拉力鋼筋 的英文怎麼說
中文拼音 [lālìgāngjīn]
拉力鋼筋
英文
tension reinforcement- 拉 : 拉構詞成分。
- 力 : Ⅰ名1 (力量; 能力) power; strength; ability; capacity 2 [物理學] (改變物體運動狀態的作用) forc...
- 鋼 : 鋼名詞(鐵和碳的合金) steel
- 筋 : 名詞1 (肌的舊稱) muscle2 [口語] (肌腱或骨頭的韌帶) tendon; sinew 3 [口語] (可以看見的皮下靜...
- 拉力 : pulling; pulling force; thrust; traction; tension拉力表 draw bar [pull] dynamometer; 拉力測定儀 [...
- 鋼筋 : concrete iron; concrete reinforcing bars; rebar; reinforcing bar; reinforced bar; reinforcing ste...
-
Specification for hot rolled and hot rolled and processed high tensile alloy steel bars for the prestressing of concrete
混凝土預加應力用熱軋和熱軋並處理的高抗拉強度的合金鋼筋規范It is determined that with accurate knowledge of the complete stress - strain curve of concrete in compression, steel in tension, and with an iterative computerized non ? linear method, it is possible to predict the entire moment - curvature, moment - flexural rigidity and axial rigidity relation ship of a cross - section of a structure member
可以確定,只要知道混凝土受壓和鋼筋受拉的完整的應力應變關系,採用選代的非線性計算方法,就有可能預測結構截面彎矩一曲率、彎矩一彎曲剛度和軸向剛度的關系。Columns under axial compression and biaxial bending. in the beginning of the paper, it summarized the history and the actuality of the nonlinear analysis of special - shaped columns and the capability of the sliding of reinforcement anchoring. on the basis of related papers, the full path of stress - strain relation of concrete and the sliding of longitudinal reinforcement anchoring are all considered
本論文主要內容是對鋼筋混凝土異形截面雙向壓彎柱(包括l形、 t形、十字形柱)進行非線形全過程分析,首先綜述了異形柱構件非線性分析以及粘結滑移性能研究的歷史與現狀,在有關文獻基礎上考慮了受拉縱筋和周圍混凝土的粘結滑移和混凝土應力?應變關系曲線的下降段。The content of the paper is nonlinear analysis of complete response process for t, l - shaped and " + " shaped section r. c. columns under axial compression and biaxial bending. on the basis of related papers, the full path of stress - strain relation of concrete and the sliding of longitudinal reinforcement anchoring are all considered, simultaneously, the restriction effect for concrete by thickening of stirrups is also included
本論文主要內容是對鋼筋混凝土異形截面雙向壓彎柱(包括l形、 t形、十字形柱)進行非線形全過程分析,在有關文獻基礎上考慮了受拉縱筋和周圍混凝土的錨固滑移和混凝土應力?應變關系曲線的下降段,同時考慮到在箍筋加密區箍筋對混凝土的約束影響。This paper focuses on the research of the stress mechanism of the ribbed shell structure in statics, dynamics and under the explosive load on the basis of the engineering practice of cave depot of single aircraft. in this paper, according to the classical shell theories, the basic differential equilibrium of the ribbed shell structure and the finite element analysis of 3d rippled plate are established, in which the function of annular ribs reinforcement bars and 3d ripped steel plates are distributed in the range of the steel, and the functions along the longitude direction of tension, bending, and torsion are neglected ; applied with dynamic analytical theory, the dynamic model of ribbed shell structure and the analytical theory model of elastic - plastic are set up ; the triangle series method is used to solve the displacement and stress under the distributed load and the concentrated load of the ribbed shell structure
本文以軍用機場地面單機掩蔽庫工程建設為工程背景,首次對內襯三維波紋鋼板混凝土拱型復合結構的受力機理進行了靜力、動力和爆炸荷載的分析研究。根據將橫肋、鋼筋及三維波紋鋼板的作用均勻分佈在殼體范圍內的情況,忽略橫肋、鋼筋及三維波紋鋼板沿殼體母線方向的抗拉、抗彎及其抗扭作用,首次推導出了內襯三維波紋鋼板混凝土殼體的微分平衡方程,建立了有限元計算模型,並採用三角函數法,求解了三維波紋鋼板混凝土拱型復合結構在分佈荷載和集中荷載作用下的位移響應和應力響應,並與普通殼體進行了比較。Steel for the prestressing of concrete - part 2 : cold - drawn wire
混凝土預應力鋼筋.第2部分:冷拉鋼絲As a whole, the research work of this dissertation can be summarized follows : 1. in accordance with my design patent, namely, reinforced earth retaining wall of r c net, and based on the analysis of the work mechanism, failure pattern, bearing capacity and stability of the reinforced earth, a new concept is expounded, namely, the reinforced earth wall which is thought of as a compound structure increase not only c but also ~ in comparison with non - reinforced earth. some bearing capacity formula are first introduced under the circumstances that the reinforced earth wall fails because of the breakage of material or inadequate cohesion between reinforcements and soil
歸納起來,具體的研究和所獲得的一些重要成果如下: 1 、結合本人的設計專利? 「鋼筋混凝土網格式加筋擋墻」及工程實踐,在對加筋土的加筋機理、破壞模式、承載力和穩定性等方面進行深入分析的基礎上,提出了一個新概念,即經過加筋后的土體作為復合結構與原土體相比,不僅提高了內聚力,而且也提高內摩擦角;並在此前提下首次導出拉力破壞和粘著破壞兩種情形下的承載力公式,然後進行了穩定性分析。To measure the tensile strength of hot rolled bars, steel wire and weld strength of steel
測試熱軋鋼筋、鋼絲和扁鋼抗拉力強度和焊接強度For example, high strength reinforced bar, stainless steel medium plate, auto wheel rim steel and so on
