庫尾 的英文怎麼說

中文拼音 [wěi]
庫尾 英文
head of reservoir
  1. Alice cooper, america ' s singing ghoul, was ending his act

    美國的恐怖歌星艾利絲?珀的表演正接近聲。
  2. Environment risk analysis of dam debacle in phosphorite tailing pond in rainstorm

    磷礦暴雨潰壩環境風險分析
  3. That will be worth seeing, faith. as they turned into berkeley street a streetorgan near the basin sent over and after them a rollicking rattling song of the halls

    當他們拐進伯克利街時,水附近一架手搖風琴迎面送來一陣喧鬧快活的游藝場音樂,走過去后,樂聲依然隨著。
  4. Sidewinder, i ' m approaching the vault

    蛇,我馬上就到金
  5. Intermediate frequency furnace ? continuous casting billets ? heated by heating furnace ? rough rolling ? head and tail end cutting ? intermediate rolling ? head and tail cutting ? finish rolling ? water cooling treatment ? multiple - length cutting and dividing ? cooling on the cooling bed ? cutting - to - length by cold shear ? collecting and bundling ? to warehouse

    中頻熔爐連續的鑄件鋼坯重復加熱的熔爐粗軋頂端和端切斷中間壓軋頂端和端切斷完成壓軋水冷處理多功能的長度切割和分段在冷床上冷卻冷卻后冷剪長度聚集捆包運到倉
  6. At the coupole, downstairs, he finds her sitting in front of a cocktail with a dreamy, trancelike expression on her face. she smiles when she sees him

    波勒飯店一樓,他看到公主坐在一杯雞酒前,臉上一副想入非非、恍恍餾熄的表情。看到他,她微笑了。
  7. I identified that bird tentatively as sakhalin on the basis of it having a rather green rump and tail and it also having rather raspberry - pink ( bubble - gum ) legs

    我實驗性地辨識這只鳥為頁島柳鶯,是根據?還算綠的腰部和羽,而且?也有懸勾子般粉紅色(像泡泡糖)的腳。
  8. Abstract : the control methods of tailing dam of wulongquan mine were introduced, some new techniques as recovery and utilization of the wash - or e tailings of limestones and dolomites, and draining seepage and solidification technology by radial well to reinforce the main dam were described in detail

    文摘:介紹了烏龍泉礦治理的具體方法,詳細地闡述了回收利用石灰石、白雲石洗礦礦的回收利用和採用輻射井排滲固結技術加固主壩等新工藝。
  9. To all of them, from the marshal to the lowest soldier, this place was not vosdvizhenka, mohova, kutaf, and the troitsky gates ; it was a new battlefield, likely to be the scene of a bloody conflict

    對他們全體官兵,從元帥到最末的士兵來說,這個地方不是弗茲德維仁卡街,莫霍夫街,塔菲耶夫街或特羅伊茨門,而是一處新的戰場,可能要浴血奮戰的場地。
  10. In this paper, regarding the analysis of stability factors of majiatian tailings fill dam, namely regional geologic structure, rock - soil body of dam foundation, poor geology phenomenon, leach consolidation and chemical consolidation of tailings, seepage water of dam body and king - size flood water of majiatian tailings reservoir, a preliminary demonstration on probability of earthquake liquefaction and seepage failure of dam bodys tailings sand soil, of the dam body failure resulted from abutment landslide and of the flood water overflowing crest, as well as on the contribution of leach consolidation and chemical consolidation of tailings to the stability of dam body has been performed

