壞穩定處理 的英文怎麼說

中文拼音 [huàiwěndìngchǔ]
壞穩定處理 英文
mechanical stabilisation
  • : Ⅰ形容詞1 (不好的; 惡劣的; 使人不滿意的) bad 2 (表示程度深 多用在表示心理狀態的動詞或形容詞後面...
  • : 形容詞1 (穩定; 穩當) steady; stable; firm 2 (穩重) steady; staid; sedate 3 (穩妥) sure; rel...
  • : Ⅰ形容詞1 (平靜; 穩定) calm; stable 2 (已經確定的; 不改變的) fixed; settled; established Ⅱ動詞...
  • : 處名詞1 (地方) place 2 (方面; 某一點) part; point 3 (機關或機關里一個部門) department; offi...
  • : Ⅰ名詞1 (物質組織的條紋) texture; grain (in wood skin etc ) 2 (道理;事理) reason; logic; tru...
  • 穩定 : 1 (使穩定) stabilize; steady 2 (穩固安定) stable; steady 3 (物質的性能不易改變的作用) stabi...
  1. Reliability assessment of xi - luo - du underground water - power plant : the results have been used by the cheng - du surveying, design and research institute for the preliminary design ; ( 2 ) the stress and strain analysis for the xiao - guan - zi sluice and its foundation : the report has been applied for the reinforcement of the foundation ; ( 3 ) the thermal control procedure for the no. 7 - 14 power plant dam segments of the three gorge project : the research report provides the effective and efficient methods for the controlling of the temperature field in the mass concrete structure ; ( 4 ) the software system development for the long - term monitoring for dikes : the software can automatically give the results of the seepage field and the probability of soil piping of dikes and underground ; ( 5 ) reliability assessment of xiang - jia - ba underground water - power plant : the results have been used by the zhong - nan surveying, design and research institute for the preliminary design ; ( 6 ) fatigue reliability estimation of shipping berthing pillar : the results give the optimized design scheme and prediction of the structural age ; ( 7 ) 3 - d static and dynamic stochastic finite element analysis for the strength, stability and thermal control problem for xi - luo - du project

    溪洛渡水電站超大型地下洞室群圍巖的安全可靠性分析:被成都勘測設計研究院應用於比選報告及可行性論證中; ( 2 )小關子水電站攔河閘壩及地基的應力應變分析:被成都勘測設計研究院應用於地基加固方案; ( 3 )三峽廠房7 # - 14 #壩段溫控並縫措施研究:為廠房壩段並縫方案的可行性提供了依據; ( 4 )堤防工程體系的長期監控預報預警決策系統開發:為監控、預測預報堤防滲漏管涌破提供分析軟體; ( 5 )向家壩地下洞室群圍巖的安全可靠性分析:被中南勘測設計研究院應用於初步設計方案中; ( 6 )靠船墩的疲勞可靠度研究:為廣東航運規劃設計院的靠船墩優化設計和加固提供依據; ( 7 )溪洛渡高拱壩壩體壩基(壩肩)強度和的三維靜動力隨機有限元分析及可靠度計算:為溪洛渡重大工程壩體的靜動力安全性及溫控方案提供依據。
  2. The foundation engineering is typical in both excavation depth and scale, on the basis of in - situ investigation, the design optimistic of retaining wall was discussioned in this paper, the mian reseaches including : the using of fem optimazition methods of rods system ; the delvopment of programs for optimazition of imbedding depth of structure based on matlab and for whole design optimaziton of the retaining structures based on ansys, under the two controlling factors of the saft coefficient and the reliability probability about the whole damage of retaining atructure ; the analysis on the m index of soil, the depth of retaining structures imbedded in the rock and the overall optimistic design of retaining structures

    該基礎工程不論在開挖深度還是規模上都很具有代表性。作者在現場調研的基礎上,探討了基坑支護結構設計優化問題。主要研究內容可以歸納為:應用基於m法的彈性地基梁桿系有限元方法;在圍護結構整體性安全系數與可靠性破概率兩種控制因素下,編寫了嵌巖深度優化的matlab程序與圍護結構整體設計優化的ansys批程序;進行了地層抗力比例系數反算、地下連續墻嵌巖深度優化與地下連續墻結構體系整體設計優化。
  3. ( 6 ) conclusion was obtained by the analyzing the mechanics environment and the stability of the lanslide on the right bank after the dam built : the value of the rock mass stress increased and the tensile stress region obviously reduced, the direction of the principal stress was unchangeable the dam and the landslide were stable under the dangerous condition ( the reservoir and at the same time the earthquake was viii ), but when the water lever suddenly fell and did not think of other force, safe factor evidently reduced, the dam and the landslide will be destroyed under the most dangerous condition ( the water lever suddenly fell and at the same time the earthquake was vi ) ; the stability of the landslide will be destroyed by the horizontal thrust under the most dangerous condition or ; the physical and mechanical parameter will be reduced due to long period filter, the landslide will be destroyed too

