布置方案 的英文怎麼說

中文拼音 [zhìfāngàn]
布置方案 英文
layout
  • : 動詞1. (擱; 放) place; put; lay 2. (設立; 布置) set up; establish; arrange; fix up 3. (購置) buy; purchase
  • : Ⅰ名詞1 (方形; 方體) square 2 [數學] (乘方) involution; power 3 (方向) direction 4 (方面) ...
  • : 名詞1 (長桌) table; desk 2 (案件) case; law [legal] case 3 (案卷; 記錄)record; file 4 (提...
  • 方案 : scheme; plan; programme; project; proposal; suggestion; formula; scenario; outline
  1. Study on refrigerant circuitry design for condensers

    冷凝器流程布置方案的研究與探討
  2. By the scale of 1 : 35 flood - relief model test, combined the structures built and the pump entrance will be built of baishan dam, to decide the overall arrangement of the water cushion

    通過1 : 35比尺的整體泄洪模型試驗,結合白山已建的建築物及籌建的白山大泵進水口,選定水墊塘的總體布置方案
  3. By optimisation of plan, the writer recommends a engineering arrangement plan of water - saving reform, a old channel system reform plan, in addition irrigation area fitting and water - saving in field plan

    提出了灌區節水改造工程的建設規模和節水改造技術。通過優化,推薦了節水改造工程布置方案、老灌區渠系改造、灌區配套與田間節水工程
  4. By discussing how to raise the efficiency of change between island - style junctions and in light of the ground blocks and traffic, the author suggests that the layout of metro stations shall be based on the cad three - dimensional model

    摘要探討如何提高地鐵島式車站之間「十字」換乘能力;結合地面建築的交通安排法,運用cad三維建模,提出了布置方案
  5. Analysis and discussion on layout scheme of prestressed bars for transfer structure with large - span laminated open - web truss

    對大跨度疊層空腹桁架轉換結構預應力筋布置方案的分析與討論
  6. ( 4 ) according to the principle of " repair as the old ", the schemes of foundation strengthening, the schemes of the body structure, the schemes of the shear wall strengthening, the schemes of the floor strengthening, the schemes of the brace layout, the schemes of the switch floor construction and special strengthening scheme such as carbon fiber, the wall steel wire grid strengthening are achieved in this paper

    按照「修舊如舊」的原則實現了照舊色做舊,使新舊構件的色澤差別諧調。依據上述原則,論文實現了基礎加固施工,主體結構加固施工、剪力墻加固施工、樓板拆除支撐和砼施工、支撐布置方案、高層主體結構轉換層施工、木屋蓋拆除以及特殊加固工程施工技術如粘鋼加固、碳纖維加固、墻面鋼絲網加固等。
  7. However, the conventional method to keep the stability can be achieved only by improving the tranquility condition of harbor with the high cost. the range of berth layout plan is limited by the conventional method, and full factors are not involved in optimum to eliminate the integrated predominance of the recommended scheme

    船舶的穩性常規是通過改善港內泊穩來滿足,這種法往往造成過高的工程造價並限制了泊位平面布置方案范圍,使的優化比選過程不能容納全面的比選因素,使推薦難以具備綜合優勢。
  8. According to thermal state similitude model experiment of the langya mountain hydropower station, we adopt different velocity of air ventilation and exclude air proportion of upriver and downriver, this paper contrast the air distribution of the dynamo floor on each method, and educe the best projects of arch crest supply air that adapt to langya mountain hydropower station ’ s dynamo floor : g = 17. 4 10 ~ 4m ~ 3 / h, 22 vents, d = 600mm, the scale of volume 1 : 3, t0 = 16. 9. it ’ s also thought that improved any side of volume can reduce its temperature. when study on the air supply of langya mountain hydropower station ’ s underground dynamo floor by cfd software, it proved that cfd software is correct when compare with model experiment. when arrange the number of 5 kinds of vents, it concluded that the number of vents 14 to 22, it can ’ t change velocity, in 36 to 40 can lead to reduction of velocity. when vent in 14 to 36, the parameter kt doesn ’ t change, when the number is as large as 36, kt reduces

    在此基礎上,模擬了5種風口布置方案和送風量的改變對發電機層溫度場和速度場的影響,獲得了些可供參考的結論:在風量和送風速度不變的條件下,風口個數在( 14 ~ 22 )小范圍變化時,工作區平均風速基本不變,大幅度增加風口個數( 36 ~ 44 )就會導致工作區平均風速的降低,風口數在14 ~ 36之間對工作區的溫度不均勻系數影響不大,當風口數> 36時,溫度不均勻系數隨著風口數的增多而變小,速度不均勻系數一直隨著風口數的增加而減少;在風口和尺寸不變的情況下,送風量變化時,工作區平均溫度隨送風量增大而降低,平均溫度的降低量逐漸趨于減少,能量利用系數先是隨著送風量的增加而增大,后隨送風量增加而減少。
  9. On the illustration of mining in deeply inclined coal seam under buildings in muchengjian colliery in beijing, the confirmation method of coal pillar dimension and the united layout of pseudo - dip strip pillar and boundary pillar were put forward to provide theory foundation for the control of surface movement and subsidence in the mining of deeply inclined coal seam

