套壓法 的英文怎麼說

中文拼音 [tào]
套壓法 英文
method of pressing pipe
  • : 名1 (套子) cover; case; sheath 2 (河流或山勢的彎曲處) a bend of a river or a curve in a mount...
  • : 壓構詞成分。
  • : Ⅰ名詞1 (由國家制定或認可的行為規則的總稱) law 2 (方法; 方式) way; method; mode; means 3 (標...
  1. Based on the close analysis of the influence factors of the vertical bearing capacity, circular aperture extension theory is employed to establish the computing formulas for the pile vertical stress and the foundation vertical bearing capacity, respectively. moreover, with analyzing the features of the calculation parameters such as materials of gunite mortar, jet pressure, diameter of the jet pipe, pile length, pile layout, a design theory for chemical churning pile composite foundation is proposed. then, the variation of the pipe deformation with loads, the deformation coordination of pile and soil are studied

    在此基礎上深入探討了旋噴樁的樁土受力特性及其復合地基的加固機理,從影響旋噴樁復合地基豎向承載力的因素入手,基於圓孔擴張理論給出了樁體豎向應力及旋噴樁復合地基的豎向承載力計算公式;通過對噴射漿液、噴射力選取、噴射直徑估算、樁長及樁位設計等各種計算參數的深入分析和研究,提出了一相應的旋噴樁復合地基設計計算方;通過計算分析,深入探討了旋噴樁復合地基變形隨荷載變化規律、樁和樁間土變形協調關系、樁土應力比及復合地基縮模量的確定,並提出相應的設計方和修正參數;此外,結合工程應用,對旋噴樁復合地基的施工技術及其現場質量檢測方進行了較全面的探討。
  2. The calculation method using in factory has larger error and is n ' t used in high ignition point oil transformer. in this paper a calculation method, which has been verified by experiment results, is presented based on the fundamental theories and rule equation of heat transfer to calculate the temperature rise of average oil, top oil, coil, core and hot - point. a program has been compiled

    本課題立足於工程實際應用,根據傳熱學基本原理和經典試驗換熱準則式,通過對變器發熱冷卻原理進行分析和研究,提出了一計算變器平均油溫升、頂油溫升、繞組溫升、鐵芯溫升和最熱點溫升的計算方並編制了計算軟體,對影響變器溫升的因素進行了分析。
  3. Some testing devices are of advanced ones, such as scanning electronic microscope, microfocus circular radioscope, water - immersed ultrasonic flaw detector, 3 - axis measuring machines, large - sized projector, etc. for the production of non - aero products, there are large - sized die - casting equipment, and nearly 100 pieces of specialized gear machine tools including worm - gear grinding machine, etc. it has some specialized production lines for piston, crankshaft, cylinder and housing, etc., as well as 4 flexible production lines advanced at home for motorcycle engine, and a complete set of automatic inspection test eqiuipment for motorcycle engine

    計算機輔助設計輔助加工技術正在普遍使用。在非航空產品生產方面有大型鑄設備殼型鑄造,包括鍋桿輪磨在內的輪專用機床100多臺,以及活塞曲軸汽缸殼體等專業化生產線。此外,還建成了具有國內領先水平的4條摩托車發動機柔性生產線,以及成的摩托車發動機檢測設備,可進行測試數據分析,改進檢定測試方等。
  4. Abstract : by using the principle of the reliability optimum design, combining general calcu lation method, the article analyzed the reliability opgimum calculation method of the over surplus quantity of the hydraulic pressure sheath screw propeller, and validated its correctness through example

    文摘:運用可靠性設計優化設計原理,結合常規計算方,分析了螺旋槳液合過盈量的可靠性優化計算方,並結合實例,驗證了其正確性
  5. Press tools - guide bushes - form f, ball cage bushes, flanged, type 1

    工具.導襯. 1型蘭滾珠保持架襯. f形
  6. Press tools - specification for guide bushes : form f, ball cage bushes, flanged, type 2

    床.第31部分:導規范: f型2類蘭式滾珠架導
  7. This paper presents the way to configurate the distribution transformer, and the setting method for the stator earth fault protection with the example of hubei tiantang pump - storage power plant