高拉力螺紋鋼筋,不銹鋼中板,汽車輪網鋼等。High tensile deformed steel bar
高拉力異形鋼筋Two serving and one former staff members of the main contractor for a home ownership scheme construction project at wang tau hom estate phase 14 in connection with the alleged use of reinforcement ste
廉政公署拘捕了橫頭?第十四期居者有其屋建築工程總承建商的兩名地盤雇員及一名前職員,懷疑他們使用未能通過檢定測試的高拉力鋼筋花鐵建造居屋上蓋。A former site administrator of the main contractor for a redevelopment project at wang tau hom estate was sentenced to 120 hours of community service for conspiracy to defraud the housing department in relation to the disposal of non - compliant reinforcement steel bars at the site
橫頭?重建計劃總承建商的一名前地盤總務員,訛稱已將未能通過檢定測試的高拉力鋼筋運離地盤,串謀詐騙房屋署,被判須履行一百二十小時社會服務。When the soil - nailing is under operation, contrast between the actual pull force and the value calculated by current regulations is made
採用在土釘主筋上埋設鋼筋應力計進行土釘實際工作狀態下的拉力測試和把實測拉力與現行規程計算得出的結果作對比的研究方法。The main causes, which have effects on redistribution of internal force in the prestressed frame, including the relative height compressive zone of section, secondary moment and types of load applying are taken into account. the horizontal braces force which results from the tension of the prestressing steel, reduces the pre - compress stress is analyzed
並且探討了各影響因素對框架梁截面延性的影響和由於柱的抗側剛度在預應力鋼筋張拉時約束梁的軸向變形,從而影響預應力在梁中的建立所造成的梁中軸向預壓力的損失。In this paper, with the available computer method, theauthors have obtained the stress distribution acrosssections of reinforced concrete composite beams under two stages ofloading, and show that the stress redistribution under two stages ofloading results in a reduction of stress discrepancy in thetensile steel and of strain discrepency in the compressed concrete between thecomposite beam and the corresponding casting beam
本文運用成熟的電算模擬方法,計算得到二階段受力鋼筋砼疊合梁在不同受力階段的截面應力分佈規律及鋼筋的應力變化規律,分析得到二階段受力時鋼筋砼疊合梁1的受拉鋼筋應力超前、受壓區砼應變遲后逐漸緩解的實質為截面應力重分佈的結果En 524 - 5 steel strip sheaths for prestressing tendons. test methods. part 5 : determination of tensile load resistance
預應力鋼筋混凝土構件用鋼筋鞘管.試驗方法.第5部分:耐拉伸力測定In engineering construction, the unbonded tendons can be laid within moulding board like non - prestressed steel according to the designing requirements and can be tensioned and anchored when the concrete reaches designing strength
在施工時,無粘結筋可如同非預應力鋼筋一樣,按設計要求鋪放在模板內,待混凝土達到設計強度要求后,再張拉錨固。Using this new technology, there needs no the second tensioning of the prestressing tendons and temporary braces, thus the construction period and cost can be cut down obviously
該改造工程不需要對預應力鋼筋二次張拉和對結構進行臨時支撐,因而明顯地縮短了施工周期並節省了工程費用。The current approaches including code methods to calculate stress losses due to anchorage set exist several shortcoming, such as unsuitable to different profiles of tendons or very complicated to compute due to sectional analysis. based on classical theory of friction when tendons are stretched in post - tensioned concrete members, the unified method to calculate the stress losses in tendons due to anchorage set while considering the affection of reverse friction has been established, these formulae are suitable to be used in computer ; also approximate formulae are produced which are suitable to manual computation, they are easy to be applied in research or design
針對目前預應力鋼筋錨固時鋼筋回縮引起的預應力損失計算方法中存在的問題,建立了考慮反摩阻影響的后張法預應力混凝土橋梁錨固損失的統一計算式,適用於任意形狀的預應力鋼筋和單、雙端張拉的情形;給出了適于機算的理論公式和適于手算的近似計算式,可方便地應用於研究和工程實踐。Aiming at main project of the xiaoxihu bridge, a low pylon cable - stayed bridge, based on the existing theory and method of the bridge construction controlling theory, using the basic function of " ansys ", farther exploitation was done on concrete elasticity and creep calculating distinguishingly, nonlinearity analysis theory was used to construct the space model, the main beam, string pylon and abutment were simulated by the beam elements which was considered the shearing effect. which is worthy of considering that using the geometric non - linear truss elements to simulate the stayed - cable, form traveler is modeled as structure elements and participate in stress analysis. four stages are used to model the construction stage, which are : ( 1 ) the erection of form traveler ; ( 2 ) placing the segmental concrete ; ( 3 ) jacking the tendons ; ( 4 ) tensioning the stay cables
針對建設中的小西湖矮塔斜拉橋的主體工程,結合已有的橋梁施工控制的理論和方法,利用大型通用計算軟體ansys的基本功能,並著重在混凝土彈性計算及徐變計算方面做了相應的二次開發,採用非線性分析理論並建立了空間結構模型、用考慮剪切作用的梁單元模擬主梁、索塔和橋墩;用可考慮幾何非線性的桁元模擬斜拉索、施工掛藍作為結構單元進行拆裝,參與受力計算,整個施工過程按施工循環周期分為若干階段,每個階段又分為四個工況,即:空掛藍就位、澆築完畢階段混凝土、張拉預應力鋼筋和張拉斜拉索。分享友人