庫特壩 的英文怎麼說

中文拼音 []
庫特壩 英文
kut barrage
  • : Ⅰ形容詞(特殊; 超出一般) particular; special; exceptional; unusual Ⅱ副詞1 (特別) especially; v...
  • : 名詞1 (攔水建築物) dam2 (固堤建築物) dyke; embankment 3 [方言] (沙灘; 沙洲) sandbar; sandba...
  • 庫特 : (ibrabim kutluay)
  1. A brief introduction is given to the treatment of the zeya dam foundation, principles of seepage control and design of the concrete face rockfill dam of the zeya reservoir. as for the excavation of the sand - gravel zones, except the toe slab and its 1 / 9 bottom width down stream, the alluvial layers are excavated to the micro - weathered rocks, while the other sections remain unexcavated. regarding to the treatment of the fracture zones, concrete filling is used for the toe slabs and semi - permeable materials are used for other section. according to the construction characteristics, a filter is placed in the down stream embankment foot. to improve the integrity of the dam foundation and anti - seepage capability consolidation grouting and curtain grouting are adopted. as a result safety, economic benefit, convenience in construction and good performace are achieved

    簡要論述澤雅水面板堆石基處理和防滲的原則及設計要點.趾板基礎和堆石體各區砂礫石基礎開挖,除趾板與其下游1 / 9底寬范圍以及腳挖除沖積層至弱風化(局部微風化)基巖外,其餘部分均予以保留.斷層破碎帶處理,趾板部位採用混凝土塞,其它部位採用半透水料置換,並根據本工程點在下游腳加設了反濾層.為提高基的整體性和防滲性能,對趾板進行了固結和帷幕灌漿.達到了安全、經濟、便於施工的目的,運行情況良好,可為面板堆石的設計和研究提供參考與借鑒
  2. Water environmental properties at the near dam region of the three gorges reservoir in the initial impoundment period

    三峽蓄水初期水區水環境性分析
  3. In this paper, regarding the analysis of stability factors of majiatian tailings fill dam, namely regional geologic structure, rock - soil body of dam foundation, poor geology phenomenon, leach consolidation and chemical consolidation of tailings, seepage water of dam body and king - size flood water of majiatian tailings reservoir, a preliminary demonstration on probability of earthquake liquefaction and seepage failure of dam bodys tailings sand soil, of the dam body failure resulted from abutment landslide and of the flood water overflowing crest, as well as on the contribution of leach consolidation and chemical consolidation of tailings to the stability of dam body has been performed

    通過對馬家田尾礦區域地質構造、區不良地質觀察、尾礦淋濾固結和化學固結、體滲透水和大洪水等因素對馬家田尾礦堆積體穩定性影響的分析,初步論證了體尾礦砂土的地震液化、滲透破壞、肩滑坡使體失穩和洪水漫頂的可能性,以及尾礦淋濾固結和化學固結作用有助於體的穩定性。
  4. In this paper, regarding the analysis of stability factors of majiatian tailings fill dam, namely regional geologic structure, rock - soil body of dam foundation, poor geology phenomenon, leach consolidation and chemical consolidation of tailings, seepage water of dam body and king - size flood water of majiatian tailings reservoir, a preliminary demonstration on probability of earthquake liquefaction and seepage failure of dam body ' s tailings sand soil, of the dam body failure resulted from abutment landslide and of the flood water overflowing crest, as well as on the contribution of leach consolidation and chemical consolidation of tailings to the stability of dam body has been performed

    通過對馬家田尾礦區域地質構造、區不良地質觀察、尾礦淋濾固結和化學固結、體滲透水和大洪水等因素對馬家田尾礦堆積體穩定性影響的分析,初步論證了體尾礦砂土的地震液化、滲透破壞、肩滑坡使體失穩和洪水漫頂的可能性,以及尾礦淋濾固結和化學固結作用有助於體的穩定性。
  5. Experimental study on earth material for heightening of danjiangkou dam

    丹江口水加高工程築材料工程性試驗研究
  6. ( 3 ) the calculations tell us that the enclose tideland for cultivation dyke effect directly flood drainage, engineering safety and efficiency development in reservoir. so the management of reservoir should be strengthened, the spirit of clearing barriers given by superior should be carried out, clearing barriers in reservoir, especially the enclose dam in west river mouth

    ( 3 )從計算的結果可知,由於水區圍堤,直接影響到水的正常行洪、工程的安全及效益的發揮,應加大水的管理力度,貫徹落實上級有關水清障的精神,清除區障礙物,別是西河口的圍
  7. The geological hydrology characteristic of dam region at guanmenzuizi reservoir

