拆模 的英文怎麼說

中文拼音 [chài]
拆模 英文
demoulding
  • : 拆動詞[方言] (排泄大小便) excrete
  • : 模名詞1. (模子) mould; pattern; matrix 2. (姓氏) a surname
  1. Distant effect of jurassic collisions of qiangtang terrane, lasa terrane and paleo - pacific land onto the eurasian land made east qinling - dabie mountains in a compressional circumstance for a long time, and suppressed its orogenic extension ; whereas, cretaceous late - collisional extension and appearance of west pacific trench - arc - basin system relieved east qinling - dabie mountains of external compression, instantly result in violent orogenic lithosphere delamination - extension and depressurized - calefactive melting, and consequently, led to the formation of large scale early cretaceous granitoids and intermediate - acidic volcanic rocks

    羌塘地體拉薩地體和西太平洋古陸在侏羅紀與歐亞大陸拼貼碰撞的遠距離效應使東秦嶺大別造山帶長期處于擠壓環境,伸展作用被抑制白堊紀的碰撞晚期伸展和西太平洋溝弧盆體系的遠距離效應使東秦嶺大別地區的外部擠壓消失,導致造山帶巖石圈迅速強烈沉伸展和減壓增溫熔融,從而形成大規早白堊世花崗巖類和中酸性火山巖。
  2. This is an innovated module combined device of desulphurization and dust removal, the user could assemble the compages willfully according to the need of teaching and scientific research

    摘要這是踴套具有創新性的塊組合式濕法脫硫除塵裝置,使用者根據教學和科研的需要,可任意卸組合。
  3. Stochastic network model for disassembly of discarded products

    裝配式產品卸的隨機網路型研究
  4. By physiognomy feature, it could be divided into three types of thermal structure : positive dome model, negative collapse model and border dome core collapse model. based on the depth degree or magma - thermal influenced, it could be divided into five types of thermal structure : ( ancient ) geothermal anomaly focus region model, superficial volcano eruption hydro - thermalism and hypabyssal intrusive model, thermal anticline ( thermal dome ) model, mid - deep intrusive model, deep mantle ( crust ) thermal plume model ; and put forward a perfect model of the thermal structure. there are many interaction system could be induced into a systematic thermal interaction, include : ocean - continent system, basin - mountain interaction, superficial and mid - deep crust - mantle interaction, crust - mantle commingle interaction, vertical thermal interaction ( delamination ) etc.

    依據地貌形態分為三類:正向穹窿型、負向塌陷型、邊隆核陷型:依據巖漿-熱力作用影響的深淺程度或深度分為五類: (古)地熱異常群集區、表淺層火山噴發-熱液活動與淺成侵入型、熱力背斜(熱穹窿) 、中深層侵入型、深部地幔(地殼)熱柱型;提出了熱力構造作用空間分佈的理想式,將洋陸系統、盆山作用、淺表與中深部殼幔作用、殼幔混合、垂向熱力作用(沉)等納入一個整體統一的熱力作用系統中,為盆地動力學研究打開了一個新窗口;研討了熱力構造研究方法。
  5. The system is prohibited by law in the p. r. of china. although, in recent times there has been much market pressure in the p. r. of china for change. especially after the p. r. of china has been the leaguer of the wto

    1994年以前我國銀行業事實上採取的是混業經營式, 1992年下半年開始的泡沫經濟,使銀行大量資金通過國債回購、同業借進入證券市場,金融秩序極度混亂,甚至一度出現了嚴重的金融市場失控局面。
  6. Nwfb " snake bus of bliss " liveried dennis trident model bus 1028

    巴士型可以小鑰匙內附開及重組
  7. ( 7 ) showing and determining the evidence and timing of the lithophere delamination occurred in qinling orogenic belt. pointing out the gold deposit in xiaoqinling - xiongershan region are mostly formed during indosinian to early - yanshan movement, related to mantle fluid injecting caused by lithosphere delamination and plutonic activity caused by further large - scale tectonic extension

