壩坡 的英文怎麼說

中文拼音 []
壩坡 英文
dam slope
  • : 名詞1 (攔水建築物) dam2 (固堤建築物) dyke; embankment 3 [方言] (沙灘; 沙洲) sandbar; sandba...
  • : Ⅰ名詞(地面傾斜的地方) slope Ⅱ形容詞(傾斜) sloping; slanting
  1. The study includes the hole color tv imagery system for drill hole, even - pole bore - hole acoustic system and acoustic meter, bore - hole multi - point consolidation apparatus, the quick camera computer - aid image for high rocky slope, image technology for layer analysis, safety monitoring technology for the section close to the dam, software for processing and forecasting the slope monitoring data, high precision geodesy monitoring automation system, etc. all the study results are new, advanced and practical, which has applied in the project and gained the obvious benefits

    鉆孔彩色電視孔壁成像系統、直接橫波測井研究偶極子井下聲系和聲波儀、鉆孔多點滲壓儀及壓模系統、巖質高邊快速攝像微機地質素描成圖、層析成像技術、近庫段安全監測技術、邊監測數據處理預報軟體研究、高精度大地測量監測自動化系統等項目,研究成果內容新、先進、實用,已在工程中應用,效益顯著。
  2. To use the athwart gradient protection which takes the end of dam as the datum mark will reduce the digging depth of the stilling basins is reducing, and increase the energy dissipation rate

    採用以體末端為基準面的體逆防護時,消力池挖深減小,消能率提高,面平均流速減小,區防護難度降低。
  3. Utilizing pseudo - static method theory, calculated the safety factor for the dam slope, give, a primary conclusion. utilizing static finite element method based on duncan - chang hyperhola modelfound the static stress riele, make the foundation for hynamical finite element analysis. utilizing dynamical finite element method based on equipollence linearity model, found the dynamical stress field and the acceleration field, make the foundation for calculated the safety factor of the dam slop with finite element method

    運用擬靜力法的基本原理,對滿拉堆石壩坡穩定進行了分析研究,得出了初步結論;採用duncan - chang雙曲線模型,用計算土石應力及變形的靜力有限元程序,對滿拉堆石進行了靜力有限元分析,得到了體的靜應力場分佈,為動力有限元計算打下基礎。
  4. The information refers to slopes in opencast mines, quarries, dam foundation excavations and highway outs.

    這份資料提供了有關露天礦、採石場,基和公路塹的邊資料。
  5. From sedimentology symbol such as rock assembled, sediment gradus, sandstone grading analysis, protogene sedimentary structure, ichnofossile and logging facies etc and palaeoenvironment background, it is confirmed that shen84 - an12block s34 segment is braid river delta system, not fan delta system ( abrupt slope ). then it can be more partition as braid river delta plain sedimentary assembled, delta front sedimentary assembled and prodelta sedimentary assembled on core and log assembled. and delta plain sedimentary assembled can be identified four microfacies : braided distributary channel, crevasse splay, overbank deposits and interdistributary bay

    沉積微相研究是儲層非均質性研究的基礎,研究區有豐富的巖芯資料和測井資料,通過巖石組合、沉積韻律,砂巖粒度分析、沉積構造、古生物遺跡和測井相等沉積學標志,結合古環境背景,確定沈84 ?安12塊s _ 3 ~ 4段為辮狀河三角洲體系,而不是前人所認為的扇三角洲(陡型)體系,在巖芯和測井組合上可進一步劃分為辮狀河三角洲平原沉積組合、三角洲前緣沉積組合和前三角洲沉積組合,其中三角洲平原沉積組合又可識別出辮狀分流河道、決口扇、分流河道邊部和分流間灣四種微相類型;三角洲前緣沉積組合識別出水下分流河道、水下分流河道邊部和分流河口三種微相。
  6. There are some disadvantages on traditional construction method of the transition material 2b on upstream face of concrete face rockfill dam, i. e. overtopping, slope - cutting and incline compaction

    混凝土面板堆石上游面傳統的墊層料超填、削、斜碾壓的施工方法存在許多弊端。
  7. But at the present, because of chronic geomorphy disintegration, altitude and ascent of bank slope have been built down and palliated. especial rock mass mechanics condition has not been existent, so all kinds of rock mass fracturing deformation was stopped to developing and steady

    但目前因長期的地貌剝蝕作用,肩岸的高度及度均已大為降低減緩,特殊的巖體力學條件已不復存在,巖體內部的各類張裂變形亦停止發展,處于破裂發展穩定階段。
  8. Our “ sun shine ” brand carbon steel fiber have been widely used in road, protection slops of highway, bridges, reservoir dyke, tunnels, airport taxiways, well lids of city project ( guard against theft ), mine laneway, port, railway sleepers and etc, and gain high praise from clients

    本公司「雙興」牌碳鋼纖維廣泛應用於道路,公路護、橋梁、防浪堤、水庫堤、隧道、機場跑道、市政工程井蓋(防盜) 、礦井巷道、港口、鐵路軌道等方面,深受廣大用戶贊譽。
  9. 3 analyzing particle size of the wind - blown sediment and surface soil indicate that the former in 0. 02mm - 0. 2mm occupy about 40 % and 55 % of sloping field and shoaly land of bashang, which shows that bashang is the erosion and desertification region or the latency. 4 the search of decreasing effect of wood strap indicates that in lower wind speed the effect is distinct