    針對配電變器裝置提供了一較完整的配置和整定計算方,並結合湖北天堂抽水蓄能電站的實例進行計算, ?此類接地方式提供了可借鑒的方
  8. Abstract : in this paper , the problems in collecting data of earth pressure are discussed on the basis of some real projects according to the author , the present way , in which earth pressure data are calculated completely from classics theory , is not practical a nonlinear method of row pile design , in which the cooperative action of ring beam are taken into account and the lateral pressure is calculated on the basis of the pressure of displacement earth are proposed

    文摘:本文從實例著手,分析了在土力取值上存在的問題,目前工程中完全按經典理論進行算是不確切的;提出了排樁設計中應定量考慮圈樑的協同作用,側力按位移土力進行計算的非線形方
  9. Firstly, a system was developed in functions to collect infrasound data, to transform analog voltage signal from detector into discrete signal by a / d card and to process the data by using methods of digital signal process

    首先設計一數據採集系統,次聲波信號通過傳感器被轉換成模擬電信號,通過a d板將其轉換為離散的數字序列,輸入計算機。利用數字信號處理的原理和方對異常次聲信號進行分析處理。
  10. A whole set of design scheme and construction program has been worked out and utilized in metro engineering in this thesis through the analysis and study on high pressure shot grouting method

    本文通過對高噴射注漿進行分析研究,制定出一整設計方案和施工方案,並將成果應用到地鐵工程中。
  11. Abstract : according to sidewall unstable problem during dr illing, the study on sidewall stability is developed. the paper analyses sidewall stress state and sidewall unstable type, and combines with log data and indoor e xperimental result of core. through analysis and calculation, the method of calcul ating slough formation pressure is proposed. by application of the method in 3 wells in yancheng area, result shows that slough pressure section fits in with field practical condition. it supplies some basis for design of drilling fluid d ensity

    文摘:針對鉆井中井壁失穩問題開展井壁穩定性研究,文中就井壁應力狀態和失穩類型進行分析計算,並結合測井資料和巖心的室內實驗結果進行分析,建立了一計算地層坍塌力的方,結合鹽城地區3口井應用對比,坍塌力剖面基本吻合現場實際,為鉆井液密度設計提供了一定的依據。
  12. The authors and their research team design a sat of bran - new hydro jacking test equipment and suited software on the basis of their hydro - fracture research

    摘要在水致裂地應力測試研究的基礎上,結合工程實際情況設計出一全新的水劈裂測試系統設備和相匹配的測試軟體。
  13. In the construction of the tanghe inverted siphon on mid - roule of south - to - north water transfer project, some reliable construction processes and techniques are applied such as belt conveyor with three - rail gantry, construction with combined steel formwork, straight screw sleeve connection for reinforcement and the crushed stone - planting method etc., by which better construction effects are obtained

    摘要南水北調中線唐河倒虹吸工程項目施工中,根據工程特點,採用了三軌門架式皮帶布料機、鋼模板聯體施工、鋼筋滾直螺紋筒連接、混凝土施工縫栽石等可靠的施工技術和施工工藝,取得了較好的效果。
  14. The stability of electric power system has been being focused for a long time toprevent a power system from losing synchronism after sudden fault , researchers have done much work and got many accomplishments this paper applied the direct feedback linearization ( dfl ) technique on the power system , a strong nonlinear system simulation results by matlab proved this method efficiency main works and results are as follows : this paper compared some existing methods in excitation control , fast valve control and coordinated control respectively, analyzed the developments and actuality of nonlinear control research in brief, illustrated why ransient stability could be greatly improved by using the fast valve control in chapter 3 , indicated the importance of coordinated control farther this paper introduced the inverse system theory, based on which , discussed the dfl theory, pointed out which had consistency with the inverse theory, expanded the dfl theory combined the idiographic model equations , made which adapt to the model of a single machine - infinite bus power system this paper referenced abundance articles and educed a set of equations , which could describe the dynamical process of excitation and fast valve control for synchronous generators in the equations , there were several very important parameters of power system - - rotor angle ( ) , rotor speed ( ) , generator q axis voltage ( eq ) , transient voltage ( e ' q ) , active power ( pe ) , mechanical input power ( pm ) , valve opening ( ) , generator terminal voltage ( vt ) , based on the model , nonlinear coordinated controller and terminal voltage optimal controller have been designed by using the expanded dfl theory and lq optimal control theory the simulation results showed that the controller could keep power system transiently stable under the effects of a symmetrical 3 - phase short circuit fault , which achieved better postfault regulation compared with another two routine methods , one is the proportion excitation controller and proportion fast valve controller, the other is the proportion excitation controller and the optimal fast valve controller, which could exert good performance when met 1ittle disturbance either

