實載重量 的英文怎麼說

中文拼音 [shízǎizhòngliáng]
實載重量 英文
deadweight carrying capacity
  • : Ⅰ形容詞1 (內部完全填滿 沒有空隙) solid 2 (真實; 實在) true; real; honest Ⅱ名詞1 (實際; 事實...
  • : 載Ⅰ名詞(年) year : 一年半載 six to twelve months; six months to a year; 三年五載 three to five ...
  • : 重Ⅰ名詞(重量; 分量) weight Ⅱ動詞(重視) lay [place put] stress on; place value upon; attach im...
  • : 量動1. (度量) measure 2. (估量) estimate; size up
  • 載重量 : bearing value
  • 載重 : load; carrying capacity
  1. The carload quantity referred to on a carload rate has nothing to do with the actual quantity required to fill the rail car, but is the minimum weight specified to qualify for a lower class rate

    指的是車費率,與需要裝滿整車的際數無關,而是指合乎較低的費率限定所規定之最低
  2. Article 75 if the bill of lading contains particulars concerning the description, mark, number of packages or pieces, weight or quantity of the goods with respect to which the carrier or the other person issuing the bill of lading on his behalf has the knowledge or reasonable grounds to suspect that such particulars do not accurately represent the goods actually received, or, where a shipped bill of lading is issued, loaded, or if he has had no reasonable means of checking, the carrier or such other person may make a note in the bill of lading specifying those inaccuracies, the grounds for suspicion or the lack of reasonable means of checking

    第七十五條承運人或者代其簽發提單的人,知道或者有合理的根據懷疑提單記的貨物的品名、標志、包數或者件數、或者體積與際接收的貨物符,在簽發己裝船提單的情況下懷疑與已裝船的貨物不符,或者沒有適當的方法核對提單記的,可以在提單上批註,說明不符之處、懷疑的根據或者說明無法核對。
  3. The soft switching, phase - shifted pwm and bi - directional dc - dc converter hang together, depress circuit switching loss and noise effectively, which provide condition to increase switch frequency, efficiency and reduce size and weight for the converter ; at the same time, it is proved the converter can achieve zvs in larger load variation, and the converter has the virtue of structure compact, voltage and current stress small such as ordinary hard switch converter

    該變換器把軟開關技術和相移控制pwm技術以及雙向dc - dc變換器技術有機結合在一起,有效地降低了電路的開關損耗和開關噪聲,為變換器裝置提高開關頻率、效率以及降低尺寸及提供了良好的條件;同時,能拓寬零電壓開關的范圍,使變換器在較寬的負變化范圍內都能現軟開關。
  4. Finally, the author puts forward the countermeasures and the suggestions in the development of the animal husbandry in jiuquan oasis, which are to confirm the rational amount of domestic animal loaded ; to protect the meadow resource and to develop the high - quality artificial meadow energeti cally ; to implement the virtual water strategy in order to alleviate the ecological environment pressure in jiuquan oasis ; to advance the industrialization process of animal husbandry energetically ; to process and utilize crops by product in the agricultural district ; to strengthen the construction of shelter forest of qilian mountains ; to organize the seasonal production of the animal husbandry ; to popularize the fatten poultries technology in the other land ; to strengthen the rational planning of the production of the animal husbandry ; to increase fund input ; to accelerate the basic construction of the animal husbandry and to prevent and cure the grassland which mouse hurt

    採用層次分析法對酒泉綠洲畜牧業發展的要影響因素做了判斷。最後從確定合理的,大力保護草地資源和發展優質人工草地,施虛擬水戰略以緩解酒泉綠洲的生態環境壓力,大力推進畜牧業產業化進程,對農區農作物副產品的加工利用、加強祁連山防護林建設、組織畜牧業季節性生產,推廣推廣肉禽異地育肥技術、加強畜牧業生產的合理規劃、增加資金投入,加快畜牧業基礎設施的建設以及草原鼠害的防治等十個方面提出了酒泉綠洲畜牧業發展的具體對策建議,以期望能對酒泉市的社會經濟發展提供科學的決策依據。
  5. The unfocused aspherical surface system is one of the main structure of large emiting system. in the system, the more large the relative aperture of primary mirror, the more small the focal length and the tube of system, and the more light the weigth

    這個系統中的主反射鏡的相對孔徑越大,其焦距就越短,相應地系統筒長就越短,就越輕,這樣就越能滿足車或機系統的戰要求。
  6. Secondly, their aims are made the investment of substations, feeders or running cost of electric power system minimum. but they do n ' t take into account of land utilization, street accessibility of right of way, etc., but demands of electric power system. generally, a straight line distance, namely, euclid distance, was used for calculating the distance between a load point and a substation, which is a straight forward but non - practical way for most planning techniques

