拆模板 的英文怎麼說

中文拼音 [chàibǎn]
拆模板 英文
demolding
  • : 拆動詞[方言] (排泄大小便) excrete
  • : 模名詞1. (模子) mould; pattern; matrix 2. (姓氏) a surname
  • : Ⅰ名詞1 (片狀硬物體) board; plank; plate 2 (專指店鋪的門板) shutter 3 [音樂] (打拍子的樂器) ...
  • 模板 : [土] formwork; mould; shuttering; follow board; form board; match board; match plate; mother plat...
  1. To avoid manual labor of chiseling - grossness, in the area of second - stage concrete construction, permanently non - removed metal molding boards nets are used as molding boards of first - stage concrete. substitution joints of reinforcing steel bars for traditional electric welding and usage of equipments for joints of reinforcing steel bars efficiently improve strength of junctions and rate of connecting reinforcing steel bars, and safety of construction and stability of quality, and greatly reduce cost. it ' s possible that three gorges project become top - ranking project in the world by study on systems engineering of high - strength concrete construction

    混凝土縫面處理採用高壓水流沖毛技術,大大提高了施工工效,減少了倉面污染;工程大量採用定型鋼施工技術,提高了壩體混凝土成型質量和工程進度;在二期混凝土施工區域,為免除人工鑿毛勞動強度,採用永久性免金屬網作為一期混凝土;鋼筋連接改進傳統的電焊連接方式,採用大量採用鋼筋接頭機械連接技術,有效提高了接頭強度和鋼筋連接速度,施工安全性大大加強,質量穩定性有效提高,經濟成本大大降低;三峽二期工程持續高強度混凝土施工系統工程的研究,使三峽工程成為名符其實的「世界一流工程」成為可能;三峽二期工程混凝土溫控綜合技術的應用,有效降低了壩體混凝土溫度的產生;混凝土表面處理及裂縫處理技術的應用,提高了建築物的整體性和耐久性。
  2. Removal of the formwork for the bridge deck of str19 near the wsd catchwater

    鄰近於長沙引水道除橋編號str19的
  3. They include the framework of product long - distance maintenance guiding system, fault diagnose, automatically making of maintenance technics, the query of information and the visual leading. according to b / s model, the author puts forward system structure of product maintenance guiding system based on network. the dissertation introduces the main technologies for the realization of maintenance guiding system, the data structure of product fault and order of disassembly and assembly, and the way to get the preliminary data

    本論文對產品維修向導系統的幾個部分:包括產品維修向導系統的體系結構、故障診斷、維修工藝的自動生成、資源信息查詢和可視化引導的有關技術進行研究;根據web技術b / s式結構和產品維修過程提出基於網路的產品維修向導系統的體系結構;介紹了維修向導系統的具體實現中的一些主要技術和產品故障數據結構、裝順序數據結構的設計以及這些數據表的原始數據獲得方法;對產品故障診斷採用的決策樹方法作了介紹;重點對產品故障診斷和產品各零部件的裝順序關系以及資源信息的查詢進行了實現;針對轎車卡式門鎖,開發了產品維修向導系統的實例。
  4. Especially, some new advanced techniques such as integral casting concrete, integral sliding formwork are firstly applied in this project in china. a new style bridge girder erection machine which can lift a piece of box girder weighting 300 tons once was designed and manufactured successfully

    特別是本工程首次採用的一次性整體澆灌混凝土工藝、整體滑動設計、以及300噸裝式架設機的研製成功,為今後同類產品的施工提供了一些新思路和寶貴的實踐經驗。
  5. The key studied areas are the paishanlou, daban, dayintaogou, wujiazi gold deposits. in terms of the study of regional structures, geophysics, and geochemistry, and necessary tectono - physical and numerical modeling, as well as studies of ore - forming and ore - controlling structures, the author holds that the detached - ductile sheari ng zone of the metamorphic core complex is the main ore - controlling structural system, and the regional mineralization is related with the regional ore - forming structural systems which are controlled by compounding of regional structural systems with different time and grade