    摘要以北京木城澗煤礦大臺井建築物下壓煤開采為例,提出了急傾斜煤層開采條件下條帶煤柱尺寸的確定法和傾斜條帶煤柱與邊界煤柱相結合的條帶布置方案,為急傾斜煤層開采地表沉陷控制提供了理論依據。
  10. To reasonably plan out the scheme for the sewage discharge outlets of changshu fluorine chemical industry project, the article makes an ana lysis on the water environmental features of changshu section of the yangtze riv e, develops a plan two - dimensional model of coupled water flow - quality for its co mplicated underwater topography and stream flow - field. the model is relatively ac curate and practicable to predict the impact of scheme on water quality. varied s chemes have been compared and demonstrated from multiple angles, such as flow fie ld, impact assessment of water quality, technique and economy. the scheme of sewage discharge outlets away from the shore is recommended. the article provides a sci entific basis for the engineering design and envirommental management of the pro ject

    為合理確定常熟氟化工項目排污口布置方案,本文在分析長江常熱段水環境特徵的基礎上,針對其復雜的水下地形和水流流場,建立了較為準確和實用的平面二維水流水質耦合數學模型,預測計算了三套污水對重點保護水域影響程度和范圍,並從水流流場、水質影響評價、技術經濟多角度對進行了比較論證,最終推薦污水江中排放的,為項目的工程設計和環境管理提供了科學依據。
  11. To achieve the best irrigation system, the es can try several pipe planning s chemes for each irrigation system, and select the best one as the final scheme, thus the optimization is accomplished

    另外,為獲得最優的灌溉系統,本專家系統對每個灌溉系統均考慮了多種管道布置方案,可進行多種的優選,實現了優中選優。
  12. Abstract : for high arch dams in valleys with the characteristics of high water head, large discharge and large power, the problems of energy dissipation and scour prevention are serious. based on scientific studies, new comprehensive measures are proposed, including dispersion of discharge to waken wallop of the current, and reinforcement of riverbed to enhance the erosion - resistance. the measures can be used to solve the problem of energy dissipation properly. a typical layout scheme has been proposed in which slotted bucket with diversion teeth, double deck with pores, and cushion pool are considered practice has proved that the scheme is reliable and the effect of energy dissipation is obvious

    文摘:高拱壩泄洪消能的特點是壩高落差大,流量大,功率大,位於河谷狹窄地區,泄洪消能與防沖問題突出.經科學研究,採用「分散泄洪,削弱水流沖擊力,加固河床,增強河道抗沖能力」的綜合治理措施,較好地解決泄洪消能問題.提出了表孔大差動坎加分流齒、雙層多孔、水流撞擊、下設水墊塘聯合消能的典型布置方案,經實踐證明,可靠,消能效果好
  13. Based on the reliability, economy and feasibility of the control measures, a relatively rational reinforced scheme is selected, which can provide valuable suggestions for engineering application

    從控制措施的可靠性、經濟性角度出發,建議選擇相對合理的跨縫鋼筋布置方案,為橫縫配筋措施的初步設計和工程應用提供了有價值的參考。
  14. In chapter 2, by defining some concepts, such as constraint unit, constraint aggregate, constraint relation, constraint method, constraint chain, constraint degree and associate constraint sub _ aggregate etc. the basic constraint factors that affect the complex pipeline system packing are fully analyzed in the first. in the following, a mathematical modelling method used for complex pipeline system " optimization packing design is brought forth based on the optimization target decomposing, then a mode of generalized proposal field of the complex pipeline system packing design is constructed. finally, a variant genetic algorithm for the solution of the mode mentioned above is derived

    第二章,通過定義約束元、約束集、約束關系、約束法、約束鏈、約束度、關聯約束子集等概念,對影響復雜管線系統規劃的基本約束因素進行了較為全面、系統的分析;探討了基於目標分解的復雜管線系統優化問題的數學描述法,建立了面向復雜管線系統的廣義布置方案場模型,並在此基礎上設計了求解該模型的變異遺傳演算法。
  15. The buyer shall send persons to seller ' s site for confirmation of general design, equipment options and outsourcing parts

    派技術人員赴賣參加總布置方案、設備選擇的確定及主要外購總成的技術確認。
  16. A research scheme is carried out and cfrc bars are made to investigate the measurement, including loading method, electrode layout, electrical resistivity testing methods, signal collection and processing etc. the monitoring system of vehicle - speed, based on cfrc, is innovative obviously

    最後,提出了交通測速系統的工作原理,制定了實驗,製作實驗構件,進行了車速測量的模擬試驗。特別討論了加載、電極布置方案,電阻測試法,信號採集和處理的法等。
  17. The optimal layout scheme of the shop facilities

    車間設施優化布置方案
  18. It has practical value to the parameter selections of fans in series and to the sureness of the scheme in the series arrangement

    分析了單機性能、理論疊加性能和實際總排氣性能間的關系,對串聯風機的參數選擇和串聯布置方案確定具有參考價值。
  19. By using fuzzy comprehensive appraisal, first to come up with a general layout scenario, and design the emb mechanical actuator in term of the scenario and related technical index, then according the parts parameter, electromechanical system model and dynamic analysis is built and made between emb mechanical actuator and actuator motor

    本文根據國內外有關的emb參考資料和相關機械的機構,提出了一類基本的新型emb執行機構總體布置方案,通過變元法和模糊綜合評判從幾種中得到最優的總體布置方案。然後根據總體布置方案和相關技術指標設計出emb機械執行機構。
  20. Therefore, drawbead is employed together with bhf to control the drawing process, and several typical layouts of drawbead are analyzed and compared via fea ( finite element analysis ), with the most effective one then being applied to stamping experiments

    因此,文中採用拉延筋和壓邊力來共同控制拉延成形,並通過有限元分析比較了幾種典型的拉延筋布置方案,選擇其中最有效的一種進行試沖試驗。
分享友人