拋石基 的英文怎麼說

中文拼音 [pāodàn]
拋石基 英文
pierre perdue
  • : 動詞1. (扔; 投擲) throw; toss; fling 2. (丟下; 拋棄) leave behind; cast aside; abandon
  • : 石量詞(容量單位, 十斗為一石) dan, a unit of dry measure for grain (= l00 sheng)
  • 石基 : ground mass
  1. Building can keep on the development ' s sill. strategy of its competition should for then grow the business enterprise technique creative the ability be used as the deviation of the core competition ability the gathering the strategy. and attain the firster is to set up the technique internationalization the principle on the ideaabandon big but the whole thought, technique is creative to up insist to have for have not for ; the seconder is organizes to up establish developments, produce, sale nimble mechanism in orientation market of integral whole ; the third is talented person grows to establish a systemses to move to rise the manufacturing to become an advantage the fleetnesses just of encourage the mechanism

    最後的結論是,慶鈴公司的發展要想邁上新臺階,構築可持續發展的,應將技術創新能力作為企業核心競爭力來培育,做到在觀念上樹立技術國際化理念、棄大而全思想,技術創新上「堅持有所為有所不為」突出重點的思維;在企業組織結構上建立開發、生產、銷售一體化敏捷適應市場機制;在人才培育上建立「雙軌制遷升制」形成一個有利快速成才的激勵機制。
  2. This paper expounds the necessity and key technologies for development of mechanized leveling, intelligentized detecting, major research route for the self - developed sit - on rubble bed leveling barge, together with its basic technical performance, leveling technology, and leveling quality, efficiency and precision

    摘要介紹拋石基床機械化整平、智能化檢測等工藝開發的必要性和關鍵技術,以及自主開發的坐底式拋石基床整平船的主要研製思路、本技術性能、整平工藝、整平質量、精度和效率。
  3. The monitoring result proved that although the surface settlement velocity was rather great during the initial phase of enrockment, the foundation still maintained firm based on the integrated analysis of lateral displacement, lamination settlement and pore water pressure measurement

    監測結果表明:盡管初期地表沉降速率很大,但綜合測斜、分層沉降、孔隙水壓力觀測結果分析,地依然保持穩定。
  4. According to many engineering blasting cases, in - depth analysis of underwater blasting mechanics, and discussion about the advantages of touch - ground charging for underwater rubble - mound foundation explosive compaction, it is proved that touch - ground charging method for explosive compaction results in good effect and is characterized by simple and feasible operation, and low cost, and thus well accepted by clients and construction units

    摘要通過大量的工程爆破實例,深入的水下爆炸機理分析以及觸地布藥方式在水下拋石基床爆炸密實優越性的討論,充分表明採用觸地布藥方式實施爆炸密實的效果良好,操作簡單可行,節約工程成本,並得到了業主、施工單位的肯定和好評。
  5. In order to make the best use of explosive energy in loosing soil or throwing it onto some area and ensuring the bottom meet some leveling requirements after blasting, a plane charge layout is often adopted according to blasting design and engineering quality requirements in open chamber blasting such as mine exploitation, field leveling and foundation pit excavation of construction

    摘要在礦山剝離、場地平整以及建(構)築物坑開挖等露天爆破中,為了充分利用炸藥能量將巖松動或擲到一定區域,並確保底板滿足一定平整度要求,按照爆破技術設計和工程質量要求,需要設計平面布藥結構。
  6. Rayleigh wave testing the dynamic compacted ground filling stones into the sea in shenzhen city

    深圳市填海強夯地的瑞雷波法檢測
  7. Jiye pcd die blanks for drawing wire can always be trusted ; your dies always get excellent polishing quality, producing wire with flawless surface finish

    業cd聚晶金剛拉絲模坯擁有非常了的光質量,能確保拉線的表面光潔度。
  8. The incidence angle of laser beam and other factors have been found to result in more effective polishing, with optimal best smoothing observed at incident angles of 75 ?