    關門咀子水址區域水文地質
  8. The dissertation focus on the main conflict of flow and sediment change, by analyzing the flow and sediment features, and change in rivercourse of typical period in histry, collecting the data of riverbed change. according to the flow and sediment change condition, combining the existed water works, and based on the results of former researches, the study are conducted on the law of flow state change by comparing rivercourse conditions before and after the completion of sanmenxia project, which may provide some idea for flow state change when xiaolangdi project completed and put into operation and some basic clue for the prediction of variation trend of river section from tiexie to shendi, from shendi to tieqiao near zhengzhou, from tieqiao near zhengzhou to dongbatou, from dongbatou to gaocun and so on in the year 2010 and the period 2010 to 2020. the result may provide some reference for flood control of these wangdering river sections, and some guidelines for planning of water projects and arrangement of project sequence

    本課題緊緊抓住小浪底水運用后水沙變化這一主要矛盾,通過分析研究以往典型時期的水沙點和河道演變點,收集分析河床邊界條件變化資料,小浪底水運用后水沙資料變化,結合現有河道整治工程建設情況,總結前人的研究成果,重點研究三門峽水運用後下遊河道河勢變化的規律和點,探索小浪底水運用後下遊河勢變化情況,分析預測游蕩性河道鐵謝至神堤、神堤至鄭州鐵橋、鄭州鐵橋至東頭、東頭至高村等各個河段在2010年, 2010年至2020年期間的河勢變化趨勢,為分析游蕩性河段的防洪形勢,指導河道整治工程建設的規劃和工程安排提供決策參考和依據。
  9. By integrating with the engineering practice of curtain grouting on the right abutment of houhe reservoir and on the basis of field tests, researches were conducted on the establishment of grouting parameters and gins, mix proportion of stable mortar as well as finishing standard of different gins under certain geological condition. and after checking the grouting effects, comparison was made between gin grouting and the traditional grouting technique

    本課題結合后河水肩帷幕灌漿的工程實踐,通過現場試驗研究,就gin法灌漿在定地質條件下灌漿參數及gin值的確定,穩定漿液的配方,不同gin值的灌漿結束標準等進行了試驗研究,並在對其灌漿效果加以檢查的基礎上,與傳統灌漿工藝進行了對比分析。
  10. After the comprehensive research about watersheds runoff characteristic, artificial regulation condition and dam groundwater reservoir technology, 5 surface water works, 7 groundwater reservoir works and 13 potential groundwater reservoir zones have been proposed

    結合流域徑流資源、區域人工控制點分析,及有地下水技術研究,篩選設計出5項地表水利工程、 7項地下水工程及13處地下水潛力區。
  11. Inview of the leakage of some mine efflent retention dams in china, the characteristics of the engineering constructions, the causes for the leakage and the leakage flow route are analyzed and engineering control measures are suggested in combination with the engineering practice

    針對我國有關礦山截污滲漏的情況,分析研究了工程構築物的點、滲漏原因及滲流途徑,結合工程實際,提出了工程治理對策。
  12. Abstract : inview of the leakage of some mine efflent retention dams in china, the characteristics of the engineering constructions, the causes for the leakage and the leakage flow route are analyzed and engineering control measures are suggested in combination with the engineering practice

    文摘:針對我國有關礦山截污滲漏的情況,分析研究了工程構築物的點、滲漏原因及滲流途徑,結合工程實際,提出了工程治理對策。
  13. The paper puts forward the structure of debris - retaining works system, layout consideration and construction principle for the coarse sand concentrated coming area, time sequence of the works construction of " large - scale first and small - scale second ", " downstream first and upper stream second ", and " carrying out section by section " and some problems demanding prompt solution according to the present facts and ; to speed up the preparation of a large - scale debris - retaining reservoir ; to draft the standards for a large - scale debris - retaining reservoir as quick as possible and ; lay emphasis on the schedule of various projects and correct understanding and fully playing the function of key dams through the analysis on achievements and problems of debris - retaining works building and combining with the gully characteristics of coarse sand concentrated coming area

    摘要通過對粗泥沙集中來源區攔沙工程建設成就與問題的分析,結合粗泥沙集中來源區溝道徵,提出了粗泥沙集中來源區攔沙工程體系的構成、布局思路、建設原則,提出了「先大后小」 、 「先下後上」和「分段實施」的攔沙工程建設時序,並針對當前工作實際,提出了亟待解決的幾個問題:加快大型攔泥前期工作步伐、盡快制定大型攔泥標準、重視各類工程實施進度以及正確理解和執行規范、充分發揮骨幹的作用等。
  14. 5 ) to solve the uncertain modeling problem about hydraulic buildings, a new modeling method named aggregation modeling based on graph object technique is put forward. as a result, the graph model of solid gravity dam is designed. the graph object of water _ proof dam section taken as an example, the design and implement of self defined graph object is discussed

