拉拔應力 的英文怎麼說

中文拼音 [yīng]
拉拔應力 英文
drawing stress
  • : 拉構詞成分。
  • : Ⅰ動詞1 (拉出; 抽出) pluck; pull out; pull up; draw; move 2 (吸出) draw; suck out 3 (選取 提...
  • : 應動詞1 (回答) answer; respond to; echo 2 (滿足要求) comply with; grant 3 (順應; 適應) suit...
  • : Ⅰ名1 (力量; 能力) power; strength; ability; capacity 2 [物理學] (改變物體運動狀態的作用) forc...
  • 拉拔 : [冶金學] draft; drawing拉拔力 pulling capacity; 拉拔模孔 draw hole; 拉拔強度 pull strength; 拉拔...
  1. Hard drawn steel wire for prestressed concrete

    混凝土用冷鋼絲
  2. Thedevelopment development hydraulic jack, the bearing heater, thebearing get up pulling out, the hydraulic pressure spanner, thehydraulic pressure pulls a horse, the hydraulic pressure small crane, nut broken cutting, the oil filter machine and the pipe bendingmachine and so on the advanced practical mechanical and electricalservice product has the world advanced level, the product and thetechnology widely applies to domain the and so on electric power, petrification, chemical industry, metallurgy, mine, spinning andweaving, papermaking machinery service department and the machinemanufacture unit, and in the daya bay nuclear power station, beijingsteel corporation, wuhan steel corporation, the baoshan steelcorporation, the daqing oil field, the victory oil field, the golmudoil field, the three gorges power plant, yangzi petrifies, qi and lupetrifies and so on in the national large and middle scale enterprisesand the project the comprehensive promoted use

    研製開發的液壓千斤頂,軸承加熱器、軸承起器、液壓扳手、液壓馬、液壓小吊車、螺母破切器,濾油機和彎管機等先進實用的機電維修產品有世界先進水平,產品和技術廣泛用於電、石化、化工、冶金、礦山、紡織、造紙等領域的機械維修部門和機械製造單位,並在大亞灣核電站、首鋼、武鋼、寶鋼、大慶油田、勝利油田、格爾木油田、三峽電站、揚子石化、齊魯石化等國家大中型企業和工程中全面推廣使用。
  3. Through direct pullout test, we examine the effect of the water to cement ratio, contend of steel fiber and silica fume on the bond behavior ; compare the bond behavior of two types of cfrp bars with difference surface treatment ( r1 bars and g1 bars ), and reprocess the one of inferior bond strength ; investigate the bond stress distribution along the bond length of cfrp bars, and assess the adequacy of some exist analytical models of bond - slip behavior to reproduce the experimental bond behavior

    本文主要通過直接試驗,考察水膠比、鋼纖維摻量、硅灰摻量以及cfrp筋的表面處理類型等材料參數對粘結性能的影響,並對粘結效果較差的cfrp筋研究了表面處理方法,以提高cfrp筋與rpc的粘結性能;通過在cfrp筋表面粘貼變片,測定了粘結沿cfrp筋埋長的分佈情況,並對現有的粘結滑移本構模型與試驗結果的擬合效果進行了比較。
  4. An interface analysis model was established based on the interface stress element method for discontinuous medium mechanical problem to simulate the pull - out tests and tensile tests, and the calculated results are in good agreement with those of experiments

    用解決不連續介質學問題的界面元法建立交界面的分析模型,對出試驗和伸試驗進行了數值模擬,數值模擬計算結果與試驗結果接近。
  5. It compares and analyses the equipment test voltage emendated to standard atmosphere conditions with the equipment nominal withstanding voltage. and then it concluded that : the emendation value educed by " humidity ratio " integrated emendation method is basically equal or close to the equipment nominal withstanding voltage ; but the values by two traditional emendation methods are mostly higher. it also proves that, " humidity ratio " integrated emendation method is more perfect than any other methods, and it can reflect the influence degree of atmospheric parameters on electrical equipment outer insulation discharge voltage actually

    文中選擇「比濕」綜合校正法和兩種傳統校正法,分別對西高所為羊八井、薩、羊湖110kv變電所設備所做的人工氣候室模擬試驗數據及雲南中試所做的zs - 110工頻放電電壓試驗數據進行校正計算,將試驗電壓的校正值與試驗設備的標稱耐受電壓水平進行比較分析;認為: 「比濕」綜合校正法的校正值與設備耐受電壓水平基本相等或接近,而兩傳統校正法的校正值大多高於設備耐受電壓水平;進一步證明, 「比濕」綜合校正法是目前諸多校正法中較為完善的,能真實地反映大氣參數對電氣設備外絕緣放電電壓的影響程度的校正法,在高海工程設計中推廣用。
  6. The mechanism of reinforcing steel bar under the press or pull is researched and the characteristics under the pull - press cyclic loading is studied in composite foundation. it shows that the stress concentrating on the reinforcing steel bar and the increasing stress can be seen with the increasing of cyclic times. residual strain always exists after unloading without considering the size of pullout force and increases slowly with the cyclic times

    探討了復合地基中抗鋼筋的受壓受機理及在壓循環荷載作用下的性狀,研究發現,隨壓循環次數的增加,向鋼筋集中,鋼筋承受的壓隨著增大;無論上大小,卸載后都有殘余變形,並隨著循環次數的增加而緩緩增加;抗碎石樁破壞性狀明顯,可明確的得到抗碎石樁的破壞荷載。
  7. The finite element stress analysis and assessment of drawing tube headers

    接管集箱的分析與安全評定
  8. Bearing capacity and displacement are two main problems in the application of geotechnical engineering. based on a series of pull - out tests using three kinds of paper and a sort of window screening as geogrid, twenty - seven in limit and several in working - stress geogrid - reinforced slope model tests designed through orthogonal principle have been conducted to have obtained the relationship between the bearing capacity and four factors ( i. e. reinforcement, angle of reinforced slope, the designed - length of reinforcement and the distance between layers of reinforcement ). the law of slope lateral ( horizontal ) displacement versus to the height of slope vary with external - load was derived from the model test data, and the main factor affecting the lateral and vertical displacement of geogrid - reinforced slope was obtained through analysis

    承載(強度)和變形是巖土工程用領域的兩大主要問題,本文以紙和窗紗布模擬加筋土邊坡的土工格柵,在一系列試驗的基礎上,以正交設計理論分別安排27個極限狀態和若干個工作狀態加筋土邊坡模型試驗,並以模型試驗獲得的數據為依據,採用誤差、極差及回歸分析方法,探討了加筋土邊坡承載與筋類、筋長、層間距、坡角4因素的相關關系,獲得了在外荷載作用下加筋土邊坡的側向位移隨坡高的變化規律(並進行了定性解釋)和坡頂的豎向位移特性,並分析其主要控制因素。
  9. The calculation results show that the stress distributing of the plug drawing tube is different because of different dies, the drawing force and pulling force are lager in arc die and the diameter and wall thickness are closer to the designing value in cone die

    計算結果表明,不同的模具,芯管的分佈不同,弧形模成型的與芯棒后較大,錐形模成型后鋼管的直徑與壁厚更接近設計值。
  10. In order to obtain the stress distributing rules of the forming process of short plug drawing tube and the differences of drawing force, pulling force and dimension precision under different dies, fe method was used and fe model of the plug drawing tube under different dies was built

    摘要為了獲得不同的模具下短芯棒管成型過程中的分佈規律以及不同模具對短芯棒、芯棒后和尺寸精度的影響規律,利用有限元的方法,建立了不同模具下短芯棒管成型的有限元模型。
分享友人