    初步闡述了東秦嶺地區的成礦分區和成礦特點,指出小秦嶺一熊耳山地區金礦形成的主要時期是印支一早燕山期,並且與巖石圈沉作用所引起的地慢流體活動和之後進一步大規伸展作用產生的深源巖漿活動密切相關。
  8. Disassembling sieve based - on polychromatic sets has the advantages of higher formalization level and easily programming

    該研究結果保證了卸圖型和卸過程規劃結果的正確性。
  9. Operation platform : all the frames on construction layer and shuttering layer below without backout will be put with scaffolding plank as construction work platform

    3操作平臺:施工層及下面相鄰未拆模板層每步架上均滿鋪腳手板做為施工操作平臺。
  10. Research on form stripping age of underground works

    地下工程襯砌拆模時間研究
  11. ( 2 ) the stress caused by heat of hydration during construction is mainly distributed in the beams, and girders and stress in slab was smaller ; during service process, the stress caused by difference in temperature in different seasons is mainly distributed in bottom components ; the stress caused by difference of inside and outside temperature is mainly distributed in peripheral components of building ; the stress caused by difference in temperature due to sunlight is mainly distributed in the components exposed to the sun. ( 3 ) the control methods brought forward such as setting the reasonable stripping time reducing cast temperature of concrete setting after - treatment joint inflicting prestress arranging steel for construction requirement and so on are effective and their application may be extended

    在使用期,由季節溫差作用引起的結構內力主要分佈在底層構件上;由內外溫差引起的內力主要分佈在建築物外圍構件上;由日照溫差引起內力主要分佈在向陽面的構件上; ( 3 )在施工階段,可採取使用導熱性能較好的板、合理設計拆模時間、降低澆築溫度等措施來減小水化熱引起的結構內力;採用設置后澆帶的措施來減小結構在整體降溫情況下產生的溫度內力。
  12. Discussions with customers in details regarding contraction ratio, cavity number, gluing type, mold pulling out angle, and ripping, thus meeting product requirements

    1開前與客戶詳細討論各項細節,如收縮率、穴數、膠口形式、拔角度、拆模線- - -等等。以滿足您對產品的需求。
  13. Concrete curing should immediately start after frame removed

    6砼拆模后立即均勻塗刷砼養護液。
  14. Short cycle times can be achieved by detaching the mold plates before the concrete is completely set up

    在混凝土完全硬化之前拆模可以縮短周期時間。
  15. Cause and prevention measures of fissure occurred on large volume concrete after moulds removed in high cold area

    高寒地區大體積混凝土拆模后表面產生微裂紋的原因及防治措施
  16. The structural system of concrete bearing wall combined with insulating forms as heat - proof layers is a new type energy saving structural system of the bearing wall

    拆模保溫混凝土承重墻體系是一種節能的新型承重墻結構體系。
  17. The product at this step is still rough, and thus needs operations including carving, robbing and polishing after inspecting color, shape, etc, so as to present the transparency, light refraction or the shadow of the crystal

    拆模后的作品較為粗糙,檢查其色彩、形狀等項目后需要進行切割、研磨、拋光等十余項作業,已達到設計之初所要表現的各種表現形式,例如表現水晶的透徹、光線的折射,或是朦朧的隱約美等等。
  18. It is show that non - demoulding shear wall in which the cold - draw steel wire is taken as reinforcement has great capacity of resisting seismic and quality in the area of seismic

    試驗及分析表明:免拆模板剪力墻墻片單元在墻片單元之中使用冷拔鋼絲網片作為配筋時具有良好的抗震性能,可以滿足地震區的設計要求。
  19. The structure system of non - demoulding formwork board and shear wall are a new type structure resisting seismic. the development of which is to acquire a construct system instead of tradition brick masonries

    拆模板及其剪力墻體系是一種節能的新型抗震結構體系,它的提出旨在找到一種替代傳統的磚混結構的建築體系。
  20. Collapsible die assembly

    拆模具裝置
分享友人