    3風蝕物及表層土壤顆粒粒徑分析表明,地表200cm高度內風蝕物粒徑在0 . 02mm 0 . 2mm之間;上地區梁地與灘地該粒徑范圍顆粒分別佔40和55左右,說明上地區是風蝕沙化或潛在風蝕沙化地區。
  10. The evaluation indicates that the collapse of the soil bank slope, falling of sliding masses into the river and surge waves in the xiangjiaba and xiluodu reservoir areas will not affect the normal operation and long - term effectiveness of the reservoirs

    評價結果表明,向家庫區和溪洛渡庫區土質岸坍塌及崩滑體入江和涌浪不會影響水庫的正常運行及長期效益。
  11. The author presume the original physiognomy of jiuzhai valley, and acknowledged changhai valley was a surface - water with uniform waterpower, the rize valley was a branch of it but the inequality rise of lithosphere, the deposit of earthquake landslides debris flows and falling or glacier blocked the river - way, furthermore, the flow water with high content of ca ( hco3 ) 2, so tufa dyke formed and evolvement the present dyke of lakes the present physiognomy formed on the base of those 2

    由於地震、滑、泥石流引起的堆積物和冰川作用形成的冰磧物堵塞河道,再加上構造運動造成地殼的不均勻抬升,九寨溝的這種獨特的地質環境以及高含ca ( hco _ 3 ) _ 2的巖溶水流作用下,為caco _ 3沉積創造條件,沉積的caco _ 3加高、連接最終形成灰華堤,使湖泊的形成成為可能。
  12. Taken the bank spillway at yubeishan reservoir as an example, the water loads acted on the spillway, such as static water pressure, dynamic water pressure, shear stress on the surface of the step and so on, are calculated, which can provide evidence to the stability analysis of the dam slope and slope protection

    並以萬縣魚背山水庫岸邊溢洪道為例,計算了溢洪道上所受的水流荷載及其分佈,為土石壩坡和護面的穩定分析提供了依據。通過計算證實了既使在較大的單寬流量下,緩上的階梯仍有較高的消能率。
  13. The result shows soil masses in surface layer reach saturation more easily under great rainfall intensity and long - lasting rainfall, at the same time, there are big infiltration depth and influence of wetting deformation

    結果顯示,降雨強度越大、降雨持續時間越長,非飽和區土體含水率變化也大,壩坡表層土體較容易達到飽和,並且降雨影響深度也大,對壩坡表面濕化裂隙的產生及壩坡穩定性影響大。
  14. Stability analysis indicates that the safety factor of the dam is suitable and sufficient for a seismic design

    穩定計算的結果也表明,壩坡的安全系數是足夠的,滿足抗震要求。
  15. In the light of the study result that the energy dissipation ratio is higher as the spillway slope is gentle, to applied stepped spillway to overflow earth - rock dams with a certain height is proposed

    根據壩坡較緩時,階梯的消能率較高的研究成果,提出把階梯溢流應用於一定高度過水土石
  16. Top soil masses of dam slope soak and produce wetting more easily than low soil of slope in spite of rainfall intensity

    不管降雨強度如何,頂和壩坡中上部比體的中下部更容易受降雨浸濕。
  17. ( 2 ) carry out a comprehensive research on their technological characteristics and suitabi 1 ity in dealing wi th the xiacouba reservoir project, the details are as follows : cd in connection with grievous seepage problem and slope stability problem of the foundation overburden and the dam itself, there are two positive plans for dealing the seepage and three for upstream slope stabi 1 ity

    具體內容如下:針對下口水庫體、基覆蓋層滲漏嚴重,上游壩坡穩定性差,多次滑特點,大防滲處理擬定了二種處理方案,上游壩坡加固擬定了三種處理方案,從技術可靠、工期短、造價省、施工條件等方面進行評價。
  18. Application of plastics membrance at the dam slope to antifreezing heaving damages

    塑料薄膜在壩坡防凍脹破壞中的應用
  19. The technique of splitting grouting is a method for handling the earth dam " s stability with deformation and permeation. it is developed quickly in several decades. the author, regarding left subsidiary dam of shenzhen reservoir as an example, uses the limited element method to proceed the dam ' s seepage calculation, combines the contrast analysis with prototype data and predicted data, then compares the dam ' s seepage behavior " s changes before splitting grouting with that after splitting grouting, has some basic conclusions

    體劈裂灌漿技術是近幾十年來發展迅速的一種處理土體變形穩定和滲透穩定問題的方法,本文以深圳水庫左副為具體實例,利用有限單元法進行了體滲流計算,並與原型觀測資料進行對比分析,然後比較了劈裂灌漿前後體滲流狀況的改變,並對壩坡穩定進行分析,得出了一些基本結論,對利用有限單元法求解劈裂灌漿前後體的滲流問題提出了一些建議。
  20. The effects of the stratification of rockfill on the seepage field and the stability of the dam slope were highlighted

    指出填料嚴重分層后對體滲流場的影響以及對壩坡滲透穩定性的不利影響。
分享友人