壩寬 的英文怎麼說

中文拼音 [kuān]
壩寬 英文
dam width
  • : 名詞1 (攔水建築物) dam2 (固堤建築物) dyke; embankment 3 [方言] (沙灘; 沙洲) sandbar; sandba...
  1. The studies may indicate that an earthfill dam with a center concrete gravity overflow spillway section is the most economical, in a wide flat valley.

    方案表明,在闊而平坦的河谷內,一種在中間段設置混凝土重試溢洪道的土是最經濟的。
  2. Taken the bank spillway at yubeishan reservoir as an example, the water loads acted on the spillway, such as static water pressure, dynamic water pressure, shear stress on the surface of the step and so on, are calculated, which can provide evidence to the stability analysis of the dam slope and slope protection

    並以萬縣魚背山水庫岸邊溢洪道為例,計算了溢洪道上所受的水流荷載及其分佈,為土石坡和護面的穩定分析提供了依據。通過計算證實了既使在較大的單流量下,緩坡上的階梯仍有較高的消能率。
  3. A brief introduction is given to the treatment of the zeya dam foundation, principles of seepage control and design of the concrete face rockfill dam of the zeya reservoir. as for the excavation of the sand - gravel zones, except the toe slab and its 1 / 9 bottom width down stream, the alluvial layers are excavated to the micro - weathered rocks, while the other sections remain unexcavated. regarding to the treatment of the fracture zones, concrete filling is used for the toe slabs and semi - permeable materials are used for other section. according to the construction characteristics, a filter is placed in the down stream embankment foot. to improve the integrity of the dam foundation and anti - seepage capability consolidation grouting and curtain grouting are adopted. as a result safety, economic benefit, convenience in construction and good performace are achieved

    簡要論述澤雅水庫面板堆石基處理和防滲的原則及設計要點.趾板基礎和堆石體各區砂礫石基礎開挖,除趾板與其下游1 / 9底范圍以及腳挖除沖積層至弱風化(局部微風化)基巖外,其餘部分均予以保留.斷層破碎帶處理,趾板部位採用混凝土塞,其它部位採用半透水料置換,並根據本工程特點在下游腳加設了反濾層.為提高基的整體性和防滲性能,對趾板進行了固結和帷幕灌漿.達到了安全、經濟、便於施工的目的,運行情況良好,可為面板堆石的設計和研究提供參考與借鑒
  4. The dam of mania hydroelectric project is a soil - rock dam with spreading gradation soil of core wall. the height of the dam apices is 4261. 3m and the maximal height is 76

    滿拉水利樞紐工程攔河級配礫質土心墻土石頂高程4261 . 3m ,最大高76 . 3m 。
  5. 3m. as for lack of construction experience in using spreading gradation soil as the permeation proof body in our country at present, the author has studied the soil material carefully

    針對目前國內尚沒有級配礫質土作為高土石防滲體的實際施工經驗,對土料進行了較為詳細的試驗研究工作。
  6. The influence of the channel dredging and improvement on the dongping waterway in the pearl river delta

    北盤江油灘河段整治流量與整治線度的研究
  7. The result show that the position of free surface is higher because of frusta of brake, especial obvious in the head of frusta of brake ; flux coefficient and pressure on dam are quite influenced by type of frusta and 3 a type frusta of brake relative to 2 type frusta of brake has bigger flux coefficient and smaller pressure on dam ; obvious influence of ability of discharge flow for different ratio of thickness of frusta and breadth of brake and pressure on dam reduces with increasing ration of thickness of frusta and breadth of brake, while bigger flux coefficient is obtained when tlb = 0. 2

    結果表明,閘墩河海大學博士論文的存在抬高了水面線的位置,其中在閘墩頭部尤其明顯;墩型對流量系數和面壓力影響較大, 3a型閘墩相對於2型閘墩具有更大的流量系數和更小的面壓力:不同的墩厚閘比t / b對泄流能力也將產生顯著的影響,隨著墩厚閘比的增加,面壓力降低,而當t / b二0 . 2時溢流具有更大的流量系數。
  8. No. 15 fault of yunfeng dam is a low angle one. its space structure is very complex. had not been disposed thoroughly during the period of construction, it has become the control factor in yunfeng hydroelectric project

    雲峰縫重力右f _ ( 15 )斷層為一個順河向、緩傾角大斷層,空間結構非常復雜,是影響大安全運行的控制因素。
  9. Based on experimental result of energy dissipation and scour protection for downstream of spillway at yu jian kou power station, this paper discusses the flow characteristics, aerated characteristics of flaring gate pier for low dam pivot, the influence on pressure of dam surface and the result of energy dissipation for flaring gate pier. it is put forward to be an available method to solve the problems of energy dissipation and scour protection for depth of covering strata, poor geologic condition and weakness of resistance to scour capability under reasonable use of flaring gate piers and auxiliary dissipaters. thus, a new method is obtained for release of floodwater and energy dissipation of low dam pivot which are provided with low water head, great unit discharge and low froud coefficient. it may be used for reference for design and test workers

