尾水洞 的英文怎麼說
中文拼音 [wěishuǐdòng]
尾水洞
英文
tailrace tunnel-
Construction of long tailrace tunnel bifurcation concrete structure for dachaoshan hydropower station
大朝山水電站長尾水隧洞岔管混凝土施工The calculated result from an example shows that the stable sectional area reduces with the increase of working head, or the decrease of the tailrace tunnel length
計算結果表明,尾水調壓室斷面面積隨水輪機工作水頭的增大或尾水洞長度的縮短而減小。The impacts of both the velocity head and momentum distribution in the t - junction of a tailrace surge tank on the critical stable sectional area of the tank were analyzed by using gardel ' s empirical equations for t - junction flow. based on thoma ' s theory, a formula of the critical stable sectional area is derived. 5
基於gardel關於三通管水頭損失的經驗公式,研究分析了連接管處的速度水頭以及進出調壓室水體與尾水隧洞水體之間的動量交換,對有連接管的尾水調壓室穩定斷面積的影響,並在托馬( thoma )假定基礎上,推導出相應的調壓室穩定斷面的計算公式; 5Meanwhile, the study also shows that the diversity of studied cave animals is inversely proportional to human population density and water quality ; and bio - diversity, to some extent, is proportional to soil fertility and amount of chemical fertilizer, but inversely when excessive ; the correlativity between bio - diversity and vegetation cover rate is not obvious, when ground vegetation is strongly interfered by human being ; the amount of diestrammena marmorata is proportional to the d iversity of plant, and inversely proportional to soil fertility, and in a way, to water quality ; and the correlativity between community and water quality and soil fertility, and between water quality and the amount of mosquito and fly, is not as good as expected. the author points out that diestrammena marmorata, bat, mosquito, fly, oreolalaxrhohostig metus ( or cudata ), and fish can be chosen as in
同時,研究還表明:調查洞穴的物種多樣性與人口密度、水質成負相關;在一定范圍內,物種多樣性與化肥施用量、土壤肥力成正相關,超過一定的值則成負相關;在人類對地表植被的高強度作用下,物種多樣性與植被覆蓋率的相關性不明顯;蚊蠅數量與土壤肥力基本上呈正相關;斑灶馬數量與植物種數呈正相關,斑灶馬數量與在一定水質范圍內與水質呈負相關,與土壤肥力呈負相關;群落數與水質和土壤肥力、蚊蠅數量與水質都不能表現較好的相關性;研究認為,可以選擇斑灶馬、蝙蝠、蚊蠅、紅點囊蟾(或有尾類) 、魚類等作為指示動物對洞穴環境進行監測。Transient flow calculation for sloping ceiling tailwater tunnels and their body - type design for hydropower stations
水電站變頂高尾水洞瞬變流計算及體型設計Its catchment area covers 15 square kilometers, and it flows northward from lin tong mei through hang tau tai po and kwu tung to join the river indus at ho sheung heung
雙魚河的集水區有15平方公里,源頭位於蓮塘尾,向北流經坑頭大布和古洞,于河上鄉處匯接梧桐河。All kinds of special pipes and conduits ( ditches ), ash storage sites, wells, pumping stations, water cooling towers, oil depots, dikes and dams, railways, roads, bridges, docks, fuel loading and unloading equipment, lightening arresters, fire - fighting equipment and other related ancillary equipment outside power plants and power transformation stations
(三) 、水力發電廠使用的水庫、大壩、取水口、引水隧洞(含支洞口) 、引水渠道、調壓井(塔) 、露天高壓管道、廠房、尾水渠、廠房與大壩間的通訊設施及附屬設施。Reservoirs, dams, water inlet, water diversion tunnels ( including branch tunnels, water diversion canals, voltage adjustment wells ( towers ), open - air high - voltage conduits, premises, water discharge canals, communications facilities between premises and dams and other related ancillary equipment used by hydropower stations
(三) 、水力發電廠使用的水庫、大壩、取水口、引水隧洞(含支洞口) 、引水渠道、調壓井(塔) 、露天高壓管道、廠房、尾水渠、廠房與大壩間的通訊設施及附屬設施。Abstract : yingdongpo gold mine as an example of gold mine, it ' s oredressing wastewater quality was investigated. alkali chlorinating process being adopted for treating the oredressing wastewater of yingdongpo gold mine, it has achieved good result in removing the cyanide and heavy metal. after analyzing the experimental result for the affecting factors, the project that using the method of intermittence reaction to treat the cyanide wastewater is proposed
文摘:以銀洞坡金礦為例,對選礦廠含氰廢水進行了水質調查,採用堿性氯化法處理銀洞坡金礦尾礦庫的含氰廢水,在去除氰化物和重金屬方面都取得了較好的效果,提出了採用間歇式方法處理含氰廢水工藝方案。Nuozadu hydro - electrical power station, which is 261. 5 m dam height and 5, 850 mw installed capacity, is planned to build on the middle - lower reaches of lancang river near shimao city, yunnan province. it is planned to adopt rockfill dam and underground powerhouses in the left bank. the underground cavities mainly include three large cavities
瀾滄江糯扎渡水電站擬建壩高261 . 5m ,裝機容量5850mw ,採用左岸地下發電系統,由主廠房、主變室、尾水調壓室以及尾水洞等構成龐大而復雜的地下洞室群。分享友人