尾水調壓井 的英文怎麼說
中文拼音 [wěishuǐdiàoyājǐng]
尾水調壓井
英文
tailrace surge basin-
In this paper according to the design scheme of yao heba power station in nan yahe river, the mathematical model with longer and complicated conduit system, elastic water hammer and pid regulating low of voter turbine adjusting system in the case of the small fluctuation has being built, which include conduit system, surge tank, draft tube, water turbine, generator and governor. the hydraulic losses are taken into account, and nonlinearization in water turbine and the governor is also taken into account
本文根據南椏河姚河壩水電站的設計方案,對水輪機調節系統,按長引水管道復雜引水系統、彈性水擊、調速器為pid調節規律,在小波動情況下,對包括引水道、調壓井、尾水管、水輪機、發電機、調速器在內的水輪機調節系統建立數學模型,並計及引水管道水力摩阻損失,對水輪機、調速器考慮了其中的非線性,利用功能強大的matlab軟體編制了源程序進行計算機模擬計算。All kinds of special pipes and conduits ( ditches ), ash storage sites, wells, pumping stations, water cooling towers, oil depots, dikes and dams, railways, roads, bridges, docks, fuel loading and unloading equipment, lightening arresters, fire - fighting equipment and other related ancillary equipment outside power plants and power transformation stations
(三) 、水力發電廠使用的水庫、大壩、取水口、引水隧洞(含支洞口) 、引水渠道、調壓井(塔) 、露天高壓管道、廠房、尾水渠、廠房與大壩間的通訊設施及附屬設施。Reservoirs, dams, water inlet, water diversion tunnels ( including branch tunnels, water diversion canals, voltage adjustment wells ( towers ), open - air high - voltage conduits, premises, water discharge canals, communications facilities between premises and dams and other related ancillary equipment used by hydropower stations
(三) 、水力發電廠使用的水庫、大壩、取水口、引水隧洞(含支洞口) 、引水渠道、調壓井(塔) 、露天高壓管道、廠房、尾水渠、廠房與大壩間的通訊設施及附屬設施。In this case, when one of the machines be placed into the transition process of the vident fluctuating pressure for some kind of reason, the other machines would be affected become of the fluctuating pressure in the diversion system and drainage system of water in upstream and downstream which use the same one surge tank and the same one penstock with the machine, so the other machines would be put into transition process of fluctuating pressure, and become a kind of hydroelectric interfere
在高水頭引水式水電站中,通常幾臺機組共用同一調壓井,且共用壓力主管。在這種情況下,當其中一臺機組由於某種原因處于大波動過渡過程,則其在電站上下游引、尾水系統中引起的壓力變化必然會影響與其共用調壓井和壓力主管的其它機組,使其它機組也處于過渡過程,形成一種水力干擾。分享友人