    在介紹逆系統理論的基礎上,詳細介紹了dfl理論,通過比較闡明了dfl理論其本質是逆系統方的一類,並結合具體課題推導出的模型方程將dfl理論進行了擴展,使之適應于電力系統這個強非線性對象。通過參考大量的書籍文獻推導出一實用的可將大型汽輪發電機勵磁與汽門綜合起來進行控制的模型方程,此模型方程涵蓋了電力系統中特別引人注目的幾個量- -轉子角、轉子轉速、發電機q軸電勢eq 、暫態電勢e ' q 、有功功率pe 、機械功率pm 、汽門開度、機端電vt ,在此基礎上建立了實用的電力系統簡化的數學模型,並將擴展的dfl理論應用於此模型系統,結合線性二次型最優控制理論設計出大型汽輪發電機的非線性綜合控制器及機端電最優控制器,通過模擬實驗與採用常規的按電偏差進行調節的比例式勵磁控制器+汽門比例控制及採用常規的按電偏差進行調節的比例式勵磁調節器和基於二次型性能指標設計的最優快控汽門(考慮發電機的飽和因素)進行了對比,證實了採用此種控制器可以有效地提高電力系統的暫態穩定性,並且在電力系統遭受小干擾時同樣具有良好的調節性能。
  15. Abstract : the stimulation treatment of & quot; loosening rock by the dilatancy of explosive waves & quot; is tested in the casing well 4242 for studying its result and its influence on casing. the result of the field test shows that this test is successful in technology, the oil production of the well is 4 times as much as that of it before the test ; the deformation of casing is local, and the result of the strength calculation shows that the deformation will not destroy casing

    文摘:為了研究「脹松動」增產技術的增產效果和對管的影響,在延長石油管理局子長油礦對4242井進行了現場實驗.該技術採用強動載波在地層深處疊加的方,造成脹條件,松動巖石,增大近井帶滲透率,提高油井產量.施工后,該井產量增加為原來的4倍多.本次實驗工藝上是成功的,首先是按設計要求引爆了炸藥,其二是由於採取了保護措施,使管變形局限在施工段處,不影響下泵,不影響油井生產;管強度校核分析也證明了管不會破壞.施工后地質效果明顯
  16. Sintered metal bushes - determination of radial crushing strength

    燒結金屬襯徑向潰強度測定
  17. A compression algorithm can be developed exploiting this basis to obtain the most economical representation of the image in terms of textured patterns

    根據這種自適應基可以制定一縮演算,從而用較少的系數就可以描述紋理圖象。
  18. On the basis of vibratory compaction test using silt, which is difficult to compaction and cement - stabilized soil, which is the most conventional semi - rigid material, the influence regularity of vibratory parameters such as amplitude, frequency, centrifugal force, intensity of pressure, time of vibratory and material factors such as water content is studied

    研究了靜面力、激振力、頻率、振幅、振動時間等振動實參數以及含水量等材料因素對振動實效果的影響規律。根據各參數對振動實效果的影響規律,找出一實效果好並且和現有振動路機的技術參數基本相符的振動參數,在此基礎上提出擬定道路材料振動實的試驗方的參考意見。
  19. It is rapidly modifying and fabricating the eccentric - sleeve press by means of illustration, with less quantity of modified parts and shorter time, which can fulfill the requests of the clients to the delivery - date and the process

    摘要採用作圖快速改制固定式偏心力機,改制工件少,時間短,及時滿足用戶對產品交貨期及工藝的需求。
  20. Considering such embarrassed condition, the present study puts forward two theories, which is standard solution and model solution, to obtain the wind - induced response and eswl on civil engineering buildings. by applying the above - mentioned two solutions, the wind - induced dynamic problems on long span roofs can be solved. and the characteristic of wind pressures on long span roofs is also investigated

    本文提出建築結構風致響應和等效風荷載的標準( standard )解和模態( model )解,並把這兩應用於大跨度屋蓋結構中,同時對大跨度屋蓋結構表面風的分佈特徵進行了分析。
分享友人