壩高 的英文怎麼說

中文拼音 [gāo]
壩高 英文
dam height
  • : 名詞1 (攔水建築物) dam2 (固堤建築物) dyke; embankment 3 [方言] (沙灘; 沙洲) sandbar; sandba...
  • : Ⅰ形容詞1 (從下向上距離大; 離地面遠) tall; high 2 (在一般標準或平均程度之上; 等級在上的) above...
  1. Journal of aba teachers college

    師范等專科學校學報
  2. The dam is 50 metres in height.

    壩高五十米。
  3. The research fruits in this article can provide the temperature isoline map of crown cantilever section and central longitudinal section of the dam, the stress isoline map of crown cantilever section and upstream and downstream surfaces of the dam, the maximal and minimal stress distribution map in dam abutment along with the height of dam, the maximal and minimal stress table of typical nodes and the maximal and minimal stress table in different elevations, and also provide reference basis for taking relative temperature control measures in the design and construction of rcc arch dam

    本文研究成果可給出體的拱冠梁剖面和體中心縱剖面的溫度等值線圖、拱冠梁剖面和體上下游面應力等值線圖、肩最大最小應力沿壩高的分佈曲線、不同程處典型點的最大最小應力值表以及不同程處最大最小應力值表等成果,為碾壓混凝土拱的設計和施工中採取相應的溫控措施提供了參考依據。
  4. Xiaowan hydropower station, with its 292m high arc dam, is the largest one under construction in the lancang river

    瀾滄江小灣水電站壩高292m ,是目前在建的最的拱
  5. Nuozadu hydraulic - power station will be built in lantsang river in yunnan province, has a oversize hydraulic power project, its highest height of the design dam achieve 260 meter, and its installed capacity arrive 5, 600, 000 kilowatt

    雲南省瀾滄江糯扎渡水電站,最大擬建壩高260m ,裝機容量560萬千瓦,屬特大型水電工程。
  6. Because of the complexity of calculation result data, and in order to simplify the analysis of results, this paper only provides annual temperature isoline map of february, may, august and november during construction, temperature isoline map of the first, fifth, tenth, twentieth and thirtieth year during operation, duration curve of temperature and stress of typical point at different elevation, the maximal stress distribution along dam height, point at different elevation, the maximal stress distribution along dam height, and the maximal and minimal temperature and the maximal tensive stress and its position of every month

    因計算結果數據量非常大,為便於成果分析,本文僅給出施工期每年2 、 5 、 8 、 11月份和運行期第1 、 5 、 10 、 20 、 30年的溫度等值線圖,體不同程典型點溫度和應力歷時曲線圖,最大應力沿壩高分布圖,逐月最、最低溫度和最大拉應力值及相應的位置等。
  7. The dam of mania hydroelectric project is a soil - rock dam with spreading gradation soil of core wall. the height of the dam apices is 4261. 3m and the maximal height is 76

    滿拉水利樞紐工程攔河為寬級配礫質土心墻土石程4261 . 3m ,最大壩高76 . 3m 。
  8. Citing five - meter - high nanfei river rubber dam in hefei, one of the highest double - anchor water rubber dam in china as an example, while deeply analyzing some representative rubber dam projects in china, the article theoretically exploits the relationships among some technical parameters such as anti - pull intensity, internal pressure ratio, circum - oriented relative extending rate, etc. also has the author brought up his own opinion on rubber dam design & calculation theory, which is of high theoretical and applicative value for parameter optimization and combination of water rubber dam with a height of above 3. 5 meters. it also helps when building over - five - meter - high rubber dam using seamless rubber dam and rubber dam with steel wire as its frame. this article also exploits safety measures for designing & building rubber dam in navigation areas

    本文以充水式雙錨固橡膠目前國內最壩高5m )之一的合肥市南淝河橡膠工程為例,並在對全國目前已建橡膠代表工程進行深入分析的基礎上,對袋的抗拉強度、內壓比、環向相對伸長率等技術參數之間的關系進行了理論探討和研究,並對橡膠設計計算理論提出了自己的見解和看法,對指導設計壩高3 . 5m以上的充水式橡膠技術參數的優化組合具有重要的理論和應用價值,特別對應用無搭接縫橡膠、鋼絲網骨架橡膠建造壩高大於5m的橡膠具有指導意義。
  9. The construction techniques and mechanics are approaching or even reaching the international advanced level in the asphalt concrete impervious deck of the recent completed tianhuangping pumped - storage hydroplant and the counter dam in the yangtze river which is being built with the height of 104 m, the volume of asphalt concrete core of 5x104m3

    最近建成的天荒坪抽水蓄能電站上庫瀝青混凝土防滲面板和正在建設的壩高104m 、瀝青混凝土心墻方量達5萬多m ~ 3的長江三峽水利樞紐茅坪溪防護工程,施工工藝和施工機械化程度已達到或接近國際先進水平。
  10. During last century there were more than 200failures of dams greater than 15m high. they have caused huge economic property and life loss. many people suffered from the catastrophes of dam break

    據不完全統計,在二十世紀,壩高在15m以上的潰事件就有200多起,造成了巨大的經濟和生命損失。
  11. The design for the optimum height of warping dam

