廠用電系統 的英文怎麼說

中文拼音 [chǎngyòngdiàntǒng]
廠用電系統 英文
station service electrical system
  • : 廠同「庵」 (多用於人名)
  • : Ⅰ動詞1 (使用) use; employ; apply 2 (多用於否定: 需要) need 3 (敬辭: 吃; 喝) eat; drink Ⅱ名...
  • : Ⅰ名詞1 (有電荷存在和電荷變化的現象) electricity 2 (電報) telegram; cable Ⅱ動詞1 (觸電) give...
  • : 系動詞(打結; 扣) tie; fasten; do up; button up
  • : Ⅰ名詞1 (事物間連續的關系) interconnected system 2 (衣服等的筒狀部分) any tube shaped part of ...
  • 用電 : electricity utilization
  • 系統 : 1. (按一定關系組成的同類事物) system 2. (有條理的;有系統的) systematic
  1. On this basic, it come out rs485, bitbus application casus to distribution watch system. this system make up real time watch system and data manage net system by bitbus communication to complete detract check and focus show function of high low electric power parameter. it take on task of background communication and proscenium data manage

    該方案應bitbus現場總線構成一個完整的實時監控和數據管理網路,完成高、低壓配力參數的分散檢測和集中顯示等功能,上位機同時承擔后臺通訊和前臺數據管理任務,前後臺并行工作,該方案在某汽車製造中得到了較好的應
  2. Successful application of ultra - high molecular polyphone board in the quick dirt - removing mixer at yimin power plant and the application prospect in the dirt - removing system of thermal power plant were introduced

    摘要介紹了超高分子量聚乙烯板在伊敏除灰攪拌機上的應經驗,並探討它在火力發除灰中的應前景。
  3. Applicable criteria for digital computers in safety systems of nuclear power plants

    安全中數字計算機的適準則
  4. This paper outlines operation, check and repair of the bucket stacker / reclaimer of a coal conveying system used at anqing petrochemical coal - fired power station, describes damage condition of the slewing ring, discusses the causes and details how to replace the damaged slewing ring by synchronously jacking

    摘要介紹了安慶石化熱輸煤斗輪堆取料機的使檢修和回轉大軸承的損壞,分析了損壞原因,重點介紹了「頂升法」更換回轉大軸承的技術。
  5. On the deep foundation that studies and understands thermaldynamic system of steam power plant, this text is to compare analytic theories and computation method constantly used at present on the economy of thermaldynamic system of steam power plant, calculate the influences on thermal economy with theory of equivalent enthalpy drop when high pressure heater is into stoppage, prove influences degree on thermal economy when the composition of heater stoppage is diffrent, define regenerator rate and offer theoretical direction for heater stoppage

    本文在對火力發熱力深入學習、掌握的基礎上,對目前幾種常的火力發熱力經濟性分析理論和計算方法進行了比較,以等效焓降理論對高壓加熱器停運時熱經濟性的影響進行了計算,說明了高壓加熱器各種停運組合對熱經濟性的影響程度;提出了加熱器回熱率概念,從而為高壓加熱器切除提供了理論指導。
  6. Development of large coal mines, high - efficiency production technical equipment of coal, development and utilization of coal gas resources, high - efficiency and low - pollution large coa1 generating system, power plant of urban heat and power combined production, fine processing of coal, development of renewable energy resources

    大型煤田開發,煤炭高效生產技術裝備,煤氣資源開發利,高效低污染大型燃煤發,城市熱聯產,煤炭精深加工,可再生能源開發等。
  7. Fmc closed air insulation wire tank is a new products designed and developed by us and its techniques and craft has reached the requirements of high graded products in the 1990s. it s suitable for the following conditions : four - wrie system or five - wire system,

    Fmc空氣絕緣型封閉母線槽是我公司自行研究開發的新產品,生產技術及製造工藝要求達到九十年代國內先進水平的母線槽器產品,適於交流三相四線制三相五線制,頻率50 60hz ,額定工作壓至660v ,額定工作流250 - 5000a的供配,主要於現代化房車間和高層建築等場所。
  8. Application of anti - corrosion steel in dust disposing system of inshore power plant

    耐蝕材料在濱海排灰中的應
  9. This paper analyses current situation of chp and situation of development, use evaluating energy utilization - - based on electricity comparing with state calculated method - - based on heat, calculates the operating data of baotou second thermal power plant heat supply system , extends the study of heat supply performance to heat net and heat consumer, synthetically analyses heat load characteristic 、 pipe net property and heat supply distance witch effect heat supply cost. the paper studies the thermal power performance of thermal power plant total energy system, discuss heat supply cost which effect the development of chp

    本文對熱聯產的現狀及發展情況進行分析,採能源利性能評價指標體及其評價指標? ?量法與國家目前採的法定計量方法? ?熱量法進行比較,通過對內蒙古包頭第二熱供熱熱源及供熱熱網的熱聯產運行數據進行分析計算,將供熱過程的熱力性能研究延伸至熱網和熱戶,分析戶終端的能源利情況,針對內蒙古地區主力機組和地區條件,綜合分析了熱負荷特性、管網性能及供熱距離對供熱成本的影響,研究了熱總能的熱力性能,對困擾熱聯產的供熱成本進行了探討。
  10. Fire protection, and surveillabce works as follows : electrical : 22. 8kv ; 27, 800kva ; three loading centers located in the power house, factory, and office building ; generator 2 800kw