    ( 6 )建壩工程荷載條件下河谷巖體力學環境分析及右岸古滑坡體的問題分析得出:建壩后河谷的巖體應力量值明顯增高,同時左岸的張應力區的范圍及量值明顯減小,主應力的方向依然與模型的底邊界垂直;大壩建成后逐漸蓄水階段以及同時考慮本區最強地震力的作用等各種不同的工況條件時,滑坡體及壩體總體上仍狀態;水位驟降時,在未考慮其他外力作用的情況時,滑體的安全系數將顯著降低。若考慮水位驟降及本區最大地震力的共同作用,壩體將在滑坡體下滑推力的作用下產生破;建壩后水平推力對右岸古滑坡體性的影響分析可以看出,在最危險的工況條件下,壩體及滑坡體也將于臨界狀態;在長期滲透變形的作用下,由於滑帶的物力學參數的降低而有可能導致壩體失
  4. If the u. s. carried out air strikes on iran, or worse still, if they sub - contracted this task to israel, it would definitely increase anti - western sentiment in the middle east and possibly destabilize the entire region

    如果美國對伊朗發動空襲或者採取更甚一籌的行動,如果他們把這一任務轉交給以色列來,那麼這必將使中東地區的反西方情緒高漲,並有可能破該地區的
  5. In order to avoid the ehv system disaster caused by reclosing on the permanent fault of transmission line, adaptive autoreclosure based on microprocessor - based protection arises at the historic moment, but is still in the stage of theory study

    為了避免超高壓輸電線路採用自動重合閘時重合於永久性故障所造成系統等重大系統災難,在微機保護的基礎上,自適應重合閘應運而生,但尚論探索階段。
  6. Researching on the technology if reverse order is to study strains if pits, structural systems if basement, environmental surwey and underpinnings. on account of emphasizing developing methods if checking strength if pick - ets, modemizing machenes of excavation and studying methods of underpinning is put forward and is a way if controlling the quality of pickets in sites, which leads an active effect ; synthetic application if rankintheory, spatial and time effect theory to excavation tl aanalyze the state of soil force and strain is brought forward and the time effect should be considered in the zone of clay, the formation and development of soil plasticity are analyzed and the most dangerous zone to decide how to excavate and where to begin is found ; analyzing the cause of picket settlement during reverse order and the differential settlement and discussing hlw to solute it. duringh the temporary survey and the environmental warship, bringing rorward the theory of environmental vibration and analyzing the state of soil force and probability of losing stabilization of soil under the effect of environmental vibration ; analyzing the state offeree in underground concrete wall by the method of mathematics and pointing out the place of the maximum force and deformation. based on systematic illustrating the reverse order, problems about application and development of reverse order and suggestions also are expressed

    鑒于國內外的研究把重點放在大力發展工程樁的實驗室承載力監測方法與設備、如何使土方開挖機械現代化及對周圍建築的臨測方法上,本文提出了現場利用聲波層析成像技術監測鋼砼樁內部質量的方法與程序,並得出了聲波層析成像技術是砼樁的動態質量檢測的有效手段,這對指導施有積極、現實意義;提出了綜合運用朗肯土壓力論、基坑空間和時間效應影響論來分析逆作法施工過程中基坑邊坡土體應力及應變的變化情況,指出粘土地區也應考慮時間效應,並且進一步分析了基坑邊坡土體的塑性區形成和發展,找出邊坡最不利的區域,以確地下室土體的挖掘的方式和順序,指出憑主觀臆斷與經驗來施工是不可取的;在分析、經較逆作法與大開挖順作法的地下室結構體系受力情況及施工順序的不同,提出了節點技術;分析了逆作法施工期間樁的沉降變化原因及由此而產生的差異,並探討了解決的方法;本文還提出了環境振動對土體邊坡產生影響的觀點,並分析了在環境振動影響下,土體的應力狀態及土休失概率,並且還運用彈性力學知識和數學分析的方法量地分析了地下混凝土墻受力狀態,指出了被監測墻體的最大應力、應變位置。
  7. As to the video signal, alarm signal, control signal, are all weak electricity signal, exceedingly easily be subjected to the jam, in case the power supply system does not steady, wave propag ation is greatly, the harmonic content of power source overtops, the veins wave factors are great unduly, and even power source equipment breakdown, outputting abnormal, will be about to affect the video signal image effect, and dependability cuts downs to the security and alarming system. we adopt fast fu lye ' s mutation rule - fft alternatives, by the way of carrying fft alternatives to the local junction circuit, regulated power supply, ups ' s power source, and switch power source, thereby diagnose every degree harmonious wave content of power souse, and abnormal coefficient, compared to the normal working situation. thereby diagnose out the working condition of the regulated power supply, ups ' s power source, and switch power source

    如果有供電系統不、波動大,電源的諧波含量過高,紋波系數過大,乃至電源設備損、輸出異常等情況出現,將會嚴重影響視頻信號的圖像效果,大大降低防盜系統的性和可靠性,我們採用快速傅利葉變換原,即fft變換,通過對市電、壓電源、 ups電源、開關電源等的電壓信號進行fft變換,從而得出信號中各次諧波的含量及信號畸變系數,並將其與正常工況下的參數進行對比,從而進一步診斷出壓電源、 ups電源、開關電源等設備的運行狀況;組成監控系統的設備長期于工作狀態,往往由於設備散熱條件不好、設備老化故障等原因導致設備表面溫度過高,從而影響設備的正常運行,降低設備的使用壽命。
  8. The system was provided with a fast pc - based data system with an easy - to - use user interface, and had many advantages such as convenient for operation, quickly, timely, non - destructiveness for multi - index measured in the same time, and offered a continuous operation

    該系統具有快速數據的計算機系統和友好的用戶操作界面,具有操作簡便、快速、及時、非破性、多指標同時測等優點,並且是能夠連續運行的、高性的煤質在線檢測分析儀器。
分享友人