    淤地最優壩高設計
  12. Gaobazhou water conservancy project is the most downstream hydropower station in the 3 cascade development qingjiang mainstream, total installed capacity 252mw, total reservoir capacity 430 million - m3, maximum dam height 57m, length of dam axis 439. 5m, total static investment rmb 623. 48 million ( 1998 price )

    洲水利樞紐是清江流域三級水電站的最下游一級水電站,電站總裝機容量252mw ,總庫容4 . 3億m ~ 3 ,最大壩高57m ,軸線長439 . 5m ,靜態總投資( 1988年價格) 62348萬元。
  13. Abstract : for high arch dams in valleys with the characteristics of high water head, large discharge and large power, the problems of energy dissipation and scour prevention are serious. based on scientific studies, new comprehensive measures are proposed, including dispersion of discharge to waken wallop of the current, and reinforcement of riverbed to enhance the erosion - resistance. the measures can be used to solve the problem of energy dissipation properly. a typical layout scheme has been proposed in which slotted bucket with diversion teeth, double deck with pores, and cushion pool are considered practice has proved that the scheme is reliable and the effect of energy dissipation is obvious

    文摘:泄洪消能的特點是壩高落差大,流量大,功率大,位於河谷狹窄地區,泄洪消能與防沖問題突出.經科學研究,採用「分散泄洪,削弱水流沖擊力,加固河床,增強河道抗沖能力」的綜合治理措施,較好地解決泄洪消能布置問題.提出了表孔大差動坎加分流齒、雙層多孔、水流撞擊、下設水墊塘聯合消能的典型布置方案,經實踐證明,方案可靠,消能效果好
  14. Abstract : xiao wan hydroelectric installation locate in the boundary between nanjian county and fengqing county of the western of yunnan province. the height of dam is 292 m, and its installed capacity is 4, 200, 000 kilowatt, so it ' s a large - scale water - power engineering. the height of excavation reach to 80 m. so it is sure, that the excavation will influence on the stability of the slop. the stability of the slop is the necessary condition to assure the trouble - free operation of the station

    雲南省瀾滄江小灣水電站位於雲南省南澗縣和風慶縣的交界處,最大擬建壩高292m ,裝機容量420萬千瓦,屬特大型水電工程。左岸砂石系統邊坡位於瀾滄江左岸8 ~ #山樑,主體開挖度達80m ,開挖對邊坡的穩定性產生很大的影響。該邊坡的穩定性對水電工程建設的順利進行。
  15. Nuozadu hydro - electrical power station, which is 261. 5 m dam height and 5, 850 mw installed capacity, is planned to build on the middle - lower reaches of lancang river near shimao city, yunnan province. it is planned to adopt rockfill dam and underground powerhouses in the left bank. the underground cavities mainly include three large cavities

    瀾滄江糯扎渡水電站擬建壩高261 . 5m ,裝機容量5850mw ,採用左岸地下發電系統,由主廠房、主變室、尾水調壓室以及尾水洞等構成龐大而復雜的地下洞室群。
  16. We provide the bidding agent, project management consultation and project agent services for foreign investors or home enterprises inside or outside china. we have some excellent project managers who achieved many experiences in project management. they managed some big infrastructure projects, such as shenzhen meiguan highway, shenzhen jihe highway and shenzhen yanba highway. 5 persons passed the authentication of ipma level c, 10 persons obtained the first or second grade project manager certificate

    為外商和國內企業在中國境內外投資的基建項目進行招標代理服務項目管理咨詢服務和項目代管服務。我公司擁有一批在項目管理方面卓有建樹的精英,管理過許多大型的基建項目,如深圳梅觀速公路深圳機荷速公路深圳鹽壩高速公路的項目管理。
  17. 3. seismic survey of shenzhen yanba highway

    3 .深圳市鹽壩高速公路地震勘探
  18. The result indicates that under the condition of temperature sudden drop, the temperature of face slab ' s surface and centre will fall consecutively along with the temperature sudden drop, and the face slab ' s surface temperature drop - cut range will reach maximum ; under this condition, the tensile stress appears in the face slab ' s surface and centre, the maximum principal stress in the face slab ' s surface is larger titan that in the face slab ' s center ; the maximum principal stress in the face slab ' s surface and centre both occurs in the position that the elevation equals approximately to half of the dam ' s height

    結果表明,在氣溫驟降條件下,面板表面及中心的溫度將隨氣溫驟降的發生而持續降低,其中面板表面溫度降幅最大;此時面板表面和中心均出現拉應力,面板表面的最大主應力大於面板中心的最大主應力;面板表面和中心的最大主應力均發生在程約為壩高一半的位置。
  19. The dam was built with granite and concrete, 90 ft. high and 400 ft. long and was 60 ft. wide at its base

    用花崗石和混凝土建造,壩高90尺、寬400尺、基厚60尺。
  20. Baihetan hydroelectric power station of jinsha river is another planned giant project after three gorges and xiluodu water c onservancy p roject i n c hina

    金沙江白鶴灘水電站是我國繼三峽、溪洛渡之後開展前期工作的又一座巨型電站。最大壩高275m ,裝機容量12000mw 。
分享友人