    重點以排山樓、大、大櫻桃溝、五家子等金礦礦田構造調查為基礎,以區域地質構造、地球物理、地球化學研究為背景,輔以成礦構造物理型、數學型,通過成礦構造、控礦構造研究,將本區金礦的成礦構造確認為變質核雜巖離滑脫剪切帶,並且是與區域成礦構造系統相聯系,在不同時期、不同級序、不同力學性質構造體系成分復合條件下成礦。
  6. Fabrication of the box beam is divided into such parts as reinforcement, formwork, concreting, prestressing, moving and storing of beam, pipe grouting under pressure, end sealing of the beam, water - proof layer on the bridge surface system, protective coating etc. the paper makes description of effective box beam construction technology and workmanship which can be adopted in other projects, such technologies as : manufacturing and fixing of reinforcement, steel reinforcement fixing baseplate, web plate and top plate respectively and lifting the steel skeleton into form, requirements of design and manufacturing and way of utilization for dismantling - erection type formwork and hydraulic formwork, optimization of concrete ratio, concrete pouring process of two ends of beam in priority over the middle, in sequence of first baseplate followed by web plate and top plate at last, concrete pouring in inclined section and in horizontal layer, concrete vibration mainly by external vibrator in assistance with internal vibrator, methods and regulation for steam curing of concrete, dual controls over stress and strain to ensure quality of prestressing workmanship, construction method of effective beam moving by heavy - weight special moving facility, some regulations and key notes about construction of grouting under pressure, beam ends sealing, water - proof layer on the bridge surface system, protective coating

    箱梁製造由鋼筋工程、工程、混凝土工程、預應力工程、移存梁工程、孔道壓漿工程、梁體封端工程、橋面防水層和保護層工程等施工環節組成。文中介紹的採用胎具製作和綁扎鋼筋,分底腹和頂分別綁扎並吊裝鋼筋骨架入裝式和液壓式兩種的設計、製作要求和使用方法;綜合考慮、優化混凝土配合比,混凝土灌注從兩端至中間、先底、后腹、再頂的施工順序和斜向分段、腹水平分層、附著式振搗為主、插入式搗固為輔的施工工藝,蒸汽養護的方法和規定;應力應變雙控制確保預應力施工質量的施工技術;採用重物移運器有效移梁的施工方法;壓漿、封端、橋面防水層和保護層施工的一些規定和注意事項等都是對箱梁製造行之有效的施工技術和施工方法,並可為以後類似施工作借鑒。
  7. Operation platform : all the frames on construction layer and shuttering layer below without backout will be put with scaffolding plank as construction work platform

    3操作平臺:施工層及下面相鄰未拆模板層每步架上均滿鋪腳手做為施工操作平臺。
  8. The system is one module of the demolition blasting expert system developed by the professor fangzefa and doctor yehaiwang of wuhan university of technology. the demolition blasting expert system is made up of the following four modules : the plate demolition blasting, the building and frame building demolition blasting, the soaring structure demolition blasting, the thin - wall vessel demolition blasting. the building and frame building demolition blasting module is composed of the brick building and the brick - concrete building and the frame building demolition blasting

    本文研究的對象是框架結構樓房除爆破專家系統,該系統是武漢理工大學房澤法教授、葉海旺博士開發的除爆破專家系統四大塊:(塊)體除爆破、樓房框架除爆破、高聳建築物除爆破(已開發) 、薄壁容器類構築物除爆破所組成的除爆破設計專家系統中樓房框架除爆破塊其中的一個子塊,樓房框架除爆破專家系統包含磚結構類樓房、磚混結構類樓房和框架結構類樓房三大類。
  9. ( 2 ) the stress caused by heat of hydration during construction is mainly distributed in the beams, and girders and stress in slab was smaller ; during service process, the stress caused by difference in temperature in different seasons is mainly distributed in bottom components ; the stress caused by difference of inside and outside temperature is mainly distributed in peripheral components of building ; the stress caused by difference in temperature due to sunlight is mainly distributed in the components exposed to the sun. ( 3 ) the control methods brought forward such as setting the reasonable stripping time reducing cast temperature of concrete setting after - treatment joint inflicting prestress arranging steel for construction requirement and so on are effective and their application may be extended

    在使用期,由季節溫差作用引起的結構內力主要分佈在底層構件上;由內外溫差引起的內力主要分佈在建築物外圍構件上;由日照溫差引起內力主要分佈在向陽面的構件上; ( 3 )在施工階段,可採取使用導熱性能較好的、合理設計時間、降低澆築溫度等措施來減小水化熱引起的結構內力;採用設置后澆帶的措施來減小結構在整體降溫情況下產生的溫度內力。
  10. Remove the two check modules by pressing firmly from the outlet end ( end with wrench pads ). o - ring seals will be removed with the removal of modules from the body

