壓制漿板 的英文怎麼說

中文拼音 [zhìjiāngbǎn]
壓制漿板 英文
pulmoulding
  • : 壓構詞成分。
  • : Ⅰ動詞1 (製造) make; manufacture 2 (擬訂; 規定) draw up; establish 3 (用強力約束; 限定; 管束...
  • 漿 : 漿同「糨」
  • : Ⅰ名詞1 (片狀硬物體) board; plank; plate 2 (專指店鋪的門板) shutter 3 [音樂] (打拍子的樂器) ...
  1. A thin, firm board made of sheets of paper pasted together or pressed paper pulp

    由幾層紙糊在一起或由的紙漿做成的薄而牢固的
  2. Fabrication of the box beam is divided into such parts as reinforcement, formwork, concreting, prestressing, moving and storing of beam, pipe grouting under pressure, end sealing of the beam, water - proof layer on the bridge surface system, protective coating etc. the paper makes description of effective box beam construction technology and workmanship which can be adopted in other projects, such technologies as : manufacturing and fixing of reinforcement, steel reinforcement fixing baseplate, web plate and top plate respectively and lifting the steel skeleton into form, requirements of design and manufacturing and way of utilization for dismantling - erection type formwork and hydraulic formwork, optimization of concrete ratio, concrete pouring process of two ends of beam in priority over the middle, in sequence of first baseplate followed by web plate and top plate at last, concrete pouring in inclined section and in horizontal layer, concrete vibration mainly by external vibrator in assistance with internal vibrator, methods and regulation for steam curing of concrete, dual controls over stress and strain to ensure quality of prestressing workmanship, construction method of effective beam moving by heavy - weight special moving facility, some regulations and key notes about construction of grouting under pressure, beam ends sealing, water - proof layer on the bridge surface system, protective coating

    箱梁製造由鋼筋工程、模工程、混凝土工程、預應力工程、移存梁工程、孔道漿工程、梁體封端工程、橋面防水層和保護層工程等施工環節組成。文中介紹的採用胎具製作和綁扎鋼筋,分底腹和頂分別綁扎並吊裝鋼筋骨架入模;拆裝式和液式兩種模的設計、製作要求和使用方法;綜合考慮、優化混凝土配合比,混凝土灌注從兩端至中間、先底、后腹、再頂的施工順序和斜向分段、腹水平分層、附著式振搗為主、插入式搗固為輔的施工工藝,蒸汽養護的方法和規定;應力應變雙控確保預應力施工質量的施工技術;採用重物移運器有效移梁的施工方法;漿、封端、橋面防水層和保護層施工的一些規定和注意事項等都是對箱梁製造行之有效的施工技術和施工方法,並可為以後類似施工作借鑒。
  3. About effect of plasma flow guiding, the 90 - inclined cnts was successfully modified to 45 - inclined cnts by positioning a negatively - biased metal plate above the si substrate surface to vary the plasma flow pattern

    關于電漿導流之效應,藉由通在基材上放置具有負偏之導流可以控漿之流向,使原本與基材夾90 ?角成長之碳奈米管可藉此令其與基材夾45 ?角成長。
  4. Key issues including water plugging types, waterproof board spreading methods, drop of external water pressure and lining design for resisting hydraulic pressure, etc. were studied, thus the composite waterproof and drainage system to control drainage were put forward, including grouting sphere for water plugging, primary support, grid sysytem for waterproof and drainage and lining to resist hydraulic pressure

    重點就堵水方式、防水鋪掛形式、外水力的折減以及抗水襯砌設計等技術問題進行了研究,提出了可通過注漿堵水圈、初期支護、防排水網格和抗水襯砌形成綜合防排水體系,它可以達到控排放的目的。
  5. As soon as the tunnel boring machine advances 1m forward, 6 pieces of pre - cast concrete segment are fabricated and forming a ring with internal diameter of 5. 6m to support soil outside, while simultaneous back - filling and 32 - hole chemical grouting injector equipment installed with tunnel boring machine consolidating soil instantaneously to enhance the soil strength. the tunnel boring machine is also equipped with guided top gyroscope and true circularity retaining device for construction accuracy

    其中值得一提者,橋土城線所採用之潛盾機系新型之土平衡式機種,具同步背填灌漿之功能,對地表沉陷之控製成效優良,目前已貫通並通過民房及商業區下方之下行隧道其初期沉陷均控在5mm之內,二次沉陷及最終沉陷平均總量最大亦僅18mm ,遠優于初始設計的警戒值30mm 。
分享友人