抽水能力 的英文怎麼說

中文拼音 [chōushuǐnéng]
抽水能力 英文
pumping capacity
  • : 動詞1 (把夾在中間的東西拉出; 提取) take out (from in between) 2 (從全部里取出一部分; 騰出) ...
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : 能名詞(姓氏) a surname
  • : Ⅰ名1 (力量; 能力) power; strength; ability; capacity 2 [物理學] (改變物體運動狀態的作用) forc...
  • 抽水 : 1. (用水泵吸水) draw [pump] water 2. (縮水) (of cloth through wetting) shrink
  • 能力 : ability; capacity; capability
  1. But after pumping for one whole night, they were losing the battle against the rising water and were on the point of giving up

    但經過一夜這后,他們沒戰勝不斷上升的,他們快要放棄努了。
  2. 2. based on the results of experimental data of the tailrace surge tank of yi xing pumped - storage station in jiangsu province, this research investigates the methods for the head loss coefficients of throttled surge tank with linking pipe by means of the method which incorporates experimental results with theoretical analysis

    結合江蘇宜興電站尾調壓室模型試驗成果,採用理論計算與模型試驗結果相結合的方法,對有連接管的阻抗式調壓室局部頭損失系數的計算方法進行了討論。
  3. It can serve for synchronous spinning reserve, load following, frequency control and synchronous condenser operation. due to the difficulty of quantitative calculation, the typical cases on dynamic function of pumped storage plant are qualitatively analyzed in this paper

    電站具有運行靈活、啟動迅速的特點,其在電系統的動」態效益主要表現在緊急事故備用、負荷跟蹤、調頻和同步調相上。
  4. Study on hydraulic characteristic of escher - wyss wyepiece of xilongchi pumped storage power station

    西龍池電站內加強月牙肋岔管特性研究
  5. Flow resistance characteristics of symmetric fork tube used in a storage - pumped hydroelectric plant

    電站對稱岔管的流動阻特性
  6. Di - on electrics service and products cover the power electric field including power generation transmission distribution, power equipment manufacturing, subway, utilites, ac dc metrology field as well, more than 500 units of electric power utilities and stations such as beijing power supply bureau, guangzhou power supply bureau, baosteel, three gorges power station and more manufacturers like siemens, abb, alstom, bicc, pirelii, toshiba and more and 30 units of metrology institutes in china like nim, tsinghua university and more are our user. di - on electric is sole and exclusive distributor for numerous famous companies like transinor doble norway, measurements international canada, ndb canada, schuetz germany, aan germany, dr. strauss germany and etc, taking care of their business and service in p. r. china including hongkong

    絕大多數員工擁有本科和研究生以上學歷,在電系統和計量系統工作多年,從事電檢測帶電監測和計量測試儀器的技術服務和市場銷售工作長達10年以上,為約500多家電工業系統的發供電部門如北京供電局,廣州電局,深圳供電局,三峽電廠,廣州電廠,田灣核電站等等,科研調試部門如廣東省電試驗研究所,湖北省電試驗研究所等等與設備生產廠如siemens , abb , alstom , toshiba等等提供了國際最先進可靠的測試技術和儀器設備為約30多家國內二級以上相關計量科研院所,包括國家計量院,清華大學,中國運載火箭研究院,空間技術研究院,航天二院,成飛,西飛和各省市計量院,電試驗研究院所等提供了大量最先進可靠的計量檢測儀器。
  7. Develop and manufacture large pumped storage units, large tubular turbine units, high - power super - critical thermal power unit, large air - cooled turbine generator, large cfb boilers, high - power nuclear steam turbine and generator, pressure shell of nuclear island, high - pressure evaporator and primary pump