    其次受研究工具的限制,這些模型以工程投資、運行費用等最小為目標,僅能考慮導線、電壓降等電力系統技術約束條件,簡化略去了用地限制、街道可達性等要的自然約束條件,且求解這些模型的前奏是計算負荷點到變電所的歐幾里得距離(直線距離) ,簡便但不切合際(這一點在城市電網規劃中尤其要) ,因此較難給出技術上可行的最優解。
  7. The automatic metering system for 33 - 07 trucks can accurately make automatic metering and recording of mine - used truck hauling data such as run number, load, time etc. under various complicate and deteriorative operational environment conditions so as to realize the automation and computerization of the metering of mine - used truck hauling and meet the requirements of the truck hauling management in open - pit mine operation. as a result, it is of high popularization value

    07汽車自動計系統能夠在礦用汽車各種復雜、惡劣的作業環境條件下對汽車運輸作業的車次、、時間等數據進行準確自動計和記錄,現了礦用汽車運輸作業計的自動化和計算機化,滿足了露天礦山生產汽車運輸管理工作的需要,具有較高的推廣應用價值。
  8. Banks assume no liability or responsibility for the form, sufficiency, accuracy, genuineness, falsification or legal effect of any document, or for the general and or particular conditions stipulated in the document or superimposed thereon ; nor do they assume any liability or responsibility for the description, quantity, weight, quality, condition, packing, delivery, value or existence of the goods represented by any document, or for the good faith or acts and or omissions, solvency, performance or standing of the consignors, the carriers, the forwarders, the consignees or the insurers of the goods, or any other person whomsoever. article 14 - disclaimer on delays, loss in transit and translation

    銀行對任何單據的格式完整性準確性真性虛假性或其法律效力或對在單據中明或在其上附加的一般性及或特殊性的條款,概不承擔責任或對其負責銀行也不對任何單據所表示的貨物的描述數狀況包裝交貨價值或存在或對貨物的發運人承運人運輸代理收貨人或保險人或其他任何人的誠信或作為及或不作為清償力業績或信譽承擔責任或對其負責。
  9. Banks assume no liability or responsibility of the form, sufficiency, accuracy, genuineness, falsification or legal effect of any document ( s ) or superimposed thereon ; nor do they assume any liability, condition, packing, delivery, value of existence of the goods represented by any document ( s ), or for the good faith or acts and / or omission, solvency, performance or standing of the consignors, the carriers, the forwarders, the consignees or the insurers of the goods, or any other person whomsoever

    銀行對任何單據的格式、完整性、準確性、真性、虛假性或其法律效力、或對在單據中明或在其上附加的一般性和/或特殊性的條款不承擔責任或對其負責;銀行也不對任何單據所表示的貨物的描述、數、質、狀況、包裝、交貨、價值或存在、或對貨物的發運人、承運人、運輸行、收貨人和保險人或其他任何人的誠信或行為和/或疏忽、清償力、業績或信譽承擔責任或對其負責。
  10. Now, there are four evaluation methods in this field, every method has its advantages and shortages and most of them are established based on highway. high weight communication, great loads channelized traffic and high speed is the expressway ' s feature, there is great difference in the development law between highway and expressway. we will get some unfitness result by using those evaluation methods to evaluate expressway

    目前國內外常用的四類路面使用性能評價方法中回歸法評價結果與測數據相關性不太理想,系統分析法客觀性不強,灰色理論法存在一定的主觀經驗性,其它一些方法還處于研究階段;而且這些方法都是基於普通公路建立,高速公路具有交通大、汽車軸、交通渠化和行車速度高等特點,路面使用性能的特點和發展變化規律與普通公路存在較大差異。
  11. The acceleration response of the sprung mass for the quarter vehicle model the suspension system under periodical excitation and certain road uneven random excitations were discussed

    為了反映車狀況,著討論了在調和激振和隨機路面激振下變剛度彈簧懸架簧的動態相應特性。
  12. Concrete filled steel tube ( cfst ) arch bridge is a new type of bridge which is widely applied in china recently, and it is a relatively ideal structural form for long span arch bridge. with the background of the practice of liantuo bridge, in the view of point of feasible in technology and reasonable in economy, the key techniques and difficulties in the construction of cfst arch bridge are analyzed and discussed in the thesis. the disadvantages in the current design and construction and the improvement method are also indicated

    本文以蓮沱特大橋工程踐為背景,以主拱施工研究為主線,對鋼管混凝土拱橋難點施工工藝,從技術上可行、經濟上合理的角度出發,詳細的進行了分析闡述,並指出了設計施工中存在的不足和今後需改進的方向;通過對鋼管混凝土拱橋施工過程中內力的計算,確定了拱肋施工最不利荷工況下加、壓順序和張拉臨時預應力束等一系列施工措施,並將計算結果與現場監測觀測數據進行了比較分析,為今後進一步研究這類結構提供了參考。
  13. The data is processed to obtain parameters required to model the system and then the system is realized on computer. now the position and load of the car of interest can be ready to be used. during the research, two methods are employed : neural network and attribute theory

