峰值系數 的英文怎麼說

中文拼音 [fēngzhíshǔ]
峰值系數 英文
crest factor
  • : Ⅰ名詞1. (山的突出的尖頂) peak; summit 2. (形狀像山峰的事物) peak-like thing Ⅱ量詞(用於駱駝)
  • : 系動詞(打結; 扣) tie; fasten; do up; button up
  • : 數副詞(屢次) frequently; repeatedly
  • 系數 : [數學] coefficient; ratio; modulus; quotient; factor
  1. The absolute values of the coefficients of any chromatic polynomial form a unimodal sequence.

    任何多項式的絕對都構成單序列。
  2. Finally, with caparisons of that three parapets properties cantilevered parapets has been adopt to the steel structure of light - weight buildings with gabled frames, numerical simulations have been carried out with that buildings, results of simulations show that device can also significantly reduce the area - averaged coefficient of wind pressure and high negative suction peaks on zones susceptible to wind pressure. formula has been proposed about the height of that parapet

    最後通過三種女兒墻的性能比較確定對門式剛架設置懸挑女兒墻進行模擬,結果同樣表明懸挑女兒墻能明顯地降低門式剛架屋面風荷載敏感區的負壓及屋面風荷載體型,並給出了女兒墻高度限公式。
  3. Besides, this paper adopts the random finite element method, uses geometric and physical mechanical parameters that are relevant to lining weight of surrounding rock, coefficient of lateral pressure, height or buried depth of vertical loading, elastic resistance coefficients of surrounding rock, elastic modulus of support structure, unit weight of concrete, thickness of the structure as well as torsional strength and compression strength of concrete and etc., as random variables, applies the monte - carlo method to sampling by computer, preliminarily evaluates the reliability of bearing capacity and stability of molded concrete lining of the xuefeng mountain tunnel, and obtains the related displacement of the lining, mean value and variance of internal force, and computed the reliability index of lining structures

    此外,本文採用隨機有限元方法,將圍巖容重、側壓力、垂直荷載高度或埋深、圍巖的彈性抗力、支護結構的彈性模量、混凝土容重、結構的厚度以及混凝土的抗扭與抗壓強度等與襯砌結構有關的幾何與物理力學參作為隨機變量,應用蒙特卡洛理論進行計算機隨機取樣,對雪山隧道模注混凝土襯砌的承載力與穩定性的可靠度進行了初步評估,得出了襯砌的相關位移與內力的均和方差,並計算出了相應的襯砌結構可靠指標。
  4. The resuts showed that the annual average temperature had an increasing trend ; summer, autumn and winter average temperature also had an increasing trend and the amplitude in winter was bigger ; the change of standard deviation and coefficient of variation were acute during winter ; the coefficients was bigger ; the change of standard deviation and coefficient of variation were acute during winter ; the coefficients of skewness were positive value during summer and autumn ; the kurtosis coefficients were bigger during winter

    得出如下結論:和田地區年氣溫有增加的趨勢;夏季、秋季、冬季氣溫也有增加的趨勢且冬季氣溫增幅較大;標準差及變差都是冬季變化較為劇烈;偏度在夏季及秋季為正在冬季較大。
  5. Climate in this valley changes sharply with vertical difference and rainfall increases with the height. calculation indicates that the design day rainstorm amount reaches 133mm, the rainfall intensity of day storm reaches 6. 05mm / h, the design storm peak discharge is 239. 7m3 / s and 753. 0

    在計算泥石流流量時,因考慮到泥石流固體物質的前期含水量、泥石流堵塞斷流增加的暴雨徑流量、泥石流間歇性陣流的迭加流量都會使泥石流流量增加,需要在計算公式中引入一個泥石流流量積累
  6. We also find that the strong long - range interaction, the large transverse field and weak interfacial coupling can lead to the disappearance of some of the peaks of the pyroelectric coefficient and susceptibility of the ferroelectric bilayer. we believe that it is the reason why these phenomena always take place in the experimental studies

    我們還發現,較強的長程相互作用,較大的橫場以及相對較弱的界面耦合作用將會導致鐵電雙層薄膜的熱電和介電極化率的某些消失,這可以用來解釋在實驗中常常觀測不到熱釋電和介電極化率的某些的原因。
  7. The greater the peak strain of the core concrete is, the greater the stability factor of the medium long column will be

