete wall roof panels

    加氣墻板和屋面板
  3. Based on the simulation model theory of temperature and stress fields presented in this article, a large simulating program for high rccd has been developed, which can numerically simulate all kinds of temperature control measures, including water pipe cooling, heat insulating in winter, reducing place temperature of concrete, spraying water brume, and long interval over - watering surfaces overflowing in flood season.

    基於本文提出的溫度場和徐變應力場模擬模型理論,編了高碾壩的三維有限元模擬計算程序,在程序中考慮了各種溫控措施的數值模擬,包括:水管冷卻、冬季保溫、降低的澆築溫度、夏季表面噴水霧、施工汛期壩頂面過水等。
  4. Abstract : duri ng concrete deep well constructi on , because of thediffi culti es i n engi neeri ng geographi cal conditi ons , the ordi nary bilateral hydrauli c sli di ng formwork technology can not be adopted. therefore , an unilateral sli di ng formwork technology lifted by chai n block method can beappli ed to advantage and better solved the proble m

    文摘:在深井施工中,由於受地理環境的限,不能內外安裝模板時,難以應用一般的液滑模施工技術,而採用單面模板、鏈條葫蘆提升滑模工藝,可較好地解決這一問題。
  5. The important meaning in which this direction studied has lain in establishing the connection between the material science of concrete and civil engineering, analyse the strength in terms of material microcosmic or the mesoscopic, have important meaning to understanding, know the essential law of the strength of concrete. this text divides six chapters altogether. chapter one reviewed the pore structure in nowadays domestic and international research current situation, including the concrete examines research, research of the pore structure model and the research current situations of pore structure and strength relation of the pore method, have introduced some most important achievements of structure research of pore ; chapter two narrated much yardstick of the material mesoscopic structure of concrete and principle of examining pore technology of material of concrete, and the commonly used sign parameter in discussedding the pore and material pore of quito of cement and analyse, have explained that the influence factor of mip to the result of study of pore, has pointed out the limitation in mip in the pore structure ; analyse porosity and strength relation development course of model emphatically, and has carried on comparative analysis to the existing model, has pointed out the weak point of the original model ; on the basis of " ing integrate synthetically ", propose concrete pore structure compound body model and pore physical model of systemlex body ; chapter five carried on the corresponding test data to compares to the model parameter appearing in model of chapter four with and analyses, have received k value of the characteristic of strength of matrices of reflecting according to the method to return to analysis, and calculate the influence produced on the strength of concrete in revision that can probed into the content of cement, elastic mould and surface energy, exactness of the inspection model ; chapter six is the conclusion, according to studying the survey this text to some research conclusions of the pore structure and making corresponding prospect to the structure development of pore

    第一章回顧了孔結構在當今國內外的研究現狀,包括測孔方法的研究、孔結構模型的研究及孔結構與強度關系的研究現狀,介紹了孔結構研究方面的一些最重要的成果;第二章敘述了材料細觀結構的多尺度性及材料測孔技術的原理,並討論了水泥基多孔材料孔隙分析中常用的表徵參數,也說明了汞法測孔對研究結果的影響因素,指出了汞法在孔結構研究中的局限性;第三章是著重分析了孔隙率與強度關系模型的發展歷程,並對已有的模型進行了比較分析,指出了原有模型的不足之處;第四章在「綜合集成」的基礎上,提出了孔結構復合體模型和孔系統的物理模型,並模擬了該模型下由各單體並聯形成的復合體的斷裂過程,最後根據所建模型編了相應的計算程序,可根據輸入的孔徑分佈與水泥含量等參數,實現理論強度的計算;第五章對第四章模型中出現的模型參數進行了相應的試驗數據對比分析,根據回歸分析的方法得到了反映基體強度特徵的k值,並從理論上探討了水泥含量、彈性模量和表面能的修正對強度計算產生的影響,檢驗模型的正確性;第六章是結論與展望,根據研究綜述了本文對孔結構的一些研究結論並對孔結構發展作了相應的展望。
  6. The full hydraulic logic servo control system of concrete pump