    然後,對採集到的信號,進行數據分析、處理,並通過在對橋式起機的整個狀態監測過程中,進行系統建模,並使得整個模型在計算機上現,從而能夠及時得到小車的位置和荷的參數。
  14. This method has three merits : first, reduce the harm to the battery ; second, this current is stable ; the last, the current may represent the battery ' s current function better. in order to study this problem, we design a install to make lots of experiments to prove this result. the install can use in the factory as a automation instrument if it be perfected

    此方法和原有方法比較有三大憂點:一是減少了直接短路時大電流放電對電池的損傷:二是此迴路電流值穩定存在,可以對其進行比較準確的測:三是此電流值更能代表堿錳電池際工作時的放電性能c為了本研究的順利施,本課題提出了一個堿錳電池四參數檢測的驗平臺,做到對電池的開路電壓、負電壓、電流指標、電池四參數的檢測。
  15. They are used to control the load distribution system, which is able to perform an active simulation of the weight distribution of several hundred passengers using water tanks

    它們被用來控制負分佈系統,此分佈系統用來對數百名客戶的分佈情況進行際模擬。
  16. We hereby confirm that cargo weight in shipping order is the same as customs application data and actual cargo weight. package & stuffing is strictly in conformity with maritime transportation requirement

    我司出運上述貨物為石料,我司保證托單所顯示的以及報關的數據與際出貨一致,並且貨物裝符合海上安全運輸的要求。
  17. The controller can set elevator rated load tonnage for free or read the actual load weight in car directly as the rated load tonnage

    控制儀操作方便,具有自動去皮控制可調功能,直接讀取為設定荷。
  18. This paper, regarding the asphalt pavement in the zhoukou region as the study object, according to the prevalent norms ( specifications for design of highway asphalt pavement ), with the beginning of the pavement performance and the transportation investigation, totally and systematically analyzes the traffic parameters and the destroying reason of pavement at the early stage in the point of fatigue property and limit strength, gives the concepts and methods of the growth rate of equivalent axle load action time, seasonal modification factor and overload factor, proposes the method of axle load conversion on the condition of heavy loading. on this basis, it proposes the design method adapting to asphalt pavement construction, explains the steps of thickness computation of construction with the combination of engineering example, finally verifies thedesign method in the paper by test road. theory and practice both prove that the reasonability of pavement structure style and the reliability of design method in the paper can adapt to the present heavy loading and overloading traffic conditions, have highly theoretical and practical value

    本文以周口地區瀝青路面為研究對象,以現行《公路瀝青路面設計規范》為依據,從路面使用性能和交通特徵的調查入手,從疲勞特性和極限強度出發分析了路面早期破損的原因,全面系統地進行了交通參數的分析,提出了當軸次增長率、季節修正系數和超系數的概念和方法,並提出了交通的軸換算方法。在此基礎上,針對超交通從結構組合設計、結構厚度計算(包括疲勞強度標準和極限強度標準)等方面提出了適宜的瀝青路面結構設計方法,並結合工程測,說明了結構層厚度計算的具體步驟,最後通過試驗路驗證本文提出的設計方法。理論與踐均表明,本文提出的路面結構型式合理、設計方法可靠,能適應目前、超交通的狀況,具有較高理論與用價值。
  19. The fifth chapter experiments on the cushioning performance of the three sets of systems with pid / pdf algorithm. mainly on how to influence the systems cushioning performance while changing the preset input signal frequency and the load mass. and on the systems " repeatability. reappearance and the stability. additionally this chapter compares the pid algorithm with the pdf algorithm in their influence on system cushioning performance. the final experiment results testifies that the thesis successfully realizes the expected cushioning effects of the three different sets of high - speed pneumatic system

    第五章對pid 、 pdf控制策略系統緩沖性能進行了驗研究,主要研究了給定輸入信號頻率的改變對系統緩沖性能的影響、長時間工作時系統的復性和再現性以及不同負下系統的緩沖性能的現;同時比較了pid 、 pdf控制策略對系統緩沖性能的影響。最後驗結果表明,本課題用pid 、 pdf策略很好的現了三套不同類型的高速氣動系統的緩沖,緩沖效果是很不錯的。
  20. The controller adopts three - digit alphanumeric pipe for displaying the percentage between the actual loads and rated load value, and elevator rated load tonnage, which is convenient for users operation

    控制儀採用3位數碼管顯示:用於顯示與電梯荷值的百分比,顯示電梯額設定噸位,方便用戶操作
分享友人