    開發生產大型機組、大型貫流式機組、大功率超臨界火電機組、大型空冷汽輪發電機、大型循環硫化床鍋爐、大功率核電站汽輪機和發電機、核島設備壓殼、高壓蒸發器和主泵等核電一級設備。
  8. This product is made of superfine fabrics, free of any chemical ingredients and 6 times higher water absorbability than ordinary towel. it feels soft, powerful to remove dirt. it is ladder and mold - proof, can be washed manually or by washer, it has four times longer life than ordinary towels

    該產品採用超細紡織面料織造,不含任何化學成分,吸是普通毛巾的6倍,手感柔軟去污強,不絲,不霉爛,可手洗機洗,使用壽命是普通毛巾的四倍。
  9. The overhaul of power units are arranged in terms of peaking capacity balance and the power loads are dispatched based on the principle of equal incremental coal consumption rate in the new method, which is anticipated to solve the economic operation of the power system

    實際上,電站的容量效益與電網的負荷平、負荷曲線形狀和常規電的比重有關,而節煤效益除與負荷平、負荷曲線形狀有關外,還與電網的電源結構、火電機組的動特性有關。
  10. But for the reservoir water - supply system, the reservoir whose oam cost is low and flow into the reservoir is more may be selected to be taken advantage of the storage capacity of this kind of increase to regulate some water yield more and in order to substituting the water supply of the other water supply projects whose oam cost is comparatively higher, so that to achieve the goal of the oam saved, that is to say, that can utilize this regulation capacity increased of the reservoir to optimize operation between the raw water systems so that to save the oam of the system. namely, it can obtain a certain economic benefits to utilize this kind of difference between water supply ability and reality water - using levels existing for a long time

    從長春市供系統長期規劃和目前供現狀研究得出,在目前和今後的長時期內長春市供系統的供總是大於實際用平。這種長期存在的差別對松花江供只意味著減少量。但對庫工程供系統則可挑選運行費用低的、入庫量較多的某個庫,利用這種增加的調節庫容多調節出一些量,以替代運行費用較高的供工程的供
  11. The research of system makes the observational information of tongbo dam realize standardization manage, tidy up and analyze the information quickly and exact, give the environmental physics number and diagnostic numer of displacement, stress and seepage, build the mathematical model of each observational information, evaluate the working modality of the dam, thereby ensure safe working of the dam

    系統的研製使桐柏電站的觀測資料實現規范化管理,快速、準確地整理、分析觀測數據,給出環境物理量及位移、應和滲流等觀測效應量的特徵值,建立各觀測效應量的數學模型,分析評估大壩的工作形態,從而保證大壩的安全運行。
  12. The pressure existing between the guide vane and the runner when the pump - turbine of east china tongbai pumped storage power station stops at different loads is analyzed, and the method for determining the best load at which the generator circuit breaker ( gcb ) switches off during operation of the pump - turbine is illuminated

    摘要介紹華東桐柏電站的泵運行時,不同負荷工況下停機、導葉和轉輪間壓的變化,闡述了華東桐柏電站1號機組發電機斷路器開斷的最佳負荷值選定。
  13. In consideration of the special features of the power system of lhasa area, the station uses the surplus electricity to draw water and store energy when its load is at the lowest and discharges water to generate electricity at the peak load

    為維護生態環境,按拉薩電系統的特點、電站利用負荷低谷時的多餘電量負荷高峰時放發電,總體上不改變羊卓雍湖的量,以保羊湖位不下降。
  14. By incorporating the power sources location and load prediction results in the energy utilizing proposal, a balance for the power volume needed by 3 counties in the area in three " five - year plans " period is also made, the result of which indicates that, it can meet the power demand required by the social - economic development in the region in next three " five - year plans " if the water power resources are rationally planned and developed and then a comprehensive energy utilizing proposal by combining solar and winding energy together