    探討了激光切割和光金剛膜的本規律,詳細探討論述了激光的工藝參數對光效果和光效率的影響。
  9. Analysis and control of compaction by blasting to construct deep water rubble - mound foundation

    深水拋石基床爆夯施工影響分析及其控制
  10. Gunagzhou panyu rongxiang faucet co., ltd. was opened in 1998, the new factory locates in shiji town panyu district guangzhou city, the area is 1, 5000 square meters. it has more than 800 staff and 18 professional workshops now. they are founding workshop, forging workshop, punching workshop, cnc workshop, claming workshop, soldering workshop, polishing workshop, assembling workshop, mould workshop, polishing workshop, electroplated workshop, test workshop etc. we have the ability to work in pineline from casting, forging machining step to polishing and plating step

    廣州市番禺榮祥水暖器材有限公司創建於一九九八年,廠區位於廣州市番禺區鎮,佔地15000平方米,主要以生產陶瓷閥芯和水暖器材配件為主,現有員工八百多名,擁有鑄造車間(分為引鑄和砂鑄) 、鍛壓車間、沖壓車間、數控車間、鉗工車間、焊接車間、光車間、彎管車間、模具車間、新產品試制車間、電鍍車間、試驗車間、檢測車間、裝配車間等十八個專業車間,具備了從鑄造、鍛沖壓、機加工到外表層光電鍍一條龍的生產能力。
  11. The temperature properties conditions of a traditional embankment and a ripped - rock embankment were contrasted by laboratory experiments

    通過室內試驗研究了在相同溫度邊界條件下普通路護坡路的溫度分佈特徵,對比分析了兩種路結構的溫度差異。
  12. Results showed that the temperature distribution of the traditional embankment was asymmetrical ; the asymmetrical status was changed after ripped - rock revetment was installed and the soil under the ripped - rock was cooled obviously ; the ripped - rock revetment could cool embankment and adjust the temperature difference between the north - facing slope and the south - facing slope ; the ripped - rock revetment was an available technique to protect embankment from thawing settlement and longitudinal cracks in permafrost regions

    結果表明:普通路的陰陽坡兩側溫度分佈極不對稱;鋪設護坡后,這種狀況得到了很大改善,並且護坡下土體溫度明顯降低;護坡能夠降低路溫度和調節路陰陽坡的溫度差異;護坡是多年凍土區防治路融沉和縱向裂縫病害的一種可行措施。
  13. Precision processing of ceramics is basically achieved equipped with surface grinder, internal and plain grinder, centerless grinder, biplanar grinder, mechanical diamond polisher, etc

    目前有平面磨床,內外圓磨床,無心磨床,雙平面研磨機,機械鉆光等設備,本滿足了對陶瓷的精加工。
  14. Abstract : a brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units

    文摘:介紹三峽工程的科研項目,綜述三峽工程開工以來的主要科研成果及工程應用情況,包括:一期土圍堰礎處理與施工技術;大江截流上下游土圍堰平墊底研究;二期圍堰防滲工程研究;大江截流計算機科學管理;大壩混凝土澆築方案及主要施工機械選型;混凝土的原材料和耐久性優化試驗研究;大壩礎深層抗滑穩定研究;三峽電站進水口型式研究;鋼襯鋼筋混凝土引水管道研究;蝸殼打壓、廠壩間伸縮節問題研究;永久船閘的引航道布置、輸水系統及水力學、高邊坡穩定、混凝土襯砌墻的結構與支護研究;特大型水輪發電機組的科學研究。
  15. A brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units

    介紹三峽工程的科研項目,綜述三峽工程開工以來的主要科研成果及工程應用情況,包括:一期土圍堰礎處理與施工技術;大江截流上下游土圍堰平墊底研究;二期圍堰防滲工程研究;大江截流計算機科學管理;大壩混凝土澆築方案及主要施工機械選型;混凝土的原材料和耐久性優化試驗研究;大壩礎深層抗滑穩定研究;三峽電站進水口型式研究;鋼襯鋼筋混凝土引水管道研究;蝸殼打壓、廠壩間伸縮節問題研究;永久船閘的引航道布置、輸水系統及水力學、高邊坡穩定、混凝土襯砌墻的結構與支護研究;特大型水輪發電機組的科學研究。
  16. This paper introduces the application of high density resistivity method to detect the interface batween stone and earth in yuhuan county, zhejiang province and describes its basic working principles on electrodes arrangement, data collection and data processing, as well as, how to determine the interface of stone and earth

    摘要敘述了高密度電法在某海堤堵壩體與土層分介面探測中的應用,介紹了高密度電法電極排列、數據採集、資料處理等的本原理及其對土分介面的確定。
分享友人