    泵全液邏輯伺服控系統
  7. Inorganic anti - cracking reinforced chemical additive, called wj, generates some tittle expansive crystals in hydration process in concrete to reduce the porosity and improve the distribution of pore size. the expansive power is process in common to tumefaction that petty crystalloid aft suck water and pressure to concrete pores that aft crystal gather volume. its adding weight was 8 % - - 12 % in cement, its restrained expansive ratio was about 0. 02 % - - 0. 06 %, and relevantil brought self - stress 0. 2mpa ?. 6mpa

    無機增強抗裂材料wj摻入普通中,在水化硬化過程中生成一定量的微膨脹結晶體,降低空隙率,改善中孔結構分佈。其膨脹驅動力是膠尺寸的晶體鈣礬石吸水腫脹和結晶狀鈣礬石對孔隙產生膨脹的共同作用。當wj摻量為8一12兒在鋼筋和鄰位的限下,使產生0
  8. Methods of test for production control of concrete - method of rapid test for compressive strength of concrete by warm water curing

    生產控試驗方法.熱水養護法測定縮強度的快速試驗方法
  9. The paper introduces the construction technique and quality control of the concrete ground container, the project uses the small machine - constructing method which vibrates beam and the vibrating spear unify, through example of key working procedure : the construction survey, the ground basic roller compaction, two ash zone constructions, the steel bar construction, the template construction, the concrete surface layer construction craft and the quality control, the small machine construction method prove to meet the project needs

    摘要介紹了集裝箱堆場施工工藝與質量控,工程採用振動梁和振動棒相結合的小型機械法施工,通過對關鍵工序如:施工測量、場區基層碾、二灰層施工、鋼筋施工、模板施工、面層的施工工藝與質量控,表明小型機械法施工能滿足工程需要,工程完成後符合驗收標準,滿足了業主的使用要求,對于同類工程的施工具有借鑒意義。
  10. By using 5000kn pressure - bent testing machine, the specimens of boulder concrete and crushed stone concrete were tested through three - point - bending method and wedge - split tensile method, the scale division of the index dial of pressure - bent testing machine is larger, whereas the predicted test - load is lesser, so the velocity of exerted load is controlled through observing the reading of the multimeter which is connected with the collecting systerm in order to continuously exert test - load

    本文使用5000kn彎實驗機,對不同強度等級的卵石和碎石試件分別進行了三點彎曲試驗和楔入劈拉試驗。試驗過程中,由於實驗機噸位較大,而試驗荷載預計較小,為了能夠有效地控加載大小和加載速度,採用通過觀察與荷載傳感器相連的萬用表讀數控加載速度的方法,連續加載。
  11. This paper sets up a fuzzy optimum math - model of the prestressed degree for prestressing bundle disposition of prestressed concrete continuous beam bridges, which is transformed into a clear math program by - level cut - set. by the solution of the clear math program, a succession of reasonable prestressing moments can be obtained. then it is convenient to dispose the prestressing system by only taking account of geometric factors of all controlling sections. based on this, a theory of automatic disposition of the prestressing bundles is proposed and an engineering example is given to demonstrate it

    建立預應力連續梁橋預應力度的模糊優化問題,按-水平截集解法,將模糊優化問題轉化為確定性的數學規劃問題.求得一較合理的消彎矩后,只需按控截面的構造進行預應力體系設計.在此基礎上提出了配束自動化的基本思想,並以一實例說明其理論應用
  12. Abstract : this paper sets up a fuzzy optimum math - model of the prestressed degree for prestressing bundle disposition of prestressed concrete continuous beam bridges, which is transformed into a clear math program by - level cut - set. by the solution of the clear math program, a succession of reasonable prestressing moments can be obtained. then it is convenient to dispose the prestressing system by only taking account of geometric factors of all controlling sections. based on this, a theory of automatic disposition of the prestressing bundles is proposed and an engineering example is given to demonstrate it

    文摘:建立預應力連續梁橋預應力度的模糊優化問題,按-水平截集解法,將模糊優化問題轉化為確定性的數學規劃問題.求得一較合理的消彎矩后,只需按控截面的構造進行預應力體系設計.在此基礎上提出了配束自動化的基本思想,並以一實例說明其理論應用
  13. 1 the spacing of 2 - column is 910mm. it can suppress concrete curb bricks and slope bricks of 750 x 500 x 150mm