    並結合區內電源點分佈和負荷預測結果,進行了各縣三個五年計劃期間的電電量平衡。得到了相應的結論。基於對風、光資源開發各自特點的分析,文中進一步對多互補系統進行了較深入的研究,明確了在阿里地區特定的自然條件下,採用風光互補開發方式的合理性及可行性。
  15. This was invented that first taiwan uses the solar heating air to expand acting and machine drawn water initial stage to the men that solar energy uses from 1615 france engineer luo virtue cock, and the mankind directly use solar energy as the one kind of sources of energy and motive force, and has had the history of more than 300 years

    太陽的利用從1615年法國工程師所羅門?德?考克斯發明了第一臺利用太陽加熱空氣膨脹做功而的機器開始,人類將太陽作為一種源和動直接加以利用,已有300多年的歷史了。
  16. The development of solar energy cell : from 1615 this was invented that first taiwan uses the solar heating air to expand acting and machine drawn water initial stage to france engineer luo men virtue cock, and the mankind directly use solar energy as the one kind of sources of energy and motive force, and has had the history of more than 300 years

    太陽電池的發展:從1615年法國工程師所羅門?德?考克斯發明了第一臺利用太陽加熱空氣膨脹做功而的機器開始,人類將太陽作為一種源和動直接加以利用,已有300多年的歷史了。
  17. A series of hydraulic model experiments of water flow, head losses and flow state in reservoir under various conditions are carried out for the design of the dashuzi pumped - storage plant

    摘要本文結合大樹子電站下庫進出口試驗任務,對側式短進出口在不同工況下的流速分佈、頭損失、庫區流態等流特性進行了模型試驗研究。
  18. Displacement function means for calculating geostress in fem analysis of underground houses is used, based on crustal stress data of underground cavern of pump water station of tong guanshan yixing to store energy, applying the displacement function theory and 3d nonlinear fem, the thesis simulates a displacement field applied the boundary in engineering area and obtain the initial crust stress field through load function in ansys. the result shows that the error between regressed ones and actual ones is controlled in allowed limit and supply the important data for building and design

    根據宜興銅官山電站地下廠房區的地應實測資料,運用位移函數法理論,採用三維非線性有限元計算方法,反演出施加在廠房區邊界上的位移場,藉助州sys有限元分析軟體,獲取模型邊界節點的坐標信息,然後通過ansys軟體的載荷函數將邊界位移程序化施加到模型邊界上,最後得到整個區域的初始地應場,結果表明回歸后的地應值與實測值接近,為地下工程的施工設計提供了重要的資料。
  19. The shahe pumped - storage power station with two 50mw reversible units has been in good conditions on general since it was put into operation, but there still were some defects, such as the failure of unit ' s contemporaneous device, the insufficient cooling water discharge and pressure, and the failure of static frequency converter and excitation overcurrent

    摘要沙河電站兩臺50mw可逆式機組自投運以來,總體情況良好,但是也出現了一些缺陷,如機組同期裝置故障,機組冷卻流量或壓不足,靜止變頻器故障,勵磁過電流故障等。
  20. Quantity of generating electricity should be also calculated while the river inflow, quantity of water transfer and its duration curve are taken into account. as a company, it is necessary to take a series of measures to increase its benefits while water transfer leads to the decrease of hydro power inevitablly. the efficient methods can be taken into account as follows : i ) to improve the forecast accuracy, to decrease surplus water, and to increase seasonal electricity energy, ii ) to raise the peaking ability of dan jiang kou power station to obtain peaking benefits, iii ) to choose a suitable site to construct a pumped storage plant for peaking benefits

    在進行以上四方面內容深入探討的基礎上,論文針對丹江口利樞紐運行任務、運行方式的重大變化,提出漢江集團應採取以下因應措施以適應企業產業結構的調整,這些措施包括:準確計算發電效益減少值;合理地核算源的供成本;以上述兩項計算成果為基礎,核算企業結構調整后總效益變化量;提高預報平,減少棄量,爭取增發季節性電;研究新的調度方式,提高電站調峰,提高電站的容量效益;在適當的地點修建電站,提高電站的調峰
分享友人