巖洞計劃研究 的英文怎麼說

中文拼音 [yándònghuàyánjiū]
巖洞計劃研究 英文
cavern project study
  • : 名詞1. (巖石) rock 2. (巖峰) cliff; crag
  • : Ⅰ名詞(物體上穿通的或凹入較深的部分; 窟窿; 洞穴) hole; cavity Ⅱ形容詞(深遠; 透徹) profound; thorough; clear
  • : Ⅰ動詞1 (計算) count; compute; calculate; number 2 (設想; 打算) plan; plot Ⅱ名詞1 (測量或計算...
  • : 劃動詞1 (撥水前進) paddle; row 2 (合算) be to one s profit; pay 3 (用尖銳的東西在別的東西上...
  • : 研同 「硯」
  • : Ⅰ動詞(仔細推求; 追查) study carefully; go into; investigate Ⅱ副詞[書面語] (到底; 究竟) actually; really; after all
  • 計劃 : 1 (工作、行動以前預先擬定的內容和步驟) plan; project; programme; device; devisal; design 2 (做...
  • 研究 : 1. (探求) study; research 2. (考慮或商討) consider; discuss; deliberate
  1. Reliability assessment of xi - luo - du underground water - power plant : the results have been used by the cheng - du surveying, design and research institute for the preliminary design ; ( 2 ) the stress and strain analysis for the xiao - guan - zi sluice and its foundation : the report has been applied for the reinforcement of the foundation ; ( 3 ) the thermal control procedure for the no. 7 - 14 power plant dam segments of the three gorge project : the research report provides the effective and efficient methods for the controlling of the temperature field in the mass concrete structure ; ( 4 ) the software system development for the long - term monitoring for dikes : the software can automatically give the results of the seepage field and the probability of soil piping of dikes and underground ; ( 5 ) reliability assessment of xiang - jia - ba underground water - power plant : the results have been used by the zhong - nan surveying, design and research institute for the preliminary design ; ( 6 ) fatigue reliability estimation of shipping berthing pillar : the results give the optimized design scheme and prediction of the structural age ; ( 7 ) 3 - d static and dynamic stochastic finite element analysis for the strength, stability and thermal control problem for xi - luo - du project

    溪洛渡水電站超大型地下室群圍穩定的安全可靠性分析:被成都勘測設院應用於比選報告及可行性論證中; ( 2 )小關子水電站攔河閘壩及地基的應力應變分析:被成都勘測設院應用於地基加固處理方案; ( 3 )三峽廠房7 # - 14 #壩段溫控並縫措施:為廠房壩段並縫方案的可行性提供了依據; ( 4 )堤防工程體系的長期監控預報預警決策系統開發:為監控、預測預報堤防滲漏管涌破壞提供分析軟體; ( 5 )向家壩地下室群圍穩定的安全可靠性分析:被中南勘測設院應用於初步設方案中; ( 6 )靠船墩的疲勞可靠度:為廣東航運規院的靠船墩優化設和加固提供依據; ( 7 )溪洛渡高拱壩壩體壩基(壩肩)強度和穩定的三維靜動力隨機有限元分析及可靠度算:為溪洛渡重大工程壩體的靜動力安全穩定性及溫控方案提供依據。
  2. Cavern project study

    巖洞計劃研究
分享友人