建電站 的英文怎麼說

中文拼音 [jiàndiànzhàn]
建電站 英文
build a power station
  • : Ⅰ動詞1 (建築) build; construct; erect 2 (建立; 設立; 成立) establish; set up; found 3 (提出;...
  • : Ⅰ名詞1 (有電荷存在和電荷變化的現象) electricity 2 (電報) telegram; cable Ⅱ動詞1 (觸電) give...
  • : Ⅰ動詞1 (站立) stand; be on one s feet 2 (停下來; 停留) stop; halt; pause Ⅱ名詞1 (停車點) st...
  • 電站 : power station電站船 generating ship
  1. On the basis of collecting and arranging a large amount of projects experience, conbined with construction diversion flood passing measures design and hydraulic model test of lihua hydraulic pawer station in 1995 and 1996, the dissertation studies the issues related with characteristics of concrete face rockfill dam including the selection of construction diversion flood passing standard and measures, flood passing during construction period and embankment stage, coffer dam design, construction scheme and general schedule etc. and present preference for project construction

    本文在搜集整理大量工程經驗的基礎上,結合蓮花水在1995年及1996年導流渡汛工程措施設計及水工模型試驗,對混凝土面板堆石壩的導流渡汛標準、導流方式及其選擇、施工期渡汛及壩體填築分期、圍堰設計以及施工方案及總進度等與混凝土面板堆石壩特點有關的問題進行研究,為工程設提供一定的參考。
  2. The following are the large projects undertaking by haifeng company : crude oil electricity plant project of north china oil field hydroelectricity factory, apartment ( 22 stories ) of yuanda real estate company of dalian shipping group, helios hotel of helios group in dalian development zone, tilt aqueduct bridge of shanxi hongqi reservoir ( total span : 267m ), supply and sale building and city construction building ( both are antique architectures ) of shanxi heyang city, sea drainage pipe of hainan fudao fertilizer factory ( 1520 ), 8 oilgas docks of hainan haiyan oilgas company, basha condensable gas transfer station of haiyan company, 10, 000m3 oilgas storage tank of arco company ( usa ) in hainan nanshan, gas pipe and fuel gas installation project of hainan nanshan electricity co., ltd, base and accessory project of hainan gas company, bei da huang cereal and oil market in harerbin, hainan cross island pipe, changhuajiang river pipe crossing project, taihangshan mountain earthwork project ( the 19th section of west - to - east gas transmission project )

    海南海峰公司承大的工程項目:華北油田水廠原油發工程;大連船泊集團遠達地產公司的遠達公寓( 22層) ;大連開發區香港太陽神集團的太陽神大酒店;陜西紅旗水庫斜拉渡槽工程(全跨267m ) ;陜西合陽供銷大樓及城大樓(均為仿古) ;海南富島化肥廠排海管線( 1520 ) ;海南海燕油氣公司八所油氣碼頭;海燕公司白沙液化氣中轉;海南南山美國阿科公司儲油氣萬立米大罐工程;海南南山力股份有限公司天然氣管線及燃氣安裝工程;海南南海天然氣有限公司基地及配套工程;哈爾濱北大荒糧油批發市場;海南環島管線;昌化江穿越工程;西氣東輸十九標段,太行山土石方工程。
  3. Namely : high wear - resisting rubber, screen mesh of polyurethane ( pu ), become the domestic biggest producer specializing in high wear - resisting screen mesh, the practical experience for many years, craft is it develop high - quality to apply, durable new product have all over foot industrial demand modernized polyurethane, becoming can produce the production bases of different high wear - resisting screen mesh at home, whom products can select rubber or polyurethane screen mesh for use at home separately coloured, ferrous metal mine enterprise, power station and building materials sift subsystem use, well received by ore dressing circle from home, this mean square garden screen mesh of our company credit can trust among user

    即:高耐磨橡膠、聚氨酯( pu )篩網,成為國內專業生產高耐磨篩網的最大廠家,有著多年的實踐經驗,將現代化的聚氨酯工藝應用於開發優質、耐用的新產品來滿足工業需求,成為國內能生產各種高耐磨篩網的生產基地,產品可以分別選用橡膠或聚氨酯篩網在國內的有色、黑色金屬礦山企業、水材篩分系統使用,受到國內選礦界的好評,這就意味著我公司的方園牌篩網在用戶中信用完全可以信賴。
  4. Building up the math - model of transient for the all hinge of riverbed power station with the kaplan turbine, building a simulation software for this kind of system and calculate the transient which take into account the effect of the ground swell on the riverbed. this program also can calculate the different kind of the kaplan turbine

    針對轉槳機組河床逕流式的樞紐系統,立了全樞紐過渡過程的計算模型,並且編制了相應的計算程序,進行了計及河床涌浪的全樞紐系統的過渡過程模擬計算,該程序能對同一樞紐中含有不同型號機組的同時進行過渡過程計算。
  5. After many years of civil construction and facility renovation, shmp become a modern large enterprise with complete management organization, strong technical ability, sufficient manufacturing facility, advanced procedure, perfect testing method to finish design and manufacturing of heavy equipment for power industries, metallurgy and rolling industries, forging and pressing industries, minery and cement industries, water conservancy, and also high quality heavy casting and forging