    結合魚劍口電站下消能防沖試驗研究成果,對低樞紐尾墩的水流特點、摻氣特性、尾墩對大泄流能力和面壓力的影響以及尾墩的消能效果等問題進行了初步探討,提出了合理地使用尾墩結合輔助消能設施可有效地解決下覆蓋層深,地質條件差,抗沖能力弱的低樞紐的消能防沖問題,從而為具有低水頭,大單流量,低佛氏數特點的低樞紐泄洪消能開辟了一條新途徑,可供有關低樞紐設計與試驗工作者借鑒與參考
  10. The relationships between the sensitivities of the optical fiber and crack widths at 300, 45, 60 were obtained

    得到了在大安全監控縫控制范圍內光纖與裂縫夾角為30 、 45和60的光纖靈敏性與裂縫度關系曲線。
  11. Article 26 no excavation of sand, dike and dam construction, dumping of rubbish, reduction or expansion of river - beds, or demolition operations may be carried out within 200m either upstream or downstream of large highway bridges and highway ferries

    第二十六條不得在大型公路橋梁和公路渡口的上、下游各二百米范圍內採挖沙石、修築堤、傾倒拉圾、壓縮或者擴河床、進行爆破作業。
  12. However the experience about design of high arch - darn is not enough in deep valley, especial when the dam is located in the areas of intensive earthquake. therefore the study of three dimension earthquake response is great significant in reality and history to the hydroelectric construction

    然而,由於缺乏在河谷高比大的高拱設計經驗,特別是在高地震烈度區修建高拱,因此,本項目的研究分析具有十分重要的現實意義。
  13. The result is basically agreed with the calculations and can verified the theory for the stability of earth - rock dams under flood discharge, in the second part of this paper, several kinds of slope - protection materials are studied. according to the material property, a type of new flexible slope - protection material applied to overflow earth - rock dams - rubber panel armoring - is presented

    為了研究高土石在大單流量下的穩定性,本文第二部分主要對幾種不同的土石護面材料進行了探討,根據材料的特性和各自的受力特點,提出選用一種新型的柔性護面材料?橡膠板作為土石的防護材料。
  14. For different upstream conditions, thickness of sediment in the permeable pile dike region may reach 0. 67 m, and largest thickness is nearly 1. 9 m, and largest width reaches 1 km

    不同入流條件下的主過流區段的灘面淤積體厚度可達到0 . 67m以上,最大厚度可接近1 . 9m ,淤積體最大度可達1km 。
  15. The dam was 2, 352 ft. long, 178 ft. high and spanned the whole of the shek pik valley. the base was 1, 200 ft. wide, and the top was 28 ft., wide enough to accommodate traffic

    水塘的主橫越石壁谷,長2 , 355尺,高178尺,1 , 200尺,28尺,可供汽車行駛。
  16. ? rack occurs during the construction period of slrcp in lijiaxian hydropower station, which generate the study of slrcp construction period ; ? ccording to the survey of slrcp which runs for years, the crack width exceed the design width. so, the crack control is focused

    李家峽後背管在施工期就出現裂縫,由此引出鋼襯鋼筋混凝土壓力管道施工期性能研究問題;根據對運行多年的鋼襯鋼筋混凝土壓力管道實地勘察,發現管道的裂縫度均超過當初設計裂縫度,由此引出裂縫控制問題。
  17. In combination with the application of lightweight aggregate concrete in construction of xinba lock hoist room, this paper discusses the technical features of lightweight aggregate and lightweight aggregate concrete, to promote the development of application technique of lightweight aggregate concrete, and broaden its application scope as well

    摘要結合新船閘啟閉機房結構物工程中輕骨料混凝土應用,探討輕骨料及輕骨料混凝土的技術性質,以提高輕骨料砼的應用技術,拓輕骨料砼的應用范圍。
  18. Numerical simulation of energy dissipator with new style flaring gate pier and stepped spillway

    新型尾墩和階梯式溢流面一體化消能工數值模擬
  19. Test results show that spur dikes aligned along a single bank in the deep water zone have more effects on the adjustment of the bed topography of the wide - shallow river than in the shallow water zone ; alignment of spur dikes along both banks can effectively adjust the planimetric position of deep - water zone ; and a reasonable widening rate of the regulation line in the estuary can readjust the variation of the average water depth along the river

    試驗結果表明,在深水區的單側丁群對淺河床地形的調整作用大於淺水區;雙側丁群的聯合作用能調整深水區的平面位置;合理地選擇治導線的放率,能有效地調整深槽平均水深的沿程變化。
  20. The experimental data was used to relate the size of the horizontal circulation regions and the sedimentation volume to the " sucking - spouting " discharge

    試驗時,用50cm ,深60cm ,長13m的水槽模擬流道,設一丁作為突出山體的模型。
分享友人