實用樓面面積 的英文怎麼說

中文拼音 [shíyònglóumiànmiàn]
實用樓面面積 英文
net floor area
  • : Ⅰ形容詞1 (內部完全填滿 沒有空隙) solid 2 (真實; 實在) true; real; honest Ⅱ名詞1 (實際; 事實...
  • : Ⅰ動詞1 (使用) use; employ; apply 2 (多用於否定: 需要) need 3 (敬辭: 吃; 喝) eat; drink Ⅱ名...
  • : 1 (樓房) a storied building 2 (樓房的一層) floor; storey 3 (房屋或其他建築物上加蓋的一層房子...
  • : Ⅰ名詞1 (頭的前部; 臉) face 2 (物體的表面) surface; top 3 (外露的一層或正面) outside; the ri...
  • : Ⅰ動詞(積累) amass; store up; accumulate Ⅱ形容詞(長時間積累下來的) long standing; long pending...
  • 樓面 : [建築] floor樓面板 floorboard; floor plate; 樓面面積 floor area; 樓面系統 floor system
  • 面積 : [數學] area
  1. To the house of bricky structure, rock - bottom wall body area is large, the wall body area of superstratum is small, so similar unit, upstairs and downstair cover inside practical area or meeting discriminating ; same layer will tell, although be covered identically inside floor area, cover the unit of the unit inter of horn that compare clip inside usable floor area also is met a few smaller

    對磚結構的房子來說,底層的墻體厚,上層的墻體薄,所以同樣的單元,下的套內還是會有差別的;同一層來講,即使相同的套內建築,把角的單元比夾在中間的單元套內使也會小一些。
  2. Saleable floor area

    實用樓面面積
  3. The new building will provide accommodation for laboratories and other research infrastructures, lecture theatres, general teaching rooms, staff offices and communal areas

    高十四層,提供建築約二萬四千七百平方米,設有驗室及科研配套設施、演講廳、課室、辦公室及公地方。
  4. With the increase of the number of large - span large - area and large - space buildings in cities, temperature cracks of cast - in - place slab with large - area draw more and more public attentions. this problem has become a difficult nut in the engineering practice

    隨著大柱網、大空間結構形式的各種公共建築和工業廠房的不斷涌現,大現澆蓋結構也得到了日益廣泛的應,而其裂縫引起的質量問題更是越來越受到各方的重視,成為際工程中急需解決的難題。
  5. Construction work will first start with the 3 - storey technical block where the master control centre and the editing suites will be located. the administration tower with 7 storeys and usable floor area of about 14, 700 sq metre will be located above the technical block

    首先進行的工程將會是高三層的工程大,總控制室、配音室及剪接室均座落於此,上蓋的行政大共七層,一萬四千七百平方米。
  6. School have independent and intact teaching place, such as teaching buildings, students flats, large - scale indoor sport field, outdoor leisure square, computer rooms, sound rooms, reading rooms, lab, libraries, teaching and ancillary facilities etc. the new building with 8000 square meters is in use now

    學校有獨立完整的教學場所,擁有教學、學生公寓、大型室內運動場、室外休閑廣場習車間、圖書閱覽室、計算機室、多媒體教室、語音室、基礎及專業驗室等教學及輔助設施,建築8000平方米的新教學大已投產使
  7. Consequently, the precast components don ’ t need any interim falseworks to be supported in the mid - span as bottom forms when the laminated concrete lay is being placed. furthermore, to form two - way slabs, the transverse steels can be arranged through the rectangular cores in the ribs of the precast slabs as needed. it makes the construction of composite two - way slabs easier and more feasible, practical, and suitable to introduce and apply to the building construction on a large area

    由於預制構件具有剛度大和承載力高的特點,施工時以預制構件作為板底模無需設置跨中臨時支撐;同時還能通過預制構件板肋預留的長方形孔布置橫向受力鋼筋板的雙向配筋,使預應力雙向疊合板的施工簡單易行,更適合於大的推廣應,具有較大的工程應價值。
  8. Designed a program which can use the mean pressure coefficient of jin ’ ao mansion to calculate mean wind load of the whole buildings and local floor. the integral result can apply into the practical design of construction, also can compare with the results of wind tunnel balance test to validate the veracity of this test

    通過自編的程序對金奧大廈表時均風壓系數進行分計算獲得其整體和局部層的平均風荷載,分計算的結果一方可以方便地運際的建築結構設計中,另一方可以與風洞天平測力結果進行比較驗證動態測壓試驗的正確性。
  9. 7 - storey office building with usable floor area of about 14, 700 sq. m

    七層高之辦公室大約14 , 700平方米
  10. The efficiency ratio of a development, otherwise known as saleable ratio, is calculated by dividing the saleable area of a development by its gross floor area, and is used in assessing the gross development value of a project by reference to comparable transactions

    一項發展的率,是指該項發展的除以其總所得的比率,以跟相若的發展項目比較,以評估一項計劃的總發展價值。
  11. This paper disscuses some problems on how to serve the management of houses sufficientlly and how to a sure the justies and accuracy of the real estate surveying

    摘要結合際工作,探討了外墻共建築梯與電梯的分攤與計算等問題。
  12. Usable floor area

    實用樓面面積
  13. The system simultaneously used the technique of computer, electron as well as single - chip microcomputer, and solved the key problem brought about by the pump ' s high speed revolving all the time. that is, the electrical energy ' s waste, which existed in the water supply system of the city and the high building. at the same time overcome the shortcomimg of long reaction time of the traditional water supply system, varied frequency at low speed, made use of large area, and consume a lot

    該系統集計算機、電子技術於一體,不但解決了目前城市供水系統和小區高供水中,水泵一直高速轉動所帶來的電能浪費的問題,而且也克服了傳統的供水系統響應時間長,變頻速度慢,佔地大,投資大等缺點,為時恆壓供水提供了一種的方法。
分享友人