拉索利塔 的英文怎麼說

中文拼音 [suǒ]
拉索利塔 英文
la solita
  • : 拉構詞成分。
  • : Ⅰ名詞1 (大繩子; 大鏈子) a large rope 2 (姓氏) a surname Ⅱ動詞1 (搜尋; 尋找) search 2 (要; ...
  • 拉索 : inhaul cable; digging line; dragline
  1. These countries purchased us and canadian dollars, pounds sterling, deutsche mark, belgian and french francs, australian dollars, mexican pesos, argentine pesos, italian lire, danish and norwegian kroner, swedish kronor, japanese yen, austrian schillings, spanish pesetas, netherlands guilders, finnish mark, irish pounds, south african rand, brazilian cruzeiros, venezuelan bolivars and malaysian ringgits, aggregating $ 22008 million, in exchange for an equivalent amount of their own currencies

    這些國家購買美元、加拿大元、英鎊、德國馬克、比時法郎和法國法郎、澳大亞元、墨西哥比、阿根廷比、義大、丹麥克郎和挪威克郎、瑞典克郎、日元、奧地先令、西班牙比塞、荷蘭盾、芬蘭馬克、愛爾蘭鎊、南非蘭特、巴西克魯賽羅、委內瑞瓦和馬來西亞林吉特,兌換成各成員國本國的等值貨幣,總金額達220 . 08億美元。
  2. These countries purchased us and canadian dollars, pounds sterling, deutsche mark, belgian and french francs, australian dollars, mexican pesos, argentine pesos, italian lire, danish and norwegian kroner, swedish kronor, japanese yen, austrian schillings, anish pesetas, netherlands guilders, fi ish mark, irish pounds, south african rand, brazilian cruzeiros, venezuelan bolivars and malaysian ringgits, aggregating $ 22008 million, in exchange for an equivalent amount of their own currencies

    這些國家購買美元、加拿大元、英鎊、德國馬克、比時法郎和法國法郎、澳大亞元、墨西哥比、阿根廷比、義大、丹麥克郎和挪威克郎、瑞典克郎、日元、奧地先令、西班牙比塞、荷蘭盾、芬蘭馬克、愛爾蘭鎊、南非蘭特、巴西克魯賽羅、委內瑞瓦和馬來西亞林吉特,兌換成各成員國本國的等值貨幣,總金額達220 . 08億美元。
  3. The scenes depicted on the emunctory field, showing our ancient duns and raths and cromlechs and grianauns and seats of learning and maledictive stones, are as wonderfully beautiful and the pigments as delicate as when the sligo illuminators gave free rein to their artistic fantasy long long ago in the time of the barmecides. glendalough, the lovely lakes of killarney, the ruins of clonmacnois, cong abbey, glen inagh and the twelve pins, ireland s eye, the green hills of tallaght, croagh patrick, the brewery of messrs arthur guinness, son and company limited, lough neagh s banks, the vale of ovoca, isolde s tower, the mapas obelisk, sir patrick dun s hospital, cape clear, the glen of aherlow, lynch s castle, the scotch house, rathdown union workhouse at loughlinstown, tullamore jail, castleconnel rapids, kilballymacshonakill, the cross at monasterboice, jury s hotel, s. patrick s purgatory, the salmon leap, maynooth college refectory, curley s hole, the three birthplaces of the first duke of wellington, the rock of cashel, the bog of allen, the henry street warehouse, fingal s cave - all these moving scenes are still there for us today rendered more beautiful still by the waters of sorrow which have passed over them and by the rich incrustations of time

    二湖谷,基尼那些可愛的湖泊,克朗麥克諾伊斯487的廢墟,康大寺院,衣納格峽谷和十二山丘,愛爾蘭之眼488 ,特的綠色丘陵,克羅阿帕特里克山489 ,阿瑟吉尼斯父子股份有限公司的釀酒廠,夫尼格湖畔,奧沃卡峽谷490 ,伊,瑪帕斯方尖491 ,聖帕特里克鄧恩爵士醫院492 ,克爾岬角,阿赫爾羅峽谷493 ,林奇城堡,蘇格蘭屋,夫林斯頓的思唐聯合貧民習藝所494 ,圖莫爾監獄,卡斯爾克尼爾瀑布, 495市鎮樹林約翰之子教堂496 ,莫納斯特爾勃衣斯的十字架,朱里飯店,聖帕特里克的煉獄, 497鮭魚飛躍,梅努斯學院飯廳,柯洞穴, 498第一任威靈頓公爵的三個誕生地,卡舍爾巖石, 499艾倫沼澤,亨街批發莊,芬戈爾洞500所有這一切動人的501情景今天依然為我們而存在。
  4. According to the information concerned, the analogous structure were adopted on the alamilo bridge in sevilla, spain and on the curved cable - stayed bridge on golf court in xiaoye city, bingbu country, japan. at present, this kind of structure has not utilized all over the country yet. nanjing, the region of basic seismic intensity 7, is an unfavorable site for anti - earthquake in terms of geological conditions according to seismic code for buildings

