壞臺架 的英文怎麼說

中文拼音 [huàitáijià]
壞臺架 英文
stands for machines
  • : Ⅰ形容詞1 (不好的; 惡劣的; 使人不滿意的) bad 2 (表示程度深 多用在表示心理狀態的動詞或形容詞後面...
  • : 臺名詞(指臺州) short for taizhou (in zhejiang province)
  • : Ⅰ名詞1 (用來放置東西或支撐物體等的東西; 架子) frame; rack; shelf; stand 2 (毆打; 爭吵) fight;...
  1. Based on extensive investigation of construction technique history of chinese ancient buildings, the structure method, structure developing history and seismic behavior of chinese ancient timber structure buildings are analyzed in several respects of the structural system and form. through a series of experiments on constituent parts of chinese ancient timber building structure, including the tests on the corbels and brackets called dougong subjected to low cyclic reversed loadings, the tests on the wooden frame using the tenon - mortise joints as connections of column and beam subjected to low cyclic reversed loadings, the tests on vibration isolation effect of friction and slippage between column footing and their socle base, and a series of shaking table tests on a chinese ancient timber structure palace building mode under artificial earthquake at serving conditions, destroyed conditions and reinforced conditions, many valuable results of structures such as moment - curvature hysteretic loops of dougong structure and tenon - mortise joints under low cyckc reversed loadings, the static function, the seismic performance, energy dissipation, vibration reduction, energy - loss mechanism, nechanicalmode and failure mode were studied. aplenty of valuable parameters of the structure system were obtained, such as the natural period of structure, vibration modes, damping ratio, factor of vibration isolation, oscillate amplitude of ineitial accebration, velocity and displacement, magnitude of slippage, and the mechanism of structure failure and collapse etc. based on these research, the complete analysis of ancient timber structure under earthquake were carried out in which including mechanism analysis method, calculating mode, strength analysis of members and joints, strengthening methods for serving damaged ancient timber structure buildings were also taken into account

    依照宋代《營造法式》建造了抬梁式殿堂木結構構件及結構模型,對中國古代木結構中的典型構造如:柱腳在礎石頂面平擱簡支、柱榫卯連接、柱高不越間之廣、側腳、生起、斗拱等的構造機理及結構功能進行了量化分析和實驗研究: (一)通過木柱石礎靜摩擦試驗,測定了柱腳與石礎古鏡面間的摩擦系數及摩擦力隨上部結構荷載變化的規律; (二)通過單柱承載力試驗,測定了古建築中木柱的受力變形特徵、破模式、及模型材料的變形模量、極限承載力、極限變形等參量; (三)通過柱低周反復荷載試驗,測定了柱的抗側移剛度、柱恢復力特性及滯回曲線、榫卯張角剛度及其變化規律、柱及榫卯的極限承載力和極限變形、及榫卯減振參數; (四)通過斗?低周反復荷載試驗和受壓試驗,測定了古建築木構件與木構件間摩擦系數,斗?抗側移剛度,斗?恢復力特性及滯回曲線,斗?抗壓極限承載力及受力變形規律; (五)通過抬梁式殿堂間模型振動試驗,測定了殿堂木構結構自振周期,地震反應振形、阻尼特性及阻尼比;按結構分層特點對柱腳、柱頭和斗?層上的屋蓋的地震反應採用多點同步測量,對柱根滑移、榫卯變形、斗?的變形、復位、耗能減振參數等進行了定量分析。
  2. Based on the shaking table test of 1 / 4 scale two - bay rc frame modes strengthened with and without cfrp ( carbon fiber - reinforced plastic ), damaged and destroyed model strengthened with cfrp, the vibration properties and seismic response and destroying position of rc frame model with cfrp are analyzed

    摘要通過對兩個縮尺比為1 / 4的兩層單跨鋼筋混凝土框結構模型的加固、未加固及其震后再加固的3次振動對比試驗,探討了其動力特性、地震反應和損傷破情況。
  3. In order to reveal load mechanism and failure mode of thick pile caps, by means of the test of 1 / 4 - scale models of thick pile caps with six piles and post - handling study of 3 - dimensional non - linear finite element adina, this paper points out the shortage, which is that the design of pile caps is carried out by flexural strength in chinese technical code for building pile foundations jgj94 - 94 and american reinforcement concrete building construction code aci318 - 02, promulgates that the failure mode of thick pile caps is punching failure and load transfer mechanism is the strut - and - tie, which is that zones of concrete with primarily unidirectional compressive stresses are modeled by compress struts, while tension ties are used to model longitudinal reinforcement over pile

    摘要為揭示厚承的傳力機理和破形式,通過對4個1 : 5比例的六樁厚承的模型試驗研究與三維非線性有限元adina的后處理研究,指出中國建築樁基技術規范jgj94 - 94與美國鋼筋砼房屋建築規范aci318 - 02規范中,承以彎曲強度進行配筋計算的設計方法之不足,揭示出厚承的破模式是沖切破,傳力機理是以帶有主要單向壓應力的砼區域作斜壓桿,樁頂區域的縱筋作拉桿的空間桁
  4. On the basis of analyzing the rock mechanics, the bit working circumstance and property in the bottom hole of 6000m deep well, and making use of the former equipment such as a derrick, platforms etc, the paper demonstrates that the research and design of the mechanical device have been established including the high pressure simulating well bore, the high pressure connector between the static well bore and the rotating drill pipe, the high pressure simulating system of circulating fluid and the high pressure desander etc. the produce, control and dynamic analysis of the bottom hole four - dimensional pressure ( over burden, confined, pore and column pressure ) have been studied

    本文在對井底巖石的受力狀態以及鉆頭的工作環境和特性加以分析的基礎上,藉助原有的井、平等設備,研究設計了模擬6000米井底壓力境的高壓模擬井筒、鉆柱高壓轉聯器、鉆井液高壓模擬系統以及高壓除砂器等機械裝置,並研究了井底四維模擬壓力(上覆壓、圍壓、孔隙壓和液柱壓)的產生、控制及其控制的建模與模擬,從而實現井深至6000米的四維井底壓力環境的模擬。
  5. Hands free control under assistance of 301a working stand holds any sizes of mainboard easily

    配合301a工作,輕易夾持不同尺寸的主板,免持手柄及主板,避免損組件及主板之可能。
分享友人