    從出口端(帶有鉗基座的埠)穩穩地壓下,卸兩個止回塊。 o形環密封將隨著塊的卸從閥體上卸下來。
  11. Based on these characteristics we adopted a project which combines the wire and wireless technology when it is in research. the design of image processing card which is used to process the data of monitoring site with the technology of pci bus is completed. the design of the circuit of sending and receiving information which is the analogue measuring date of temperature and humidity of monitoring site with blue - tooth technology and the design of circuit of sending and receiving & processing alarm data which is generated when emergency happens in monitoring site with rf technology are completed

    根據家庭安全系統應具備點位布控靈活、明線不宜太多以及架設與卸必須方便的要求與特點,本系統在研製時採用了有線與無線技術相結合的解決方案:利用pci總線技術完成了用於監控場所景況數據處理的圖像採集處理的設計;利用藍牙技術完成了用於監控場所溫度、濕度等擬量測量的信息發送電路和信息接收處理電路的設計;利用rf技術完成了用於監控場所緊急情況報警的告警發送電路和告警接收處理電路的設計。
  12. It is show that non - demoulding shear wall in which the cold - draw steel wire is taken as reinforcement has great capacity of resisting seismic and quality in the area of seismic

    試驗及分析表明:免拆模板剪力墻墻片單元在墻片單元之中使用冷拔鋼絲網片作為配筋時具有良好的抗震性能,可以滿足地震區的設計要求。
  13. The structure system of non - demoulding formwork board and shear wall are a new type structure resisting seismic. the development of which is to acquire a construct system instead of tradition brick masonries

    拆模板及其剪力墻體系是一種節能的新型抗震結構體系,它的提出旨在找到一種替代傳統的磚混結構的建築體系。
  14. During construction procedure, the stressing of diaphragm beams " tendons and the tensioning of cables interact, the contacting nonlinear issues between girder and form plate etc, which require detailed analysis, arrange the orders and quantities of the stressing of the cables and tendons properly, and guide the construction. the paper, by making plane model and spacial model of yongan bridge, calculated the pre - closure cable forces ( aim forces ) with plane element program, with the help of applied structure analysis program - ansys, acquired the reasonable construction steps of tensioning of tendons and cables

    本論文採用自編平面桿系施工裝配計算程序和大型結構分析程序- ansys ,通過分別建立該橋的平面和空間型(含的作用擬) ,由平面桿系程序倒出斜拉索合攏前的索力(目標索力) ,利用ansys結構分析程序,經過多次的施工過程擬計算之後得出達到目標索力的合理的施工步驟。
  15. This system tests 19 parameters such as the pressure of fore and after main fluid pumps and every sub fluid pumps ", force of pedal, turn angle of steering wheel, speed of every wheels and car body, and calculates 9 correlation analyses according to the gb112676 - 1999 " automobile system structure, capability and test methods " and gb7258 - 1997 " technical regulation of automobile safety ", also it can generate data report automatically

    該系統對汽車制動過程中前後液壓總泵出口液壓、各制動分泵進口液壓、腳踏力、方向盤轉角、各車輪轉速、車體速度等共計19個物理量進行測試。系統硬體由便攜式計算機、數據採集器以及相應傳感器組成。硬體設計中採用了塊化設計思想,使得測試系統體積小、重量輕、抗振動、安裝卸方便、易於維護、可以進行隨車實測試驗。
  16. Geologists and geophysicists have carried out substantial work on petrology, geochemistry, chronology and geophysics, et al., which yields important reference material and constrains for explanations of questions, such as the delamination and exhumation mechanism for the lower crust, models of the rapid uplift of himalayan orogen and deep subduction of india - eurasia plate. while only a little has been done to study the eastern syntaxis at present

    地質學家和地球物理學家已經對西構造結進行了大量的巖石學、地球化學、年代學和地球物理學等方面的研究,為解釋下地殼的沉、折返機制,喜馬拉雅造山帶的快速隆升和印度-歐亞塊的大陸深俯沖式等提供了重要的參考信息和約束條件。
  17. Wall form installation please see attached sketch no. - 4. expended cement mortar shall be used for sealing after form dismantled and pull bolts removed

    安裝見附圖4 。在除對拉螺栓拿出后,採用微膨脹水泥砂漿封堵。
  18. Instruction will pull out variables from a general template pattern for a line, which at a minimal case allows word division

    指令將以一個通用的式從一行中得到變量,並支持最小程度的詞分:
分享友人