    通過對馬家田區域地質構造、區不良地質觀察、礦淋濾固結和化學固結、壩體滲透水和區特大洪水等因素對馬家田礦堆積壩體穩定性影響的分析,初步論證了壩體礦砂土的地震液化、滲透破壞、壩肩滑坡使壩體失穩和洪水漫頂的可能性,以及礦淋濾固結和化學固結作用有助於壩體的穩定性。
  11. In this paper, regarding the analysis of stability factors of majiatian tailings fill dam, namely regional geologic structure, rock - soil body of dam foundation, poor geology phenomenon, leach consolidation and chemical consolidation of tailings, seepage water of dam body and king - size flood water of majiatian tailings reservoir, a preliminary demonstration on probability of earthquake liquefaction and seepage failure of dam body ' s tailings sand soil, of the dam body failure resulted from abutment landslide and of the flood water overflowing crest, as well as on the contribution of leach consolidation and chemical consolidation of tailings to the stability of dam body has been performed

    通過對馬家田區域地質構造、區不良地質觀察、礦淋濾固結和化學固結、壩體滲透水和區特大洪水等因素對馬家田礦堆積壩體穩定性影響的分析,初步論證了壩體礦砂土的地震液化、滲透破壞、壩肩滑坡使壩體失穩和洪水漫頂的可能性,以及礦淋濾固結和化學固結作用有助於壩體的穩定性。
  12. This proof following enterprise already through the authentication, and has set up a file in the dongguan 114 nets industry and commerce enterprise database, inquires the more detailed enterprise material, please dial the dongguan enterprise information desk 96060 ( artificially ) 9686810114 billion ( to be automatic ), this enterprise numbers for 19172

    茲證明東莞市國藥藥業連鎖有限公司石碣豐藥店已通過認證,並已在東莞114網工商企業數據中備案,查詢更詳細的企業資料,請撥東莞企業查詢臺96060 (人工) 9686810114 (自動) ,該企業編號為19172 。
  13. Test research on treating acid mine drainage of tailings reservoir in an iron mine

    某鐵礦酸性廢水處理試驗研究
  14. Evaluation of stability of baizhishan tailing dam

    白雉山的穩定性評價
  15. Application of soft perviious pipe in baizhishans tailings storehouse

    軟式透水管在白雉山中的應用
  16. The water levels is correlated to seismicity. hypocentrum move to the top of reservoir, and form two seismic concentrated place - linmal2o3han and songwan

    蓄水位和地震有著明顯的正相關性,震區由庫尾移向首,並在丹的林茂山和宋灣形成了兩個地震密集區。
  17. If the database is offline and does not start. try to take a tail - log backup. because no transactions can occur at this time, using with norecovery is optional

    如果數據包含要備份的、在記錄間隔期間執行的大容量日誌更改,則僅在所有數據文件都存在且未損壞的情況下,日誌備份才會成功。
  18. The bingling ( si gou xia ) hydropower station is a series of power stations on the yellow river, in order to the expropriation and the emigration be reduced, after studied the relation of water level and flux of the bingling hydropower station on the taping dam location, under the different running circumstances of the liujiaxia reservoir, to located the bingling hydropower station on the head of the liujiaxia reservoir, and keeping the total installation and the generated energy not be changed all made use of the floodwater of the liujiaxia reservoir

    摘要黃河炳靈(寺溝峽)水電站是黃河幹流上的一個梯級電站,為了減少征地移民損失,經對炳靈水電站(塔坪壩址)水斷面在劉家峽水不同運行方式下的水位與流量關系進行分析研究,在總裝機和年發電量基本不變的情況下,充分利用劉家峽水汛限水位,將電站樞紐選址在其電站庫尾內。
  19. A study on sedimentation of alluvial silt in three gorges reservoir head and its treatment

    三峽工程庫尾泥沙淤積與治理研究
  20. The engineering works were extremely difficult as river flow had to be reversed. the dongshen - hong kong water supply scheme therefore necessitated the up - lifting of water in 8 stages with a total elevation of 46 metres. the water was then fed to the yantan reservoir (

    工程1963年展開,經八級提水,將水位提高46米后,注入雁田水,再由庫尾開挖3公里人工渠道,注水至深圳水,再由深圳水直接供應香港。
分享友人