拆分器控制項 的英文怎麼說

中文拼音 [chàifēnkòngzhìxiàng]
拆分器控制項 英文
splitter control
  • : 拆動詞[方言] (排泄大小便) excrete
  • : 分Ⅰ名詞1. (成分) component 2. (職責和權利的限度) what is within one's duty or rights Ⅱ同 「份」Ⅲ動詞[書面語] (料想) judge
  • : 名詞1. (器具) implement; utensil; ware 2. (器官) organ 3. (度量; 才能) capacity; talent 4. (姓氏) a surname
  • : 動詞1 (告發;控告) accuse; charge 2 (控制) control; dominate 3 (使容器口兒朝下 讓裏面的液體慢...
  • : Ⅰ動詞1 (製造) make; manufacture 2 (擬訂; 規定) draw up; establish 3 (用強力約束; 限定; 管束...
  • : Ⅰ名詞1 (頸的後部) nape (of the neck) 2 (款項) sum (of money) 3 [數學] (不用加、減號連接...
  • 拆分 : divide
  • 控制 : control; dominate; regulate; govern; manage; check; cybernate; manipulate; encraty; rule; rein; c...
  1. Fabrication of the box beam is divided into such parts as reinforcement, formwork, concreting, prestressing, moving and storing of beam, pipe grouting under pressure, end sealing of the beam, water - proof layer on the bridge surface system, protective coating etc. the paper makes description of effective box beam construction technology and workmanship which can be adopted in other projects, such technologies as : manufacturing and fixing of reinforcement, steel reinforcement fixing baseplate, web plate and top plate respectively and lifting the steel skeleton into form, requirements of design and manufacturing and way of utilization for dismantling - erection type formwork and hydraulic formwork, optimization of concrete ratio, concrete pouring process of two ends of beam in priority over the middle, in sequence of first baseplate followed by web plate and top plate at last, concrete pouring in inclined section and in horizontal layer, concrete vibration mainly by external vibrator in assistance with internal vibrator, methods and regulation for steam curing of concrete, dual controls over stress and strain to ensure quality of prestressing workmanship, construction method of effective beam moving by heavy - weight special moving facility, some regulations and key notes about construction of grouting under pressure, beam ends sealing, water - proof layer on the bridge surface system, protective coating

    箱梁製造由鋼筋工程、模板工程、混凝土工程、預應力工程、移存梁工程、孔道壓漿工程、梁體封端工程、橋面防水層和保護層工程等施工環節組成。文中介紹的採用胎具製作和綁扎鋼筋,底腹板和頂板別綁扎並吊裝鋼筋骨架入模;裝式和液壓式兩種模板的設計、製作要求和使用方法;綜合考慮、優化混凝土配合比,混凝土灌注從兩端至中間、先底板、后腹板、再頂板的施工順序和斜向段、腹板水平層、附著式振搗為主、插入式搗固為輔的施工工藝,蒸汽養護的方法和規定;應力應變雙確保預應力施工質量的施工技術;採用重物移運有效移梁的施工方法;壓漿、封端、橋面防水層和保護層施工的一些規定和注意事等都是對箱梁製造行之有效的施工技術和施工方法,並可為以後類似施工作借鑒。
  2. Occurs when the splitter control is moved

    當移動拆分器控制項時發生。
  3. Occurs when the splitter control is in the process of moving

    拆分器控制項正處在移動過程中發生。
  4. Gets or sets the distance between the splitter control and the container edge that the control is docked to

    獲取或設置拆分器控制項停靠的容邊緣之間的距離。
  5. Gets or sets the minimum distance that must remain between the splitter control and the container edge that the control is docked to

    獲取或設置拆分器控制項停靠的容邊緣之間必須保持的最小距離。
  6. Gets or sets the minimum distance that must remain between the splitter control and the edge of the opposite side of the container or the closest control docked to that side

    獲取或設置拆分器控制項和容(或停靠到離該側最近的)另一側邊緣之間必須保留的最小距離。
  7. Control is set to jump 10 pixels when dragged

    中的設置為拖動時跳過10個像素。
  8. Describes how to control the orientation of the splitter within the

    的方向。
  9. Therefore, to enable the user to resize a docked control at run time, dock the control to be resized to an edge of a container, and then dock a splitter control to the same side of that container

    因此,為使用戶能夠在運行時調整停靠的大小,請將要調整大小的停靠在容的一條邊緣上,然後將停靠在該容的同一側。
分享友人