    5 )根據水工建築物不定型建模的點,提出一種基於圖形對象技術的聚合建模方法,詳細討論了聚合建模法的基本原理;設計了實體重力的圖形對象模型,並以擋水段圖形對象的設計為例,研究了自定義圖形對象的設計和實現;基於objectarx的通知? ?反應機制,採用數據反應器和對象反應器,建立了圖形對象的互動操作機制;以擋水段斷面優化設計為例,研究了圖形對象和分析、計算功能的集成方案。
  15. ( 2 ) carry out a comprehensive research on their technological characteristics and suitabi 1 ity in dealing wi th the xiacouba reservoir project, the details are as follows : cd in connection with grievous seepage problem and slope stability problem of the foundation overburden and the dam itself, there are two positive plans for dealing the seepage and three for upstream slope stabi 1 ity

    具體內容如下:針對下口體、基覆蓋層滲漏嚴重,上游坡穩定性差,多次滑坡點,大防滲處理擬定了二種處理方案,上游坡加固擬定了三種處理方案,從技術可靠、工期短、造價省、施工條件等方面進行評價。
  16. The design of the downstream water supply during the construction of yunlong reservoir is presented, in which the problem from the downstream water supply during the construction period of the flood discharge tunnel, the main dam, the initial impoundment of the reservoir and the locking - up of the diversion tunnel is solved satisfactorily with simple construction method, and then the water supply is guaranteed with better social and economic benefit

    摘要著重介紹雲龍水施工期下游供水設計,根據工程點,較好地解決泄洪導流隧洞施工期、大施工期、水蓄水、導流隧洞封堵施工期等下游供水問題,施工方法簡單,確保了下游供水,取得了較好的社會和經濟效益。
  17. In view of the seepage hazards existent in the homogeneous soil dam in landong reservoir and on the basis of physical property of the media and geophysical characteristics of the study area, the authors reasonably selected such geophysical techniques as high - density resistivity, ground penetrating radar, transient rayleigh wave and spontaneous polarization to make integrated exploration and find out the seepage path of water sources, thus providing grounds for evaluating stability of the dam body and designing the reinforcement plan

    摘要針對藍洞水均質大出現散滲等病險,根據區內各介質物理性質及地球物理徵,合理選擇了高密度電阻率、探地雷達、瞬態瑞雷波和自然電場4種物探方法進行綜合勘查,查明病險的水源來向,為評估體的穩定性和加固處理設計提供依據。
  18. Abstract : in view of the seepage hazards existent in the homogeneous soil dam in landong reservoir and on the basis of physical property of the media and geophysical characteristics of the study area, the authors reasonably selected such geophysical techniques as high - density resistivity, ground penetrating radar, transient rayleigh wave and spontaneous polarization to make integrated exploration and find out the seepage path of water sources, thus providing grounds for evaluating stability of the dam body and designing the reinforcement plan

    文摘:針對藍洞水均質大出現散滲等病險,根據區內各介質物理性質及地球物理徵,合理選擇了高密度電阻率、探地雷達、瞬態瑞雷波和自然電場4種物探方法進行綜合勘查,查明病險的水源來向,為評估體的穩定性和加固處理設計提供依據。
  19. Based on research on management modes of deposited mud and sand in cohorts of storerooms and dams in the loess plateau of shannxi province, the authors point out a way how to resolve mud and sand deposit in cohorts of storerooms and dams in terms of landform features and the causes of soil and water loss

    摘要在對陜北黃土高原群泥沙淤積治理模式研究的基礎上,從該區地貌徵、水土流失成因出發,提出了解決群泥沙淤積的途徑。
  20. Basing on the abundant statistic and testing data of xiluodu hydroelectric project, the spatial characters of rock mass structure and quality in dam foundation are detailed studied. some progress is made in the following aspects : quantification of rock mass structure indexes, quantized quality classification of dam foundation rock mass, establishment of spatial database of rock mass quality indices and the diagrammatic representation of rock mass quality

    本文結合溪洛渡水電工程,以豐富的統計、測試資料為基礎,以巖體結構為主線,深入研究了基巖體結構、巖體質量的空間變化徵,在巖體結構分類指標定量化、基巖體質量量化分級及巖體質量指標空間數據的建立、巖體質量圖形展示技術方面取得了一定的進展。
分享友人