    核心混凝土的應變越大,鋼管混凝土中長柱的穩定越大。
  8. When the adhesion coefficient is close to the maximum tire - road friction coefficient, the current adhesion coefficient is used as maximum tire - road friction coefficient to control the drive torque

    當觀測到? -曲線接近於點時,將該時刻的輪胎利用附著作為路面附著,並根據識別的路面附著進行驅動防滑控制。
  9. The paper ’ s main works are as follow : ( 1 ) several methods of getting pitch period are researched in details. according to the real - time demand for the systems, the methods for pitch searching are simplified as follow : after searching the peak value point every third point within pitch range, search the peak value point every point near the current peak value point

    ( 1 )研究了基音周期的求取方法,並根據統的實時要求,將逐點搜索基音周期的方法簡化為粗細法,即在基音周期范圍內隔點搜索相關函最大點,然後在此時得到的最大點附近繼續搜索,將最後得到的點作為基音周期
  10. 4. achieved the high - speed colliding experiment of landslide for the first time, the paper studies the volume distributing ruler of different velocity segment after collide, fits the experiment data via extreme function, obtains the value range of the shape parameter, thereby gets the distributing function of all part of landslide after collide. on the base of above, the paper studies the accelerating effect of partial rock - mass because of colliding, and acquires the relation between accelerating volume and overall volume, and colliding velocity

    ( 4 )首次進行了滑坡巖體的高速碰撞模型實驗,研究了碰撞解體后不同速度段巖體體積的分佈規律,並應用extreme函對實驗結果進行了據擬合,確定出了各形狀參的取范圍,從而得到了滑坡巖體高速碰撞后不同塊體的分佈函,並在此基礎上研究了滑坡巖體碰撞後部分巖體的加速運西南交通大學博士研究生學位論文第2頁動效應,得出了獲得加速的巖體比例與滑坡總體積及碰撞速度的關
  11. In this paper, through modeling and analyzing the non - continuities in the rf structures of twt, scattering parameter s11 is derived to represent the peak - peak values of the ripples of gain and phase - shift in traveling wave tubes, providing with some instructions for the controlling of the uniformity of gain and phase - shift in twts

    本文通過對具有高頻不連續性的行波管進行建模分析,用表徵不連續性的反射的幅度給出了行波管增益和相移的量級,對控制相位一致性行波管的不連續性提供了依據。
  12. At last, in according to the experiment results, the interpretation of the mechanism of the slip phenomenon of prepressing - contact spring - damping system was given in this dissertation. further more, the relationship among the limit frequency, the value of prepressing, excitation frequency, the amplitude of excitation and the materiel parameter was analyzed. base on the theory analysis the limit frequency formula was given, and the contact - slip condition for engineering application was concluded

    最後根據理論研究與試驗分析的結果,分析預緊接觸式彈簧阻尼統產生滑移現象的機理以及共振漂移現象的理論解釋,並通過定性分析接觸分離時的頻率與預緊量、激勵頻率、激勵力幅以及墊層的材料參之間的關,提出能定量描述統出現滑移現象的極限頻率公式,總結了預緊接觸式結構始終保持接觸的條件。
  13. Based on the analysis about the test requirements and the saturated magnetization of the armor plate, the excitation magnetic circuit satisfying the testing condition and a validation system are designed. because the geometric, of the magnetic leakage at the direction of the normal of the roundness fault has the feature of two peaks : a positive and a negative, using the linear regression and the software matlab, two regression equation are proposed : one is about the peak value of the magnetic leakage and the diameter and depth of the roundness fault ; the other is the distance between the two peaks and the diameter of the roundness fault. the result of the validation system proves that the two equations are valid, and an applied method using for quantificationally inspecting the roundness faults is proposed according to the two equations

    根據實驗要求,通過對鋼板達到飽和磁化的必要性進行的分析,設計了符合試驗條件的勵磁磁路,並設計了一套實驗驗證統;根據圓形缺陷法線分量漏磁場幾何圖形正負雙的特點,採用線性回歸擬合的原理和matlab軟體及其統計工具箱中的相關函,給出了圓形缺陷漏磁場幾何圖形的與圓形缺陷的直徑和深度以及間距與圓形缺陷直徑的兩個回歸擬合方程,並通過實驗驗證統驗證了擬合方程的正確性,利用這兩個簡單實用的擬合方程,提出了一種工程定量檢測圓形缺陷的應用方案。
  14. We analyzed the regular pattern of daily medicine cost change of operation inpatients during hospitalization in every group. the results indicated that the median line of daily medicine cost had similar regular pattern in operations on the nervous system, the musculoskeletal system, the nose, mouth, and pharynx system and the female genital organs system : the top of daily medicine cost median emerged on the day of operations ; the median of daily medicine cost was low in the period after operation, and the lowest in the period before operation. the median line of daily medicine cost of operations on the digestive system and the integumentary system keeped at a high level in the period of 1 - 6 days after operations