    氣: 22 . 8kv供設備容量三處負載及配中心分佈於動力室與房發機容量2800kw ,供緊急負載使本配處使數字式驛及表,符臺現代化之力監控新潮流。
  11. A series of products made by skysea company are widely applied to industries such as severely - polluted sewage discharge in factories and businesses, sewage discharge of residential areas, civil air - defense drainage station, hospitals, farm irrigation, printing and dyeing, equipment cooling, food, environmental protection, chemical engineering, petroleum, pharmacy, mining, paper making, power plant, coal and oil processing, steel, shipbuilding, ceramics, leather manufacture, drainage system of city sewage disposal, municipal engineering and construction field. they have got a favorable reception from clients

    天海列產品被廣泛應於工商業嚴重污染廢水排放、住宅區的污水排放、人防排水站、醫院、農田灌溉、印染、設備冷卻、食品、環保、化工、石油、制藥、采礦、造紙、、污水排放、煤油加工工業、鋼鐵工業、造船工業、陶瓷工業、製革工業,以及城市污水處理排水,市政工程,建築工地等行業深受客戶好評。
  12. Abstract : this paper researches the working characters of coveying coal system in thermal power plant, and introduces the method using super high molecular weight polylene substitute for coveying system ' s sheathing board

    文摘:研究火輸煤的工作特性,介紹使超高分子量聚乙烯材料替代該中耐磨襯板的方法。
  13. The fault samples with the signal of zero or one and the model of bp neural network are established, in accordance with nine faults of pulverizing system for chongqing power plant. during the course of the samples compilation, produce rule 、 neural network representation etc are synthesized to organize and express the fault sample of pulverizing system. before being putted into the database, the sample data is disposed to ensure sample data integrity and no redundancy

    本文針對重慶發制粉九種故障建立了以0 、 1為徵兆量的故障樣本和相應的bp神經網路模型,且在制粉故障及其相關故障樣本編輯過程中,應了神經網路產生規則式、框架式等知識表達方法,有效的表達制粉故障及其相關故障診斷知識,並且為保證數據的完整性,減少數據冗餘,對數據庫進行了規范化處理,簡化了數據結構和避免了數據沖突。
  14. From a power perspective, emerson is a leading supplier of control systems for fossil, nuclear and alternative energy power generating facilities, with control systems installed in plants representing roughly 300, 000 mw of generating capacity, which is equivalent to 40 percent of average peak demand in the united states

    力的角度來看,艾默生是原油、核能和可轉化能源發控制的領先供應商,其安裝在的控制佔了大約30萬兆瓦的發量,相當於美國平均高峰需求的40 % 。
  15. The dc distributor shelf play a important role in transformer substation, power plant, big and middle plants etc. it supply mainly to the controled, protected and communicate equipment, automechanism, manipulaor and adjusted machine. the same time it may as accident lighting power supply, so its performance and reliability affect directly the running safely of whole power supplying system

    直流源屏作為供源在變站、發、大中型礦企業等供中佔有很重要的地位,主要於向控制、保護、通信設備、自動裝置操作機械和調節機械的傳動機構供,同時還可以作為獨立的事故照明源,所以其性能及可靠性直接影響到整個供的正常安全運行。
  16. Devised fuzzy controller and constituted fuzzy decision - making using fuzzy control rule. this fuzzy control system applied likong 廬 control system in guiyang power plants, the system ' s fuzzy control and the plant ' s primary control system are accordant. it makes the run state of the power plants into more secure 、 steady and economic

    同時,該模糊控制使「力控」組態軟體,並使pcl編程,與順序聯鎖控制相結合,應在貴陽發控制中的,達到該主控制的有機結合,使的整體運行工況更加趨于安全可靠經濟。
  17. For the elevation of the scientification and rationality of the construction organization designment and construction management in the modern construction projects, an computer aided design system of integration of construction schedule and layout drawing has been researched and developed in this paper. with this cad system we can realize the layout of the drawings and the compiling of the construction schedules separately, and also this system can used to exchange the data between the two separate systems, and then they can express each other

    為了提高現代建築工程項目施工組織設計和施工管理的科學性和合理性,本文以建設工程項目為例研究和開發了集成化的施工進度計劃和施工布置的計算機輔助設計,利不僅可以獨立的實現施工布置和施工進度計劃的編制,而且可以利開發的自定義文件進行這兩種的數據交流和表達。
  18. Through the power flow calculation and theoretical analysis for the electric auxiliary system using reactive power compensation, the economics benefit of the power plant was diseussed, and proved the project is feasible

    通過對發廠用電系統加入無功補償后簡單的潮流計算和理論分析,論述了在提高發經濟效益方面的作,證明無功補償方案的可行性。
  19. New neutral point grounding treatment for power station auxilary power supply system

    高壓廠用電系統中性點新型接地方式
  20. Abstract : the estabishing math model technique of simulating stationservice system for 300mw electric power simulation unit and its significance, are described. the simulating object and simulating scope are discussed. the system design, each load calculation and each bus voltage calculation of station service system in realization, control panel design and fault setting ; are described also

    文摘:介紹了300 ? mw火機組模擬機廠用電系統的建模技術及其意義,論述了模擬對象及模擬范圍,對設計、具體實現中的廠用電系統各段負荷計算、廠用電系統各段母線壓計算、盤臺設計及故障設置作了介紹
分享友人