    1二工位立柱間距910mm ,可750500150mm的路緣磚護坡磚等
  14. 2 the spacing of 4 - column is 780 780mm. it can suppress concrete curb bricks and slope bricks of 600 x 600 x 150mm

    2四工位立柱間距780780mm ,可600600150mm的路緣磚護坡磚等。
  15. Based on the fem program on fracture of plane structure developed by professor fu xiaoling of ho hai university, a two demension damage and fracture finite program package which is programed in fortran 90 language is developed. the paper adopts the plane - eight - nodes isoparameters element and compute the developing law of the damage and macro - damage of plane structure under load. considering the original damage and tension and compression damage at the same time, the paper adopts the more reasonable concrete constitute relation of two demension and exponent function model

    在河海大學符曉陵副教授所編的平面結構斷裂有限元程序( dl08p4 )基礎之上,本文用fortran90語言編的二維損傷-斷裂有限元程序包,程序採用平面八結點等參數單元分析計算平面結構在外荷載作用下損傷及宏觀裂縫的發展規律,考慮了結構體內存在著初始損傷和同時存在的拉、損傷,並且採用更為合理的具有損傷含義的二維本構關系(即正交異性損傷模型中的本構方程)和指數函數模型建立的並可進行拉、損傷可比性換算的損傷演變方程,較為真實地反映了實際情況。
  16. It restricts the development and application of this technology that a concrete column is strengthened with cfrp. so it is very necessary that the bearing performance of eccentrically loaded column wrapped cfrp is researched

    其限了cfrp加固柱技術的推廣和應用,有必要對cfrp加固柱的受力性能進行研究。
  17. Based on the description on the construction technology of the continuous flight auger ( cfa ) pile, the quality advantage, material requirement, construction condition of the pile is introduced, and then the causation of the quality defect and its control measure are presented herein ; from which the processes of both the construction and the quality control are analyzed as well

    摘要基於對長螺旋鉆孔注樁施工工藝的論述,介紹了該類型樁的質量優點、材料要求、作業條件以及常見質量缺陷的原因及控措施,對其施工及質量控過程進行了分析。
  18. With the retrospection of the developing course of the bored pile foundation and combining with my practical experience, the paper expatiates upon the design principle of percent of fit of the stone - fill grouted concrete and the main factors of the influence strength target, and the final pile technique introduction of the hollow pile of the stone - fill grouted concrete and the precast prestressed concrete ; baesd on the theory of slurry hydraulics, empirical calculation formulas of the radis and height of diffuse slurry are deduced in this paper ; it analyzes the test pile materials of the hollow pile foundation, such as luoyang yi river bridge and dangwang jian river bridge ; the new technique of the hollow pile, which provides the generalization and application with base materials, expounds its feasibilities, adaptabilities and economy

    本文通過綜合分析國內外鉆孔樁基礎的發展歷程及研究現狀,重點討論了填石漿空心樁、預預應力空心樁的成樁工藝、填石漿的配合比設計原理及影響強度指標的主要因素;根據泥漿水力學原理,導得了考慮各種因素的水泥漿液在預填骨料中的流動影響半徑和上升高度;結合河南省洛陽伊河大橋、黨灣澗河大橋工程實踐,討論了填石漿空心樁基礎的質量檢測方法及標準;並在此基礎上,深入分析了樁側、樁端承載能力,提出了填石漿空心樁的設計計算理論和方法。最後,論證了空心樁新工藝的可行性、適應性、經濟性,為大力推廣應用空心樁新技術提供了可靠的技術資料。
  19. The cement - soil mixing pile with concrete core is a new soil improvement method, it means that, a concrete core is plugged into cement - soil mixing pile. concrete core pile and the cement - soil mixing pile undertake together vertical load. it appropriately combines the advantages of the precast concrete pile with the cement - soil mixing pile

    水泥組合樁是在水泥攪拌樁成樁之後,水泥之前,用樁機械將預芯樁入水泥體內,待水泥固后,芯樁與水泥共同工作,承受上部荷載的一種新樁型。
  20. 9 pieces of rc test beams were fabricated, the fbg sensors and strain gauges were mounted in the tensile steel, compress concrete and cfrp of the tested beams

    備9根rc試驗梁,將fbg傳感器與電阻應變片同時預置於實驗梁內(受拉鋼筋、及碳纖維復合材料中) 。
分享友人