    手術病人日藥費隨住院時間的變化規律按icd - 9 - cm類目表的15個統大類(解剖學分類)將住院手術病人分為15組,分析了各統手術病人住院期間日藥品費用的變化規律,結果顯示:神經統、肌肉骨骼統、鼻口咽統和女性生殖統手術的日藥費中位線圖具有相似的變化規律:手術病人住院期間的日藥費碩士學位論文中位位於手術當日,且手術當日的日藥費變異最大;術后住院日的日藥費中位明顯降低;術前住院日的日藥費中位很低;消化統和體被統手術在手術當日及術后1 6天內的日藥費中位維持在較高的水平。
  15. In addition, effects of several factors such as local site conditions, focal mechanism, epicentral distance and seismic magnitude on these parameters are discussed, and several significative results and conclusions are obtained. in all records there are about 1 / 3 vertical ground motion ’ s peak acceleration bigger than 2 / 3 of the corresponding horizontal one, so the action of vertical ground motion should not to be underestimated. vertical design response spectrum equals that the horizontal design response spectra times 65 % is probably unsafe when period is short, and suggest adopting different coefficients when at different periods

    本文基於對大量歐洲強震記錄的研究,分析了地震動豎向與水平向分量在加速度、反應譜、頻譜周期等參方面的差異,以及這些參與場地、震源機制、震級和震中距的關,得到了以下有意義的結果和結論:在本文分析的地震記錄中大約1 / 3的記錄加速度比大於2 / 3 ,豎向地震動分量的作用不可低估;在短周期,豎向地震動影響的最大僅取為水平向地震動影響最大的65 %是偏於不安全的,可以考慮按周期分段採用不同的折減;我國現行抗震規范中設計反應譜特徵周期的取偏低,可能是偏於不安全的;豎向與水平向地震動分量卓越周期的比在0 . 7 - 0 . 9之間,豎向設計反應譜的特徵周期應有單獨規定。
  16. According to the study of bass equation, it described the distribution features of incubation time, studied the relations between diffusion rate and the coefficient of innovation and imitation, and the time to peak sales and the point of inflection of diffusion function and the maximum diffusion rate

    通過對bass方程的分析,描述了技術創新擴散的生長曲線方程,探討了技術創新擴散率同創新和模仿的關以及銷售的到達時間和最大擴散率等醞釀期的擴散特性。
  17. In order to investigate the influence of characteristics parameters on detonation wave in a two - phase pulse detonation engine model. the peak detonation pressures and average velocities of two - phase pulsed detonation wave produced by pde model using gasoline as fuel and air as oxidizer under various ignition frequencies and various mixture ratios are measured systematically, and the relations influencing them are analyzed

    為了探索氣-液兩相脈沖爆震發動機模型內特徵參對產生爆震波的影響規律,統地測試了以汽油為燃料、以空氣為氧化劑的氣-液兩相脈沖爆震發動機模型在不同點火頻率及不同余氣下爆震波的壓力以及平均爆震波速,並對其變化進行了分析。
  18. Sound system equipment - peak programme level meters - guide for digital audio level meter

    音響統設備.音量電平表.字音頻電平表指南
  19. The equation among peak factor, quality factor, switch initial angel is concluded. on the basis of the equation, peak factor curve has been programmed. the rms value, peak value and switch initial angel can be shown in the screen of computer

    本文推導峰值系數與品質因和合閘初相角的函式,依此編制峰值系數曲線程序,利用對品質因和合閘初相角的控制可使每個繞組都受到規定的作用。
  20. Switch initial angel can be corrected automatically to make the peak value in each winding comply with requirements. this program has been applied for short - circuit test on all kinds of transformers

    利用本文中的峰值系數曲線程序可以使短路試驗時施加的電流更加準確,該程序適用於各類變壓器的短路試驗。
分享友人