    我公司經過多年的基本設和技術改造,現已成為一個組織管理機構健全,技術力量雄厚,加工設備齊全,工藝手段先進,測試方法完善,可以獨立設計、製造大型、冶煉、軋鋼、鍛壓、礦山、水泥材設備和大型優質鑄鍛件的現代化大型企業。
  6. Guide for the rehabilitation of hydroelectric power plants

    的重指南
  7. If we had n't listened to them, this hydropower station would never have been built.

    如果不是聽取他們的議,今天就不可能有這個水
  8. A monument commemorating the liquidators, erected near the chernobyl nuclear power station

    一座紀念清理人員的紀念碑立在切爾諾貝爾核附近
  9. These fears have resulted from the development and installation of nuclear power plants.

    的設計和設是產生這種憂慮的原因。
  10. The research outcome of this article has important value to object ' s positioning in virtual scene and modeling technology in electric transform station perambulate simulation

    本論文研究成果對虛擬場景中的目標定位、變巡視模擬中的模技術具有參考價值。
  11. This paper carries on the 3d finite element structure analysis for power house monolith with a bulb turbine hydropower station located in the upstream of huang river as the carrier

    摘要以黃河上游擬的某燈泡貫流式水為載體,對廠房壩段整體進行了三維有限元結構分析。
  12. Predictive control based on rbf neural network

    神經網路的鍋爐燃燒系統非線性
  13. 1966 the world ? s first major tidal power station, at the rance estuary in the golfe de st malo in brittany, was opened by president de gaulle

    坐落在法國布列塔尼半島聖馬洛灣朗斯河口處的世界上第一座大型潮汐發成,戴高樂總統出席竣工儀式。
  14. The developing ways in water power resource could be by solely capital, joint - stock, corporation, or through contract, rent, shares, bit for, vendue etc to gain the managing right for completed hydropower stations, also shares ( property right ) could be transferred and succeeded

    允許獨資、股份、合作等方式開發水,通過承包、租賃、股份、招標拍賣等形式取得已建電站經營權,允許其股權(產權)轉讓、繼承。
  15. Westinghouse signs nuclear power deal with china

    西屋器與中國簽署協議
  16. In accordance with the testing results and the analysis concerned, it is considered that the seismic wave method, borehole acoustic method and indoor rock mechanics test are feasible to evaluate the engineering quality of the foundation rock for the toe slab of the dam comprehensively, and the results can lay a reliable foundation for the accepting the foundation rock for the toe slab of the dam

    根據檢測結果與分析,認為採用地震波法、鉆孔聲波法以及室內巖石力學試驗綜合評價水大壩趾板基巖體工程質量是可行的,其成果可為大壩趾板基巖體驗收提供依據。
  17. Based on seismic wave method, borehole acoustic method and indoor rock mechanics test, the dynamic and static parameters of the foundation rock for the toe slab of the concrete face rockfill dam for shuibuya hydropower station are tested, and then the relationship among the rock quality, dynamic parameter and static parameter are established with the parameters obtained from the test, furthermore, the classification and the quality evaluation are made as well

    摘要採用地震波法、鉆孔聲波法以及室內巖石力學試驗法,對水布埡水面板壩趾板基巖體進行了動、靜參數測試,並根據所獲的參數立了巖體質量、巖體動力學和靜力學參數三者之間的相關關系,對工程巖體進行了質量分級和質量評價。
  18. The guizhou xishui power station ' s 135mw set are regareded as a example, the paper sets up a electric system ' s dynamic maths model, exploits a control configuration software basely on dcs power station simulator, and designs a software of simulator ' s logic protect ( include electric logic ) and control

    以貴州習水廠135mw機組模擬機的開發為實例,本文立了以氣系統為對象的動態數學模型,開發了一個基於dcs模擬機的控制組態軟體,並應用該組態軟體設計了對象機組的邏輯保護(包括氣邏輯)及控制部分的模擬軟體。
  19. In his presentation entitled pumped storage power generation technology and project investment analysis, he gave a birds view on the pumped storage resource in china, development of pumped storage power station, its function in load valiation and the necessity of its construction

    他分析了全國22個省市區的抽水蓄能資源,總結了國內抽水蓄能的開發現狀,並指出抽水蓄能是一種經濟的調峰手段,分析了加快東部廣東和中部抽水蓄能設的必要性。
  20. At any rate, a group of municipal power companies in the american midwest reckon that building a wind - powered compressed - air plant to take advantage of the blustery great plains will be worthwhile

    至少,美國中西部的一批市級力公司評估認為,值得立一個風力壓縮空氣發來對大平原地區的強勁風力資源加以利用。
分享友人