    但是,主屬于傾斜高聳結構,拱屬于柔性拱結構,屬于特殊懸結構,經檢了解,西班牙sevilla的alamilo橋和日本兵庫縣小野市內高爾夫球場上的曲線斜橋採用過類似結構,國內目前尚未有此形態的結構記載,南京地區地震基本烈度為七度,地質條件按照建築抗震設計規范之規定,屬對抗震不地段。
  5. In the former, two computing modes of fem are built, aimed at the coupling of variable - profile pylon, curved - axis arch and flexible cable. the software algor feas is used to get the results of dynamic numerical analysis, such as natural vibration frequency, vibration mode, dynamic displacement, dynamic stress, which are compared with the results of shaking table test research to draw to important conclusions. these conclusions provide not only potent basis for the design and construction of nanjing century tower, but also reference for other pylon - cable - arch structures similar to the project

    在動態數值分析中,針對世紀變截面的身,曲線軸線的拱以及柔性相互耦合時清況,建立兩種有限元計算模式,用有限元軟體algorfeas得到動力數值分析的結果,如:自振頻率、振型、動位移、動應力等等,再和振動臺試驗研究成果作比較,得到一些重要的結論,從而為南京世紀工程的設計和施工提供強有力的依據,而且為類以於世紀工程的其它--拱結構的設計也提供一定的參考。
  6. This article will introduce at length the author ’ s labor in no back - stays & inclined pylon cable - stayed bridge, and hope to benefit to its further development and design

    本文將詳細的介紹作者在無背橋中所做的工作,希望有於無背橋的進一步發展。
  7. No back - stays & inclined pylon cable - stayed bridge is a new one. she has very prominent mechanical characters that it substitutes the deadweight of inclined pylon for the back stays force to counteract the girder deadweight of main - span

    無背橋結構體系新穎,其最大的受力特點是用傾斜的自重來平衡主跨主樑上的恆載和活載,而省去了背及其力。
  8. The theme get the integration between design of the large highway bridge in anqing and theory studying, carry out an research in emulating calculation of steel box beam cable - stay bridge. the theme used the transfer - matrix in solving computing of cable - stay bridge structure, got a improving in computing of cable and the load and landed of cable strength

    針對鋼箱粱斜橋的特性,論文確定了以控制箱粱梁端位移與內力為調整目標,用循環的正裝過程對斜橋的模擬進行計算,並對頂位移進行了良好的控制。
  9. On sunday, october 14, 2001, florida initiates attended the 6th annual vegetarian festival, sponsored by sarasota in defense of animals, a local non - profit organization dedicated to defending animal rights and welfare and supporting habitat protection

    2001年10月14日星期日,佛羅里達的同修們叄與了第六屆的素食節,這是一個由莎動物保護協會所發起的活動,該協會是一個地方性的非營組織,致力於保護動物的權福祉和棲息地。
  10. Stress response of the tower wall at the least favorable section of all of the single section on the cable tower anchor segments of the cable - stayed bridge was studied under the annular pre - stress with cable force and tensile force by comparing the experiment results of the full - scale model of segment with the results of the finite element simulation analysis according to the forced status of the cable tower under practical conditions

    摘要通過錨固區節段足尺模型試驗結果和有限元模擬分析比較,結合受力的實際工況,對異型截面斜錨固區節段最不斷面在環向預應力與力共同作用下壁的應力響應進行了研究。
  11. Firstly, the domestic researches, which have been reported, are introduced. then the characteristic of the system in estimation of prestressing losses is analyzed by theoretical method, and the reasons that the elimination of tendon is large and test results are not consistent are pointed. using fem software ansys, anchorage zone of pylon are analyzed

    論文首先介紹了國內現階段對該問題的一些研究成果,然後從理論上分析了小半徑大噸位環向預應力體系在計算預應力損失方面的特點和造成張伸長量偏大且實測的數據離散性較大的原因,並採用國際權威的有限元分析軟體? ? ansys從理論上進行分析和錨固區最不節段的足尺寸模型試驗進行校驗。
  12. Aiming at main project of the xiaoxihu bridge, a low pylon cable - stayed bridge, based on the existing theory and method of the bridge construction controlling theory, using the basic function of " ansys ", farther exploitation was done on concrete elasticity and creep calculating distinguishingly, nonlinearity analysis theory was used to construct the space model, the main beam, string pylon and abutment were simulated by the beam elements which was considered the shearing effect. which is worthy of considering that using the geometric non - linear truss elements to simulate the stayed - cable, form traveler is modeled as structure elements and participate in stress analysis. four stages are used to model the construction stage, which are : ( 1 ) the erection of form traveler ; ( 2 ) placing the segmental concrete ; ( 3 ) jacking the tendons ; ( 4 ) tensioning the stay cables

    針對建設中的小西湖矮橋的主體工程,結合已有的橋梁施工控制的理論和方法,用大型通用計算軟體ansys的基本功能,並著重在混凝土彈性計算及徐變計算方面做了相應的二次開發,採用非線性分析理論並建立了空間結構模型、用考慮剪切作用的梁單元模擬主梁、和橋墩;用可考慮幾何非線性的桁元模擬斜、施工掛藍作為結構單元進行拆裝,參與受力計算,整個施工過程按施工循環周期分為若干階段,每個階段又分為四個工況,即:空掛藍就位、澆築完畢階段混凝土、張預應力鋼筋和張
分享友人