拆磚 的英文怎麼說
中文拼音 [chàizhuān]
拆磚
英文
debricking-
The method of close water test has been used for a long time, so richer experience has been achieved. however, it not only takes pains and time, but also consumes raw materials during the close water test because of miscellaneous working procedures such as bricklaying in the two ends of pipe, water - repellent layer plastering, maintaining and water offletting, brick - block backouting after the test, especially in the region short of water and some drainage pipe with prop - pipe construction. in order to satisfy the fast development of municipal construction, new detection methods should be developed
閉水試驗方法因其應用時間較長,目前已積累了較豐富的經驗,但在閉水試驗時,管道兩端砌築磚堵、抹防水層、養護、灌水浸泡,以及試驗后的放水、磚堵拆除等繁雜工序,不僅費工、費時,而且消耗原材料,尤其是在缺水的地區以及頂管施工的無壓管道,這些矛盾更加突出;因此,為滿足迅速發展的市政建設需要,有必要探索新的檢測方法,閉氣試驗就是其中一種,但是閉氣試驗目前還不完善,有待于進一步深入研究。Demolition of two brick chimneys by directional blasting
兩座磚煙囪定向爆破拆除Demolition of a 36m - high brick water tower by directional folding blasting
磚煙囪集團裝藥定向爆破拆除Blasting demolition of water tower with large diameter and thin brick wall
大直徑薄壁磚結構水塔的爆破拆除An improved design is proposed for blasting demolition of this kind of brick - concrete structure with good overall performance and great stiffness. wherever possible, it is desirable to increase blasting height to arrange blasting cut on the back of building in direction of dumping the building blasted and to adjust the initiation order by using sectional blaster cap
認為對于整體性好、剛度大的磚混結構樓房的爆破拆除,在條件允許時應多處理幾層以增加爆高,在樓房的傾倒背面也應布置爆破切口,還應採用分段雷管來調整其起爆順序,這樣才能達到更好的效果。Demolition of a 50 m - high brick chimney by controlled blasting
高磚結構煙囪的控制爆破拆除The demolition of a 40m - high brick chimney by directional blasting
高磚煙囪定向控制爆破拆除Demolition of a 65m - high brick chimney by directional blasting
四十米高磚砌煙囪的定向爆破拆除Demolition of a hollow brick structure by the air coupling blasting
多點空氣耦合爆破拆除空心磚結構樓房Abstract : to account some difficult problems in theoretical calculation of blasting demolition of buildings, the criterion for disintegration of brick - concrete structures, blasting height of frame structure, counteracting force of supports are analyzed. a numerical simulation is demonstrated for structure ' s destabilization and dilapidation in the process of blasting demolition of buildings such as chimney and bridge, which services a guide for theoretical study and practice of blasting demolition of buildings
文摘:針對建築物爆破拆除理論計算難以把握的幾個問題,如磚混結構解體的判據,框架結構建築的爆高、支座反力,以及框架結構失穩和煙囪、橋梁爆破拆除倒塌過程的數值模擬方法,進行了分析和說明,為建築物爆破拆除設計理論研究與施工提供了參考依據。The work began by dismantling the two parapets in the atrium, then they were assembled again on the green brick wall on both sides of the chambers after careful restoration
修復人員先把天井的兩幅女兒墻拆下,加以修葺后,鑲嵌在兩旁廂房的青磚墻上。而神則由英國修復專家漢約翰進行修復。Demolition of a 40 m - high brick - concrete chimney by controlled blasting
高磚砼煙囪控爆拆除For economic reasons, we did much of the heavy work ourselves - transporting cement, sand, lime, and bricks from the foothills, tearing down the hut, mixing cement, filtering sand, and carrying bucketfuls of building material
為了節省開支,許多粗重的工作例如下山運水泥沙白灰磚,拆棚子拌水泥篩沙提灰桶等工作,我們都親自動手。In 1983, the graceful building was dismantled piece by piece and the carefully numbered blocks of stones were painstakingly reassembled in stanley 15 years later
1983年,美利樓被拆卸,磚塊逐一封存, 15年後再重見天日,于赤柱重建。The system is one module of the demolition blasting expert system developed by the professor fangzefa and doctor yehaiwang of wuhan university of technology. the demolition blasting expert system is made up of the following four modules : the plate demolition blasting, the building and frame building demolition blasting, the soaring structure demolition blasting, the thin - wall vessel demolition blasting. the building and frame building demolition blasting module is composed of the brick building and the brick - concrete building and the frame building demolition blasting
本文研究的對象是框架結構樓房拆除爆破專家系統,該系統是武漢理工大學房澤法教授、葉海旺博士開發的拆除爆破專家系統四大模塊:板(塊)體拆除爆破、樓房框架拆除爆破、高聳建築物拆除爆破(已開發) 、薄壁容器類構築物拆除爆破所組成的拆除爆破設計專家系統中樓房框架拆除爆破模塊其中的一個子模塊,樓房框架拆除爆破專家系統包含磚結構類樓房、磚混結構類樓房和框架結構類樓房三大類。Considering the situation that the chimney was weathered seriously and the strength was so lower that single charge and blasting delay interval should be well - chosen especially
對風化嚴重等強度低的磚煙囪進行爆破拆除時,尤其要控制單響起爆藥量與起爆的間隔時間。Demolition of a leaning brick - structural chimney by directional blasting
傾斜磚煙囪的定向爆破拆除It is one of the oldest and unique examples of the western colonial - style architecture. the house was dismantled in 1982, but over 4000 granite stones and pillars were numbered and stored carefully
為配合都市發展,政府在1982年把大樓拆卸,四千多件花崗巖磚石和樑柱都獲編號碼和妥善保存以備重建。The structure system of non - demoulding formwork board and shear wall are a new type structure resisting seismic. the development of which is to acquire a construct system instead of tradition brick masonries
免拆模板及其剪力墻體系是一種節能的新型抗震結構體系,它的提出旨在找到一種替代傳統的磚混結構的建築體系。Ma wat wai was originally a walled village with brick walls constructed on the four sides and a watch tower on each corner. however owing to past developments, most of the walls and all four corner towers were demolished leaving only this very historic entrance tower
麻笏圍原本四周建有磚墻,四角則建有更樓,但現時大部分圍墻及四個更樓已遭拆卸,只留下這極具歷史價值之門樓。分享友人