geo-engineering 中文意思是什麼

geo-engineering 解釋
地球工程學
  • geo : n. 〈蘇格蘭語〉 海灣。
  • engineering : n. 1. 工程(技術),工程學。2. 開車技術。3. 土木工程,工事。4. 操縱,管理。
  1. The geotechnical engineering office ( geo ) of the civil engineering department tomorrow ( novmber 4 ) will open a six - day exhibition on slope safety and maintenance at kwai shing east shopping centre, kwai shing east estate, kwai chung

    土木工程署轄下土力工程處將于明日(十一月四日)起一連六天,在葵涌葵盛東?葵盛東商場舉行斜坡安全及維修展覽。
  2. The engineering geology condition from the sections of xiangshou county of shiping to dashizhui of hejin of the yellow river were introduced from the aspects relating to geology such as geo morphy, geologic structure, stratum and earthquake were introduced in the paper and the preliminary opinions on the problems of navigation development work were also proposed in the paper

    從地貌、地質構造、地層、地震及有關地質現象等方面,介招黃河石坪(鄉守縣)至河津(大石咀)段工程地質狀況,對該河段在航運開發工作中的問題提出初步意見。
  3. In this paper, the engineering properties of gypsum, especially, the engineering properties of weathered mud - stone and geo - synthetics before and after soaking by acid water are discussed in detail

    本文對鹿寨磷石膏、風化泥巖和土工合成材料經酸性磷石膏渣漿水浸泡后的物理力學性質進行了較為詳細的試驗研究。
  4. ( 2 ) respectively by elastic theory analyses and methods of structural mechanics, transverse static analytical equations for flexible pipeline rigid pipeline are established whose outcomes are applied in numerical example to compare those with that by finite element method. ( 3 ) considering interaction of filled soil, pipeline and foundation, with an eye to non - linear soil model, in view of the initial geo - stress field and the effects of interface between soil and pipeline, and by finite element method the calculational model and method are built for transverse stress in pipeline. then, by the great finite element analytical software ansys, those outcomes are applied in calculation example of positive buried pipe to educe the distribution of circumjacent soil pressure and stresses on cross section and to compare it with that calculated by conventional ways before those outcomes are applied in engineering case of positive buried pipe with flexible filled materials to confirm distribution of soil pressures after the measure for reduction and to compare it with measurements. as a result, the model set up in this paper is proved to be applicable after all above - mentioned analyses

    本文基於彈性理論和有限元原理與方法,分析了上埋式地下管道橫向力學計算方法和性狀並探討了上埋式地下管道的減荷等問題: ( 1 )在分析現有幾種典型的管道垂直土壓力計算方法的基礎上,探討了影響垂直土壓力的主要因素以及改進的方法; ( 2 )分別通過彈性理論分析法和結構力學的方法,建立了地下管道柔性圓環和剛性管涵的橫向靜力計算方程,並應用在算例中,把所得結果和有限元方法所得結果進行對比分析; ( 3 )考慮填土、管道和基礎的共同作用、土體的非線性特性、初始應力場以及土體和管道的接觸面因素的影響,利用有限元的思路,建立了地下管道橫向力學有限元計算模型和方法,並且採用大型有限元分析軟體ansys ,針對上埋式管道工程算例,得出了管周土壓力以及管道橫截面應力的分佈狀況和規律,並和理論值進行對比;針對施加柔性填料的上埋式管道工程實例,得出了減荷后的土壓力分佈,並和實測值進行了對比。
  5. It can evaluate the quality of marine geo - environment by performing a multi - means, multidisciplinary integrated analysis of the quality of the geo - environments such as the seawater environment, sedimentary environment and engineering geological conditions, and can also forecast the developmental trend of the marine geo - environment

    通過對海域的海水環境、沉積環境、工程地質條件等地質環境品質進行多手段、多學科的綜合分析研究,可以評價海洋地質環境品質現狀,並預測其未來發展趨勢。
  6. Furthermore, we are concerned that there was a significant number of slope failures involving new slopes which had not been subject to proper geotechnical control, and the practice of allowing the works departments the discretion of not making geotechnical submissions is at variance with the stated intention of the geotechnical engineering office ( geo ) that all the new slopes are subject to its geotechnical control

    此外,委員會關注到,涉及未受適當巖土工程管制的新斜坡的崩塌事故為數眾多,而且準許工務部門自行決定不呈交巖土工程設計文件的做法,與土力工程處所述的意向,即規定所有新斜坡均須由該處實施巖土工程管制有分歧。
  7. In this thesis, study on engineering project administration method reform, applying scientific administration and engineering specialty theory knowledge under the guidance of modern project administration theory and strategy, a useful investigation and research on engineering project administration method reform is set off. the analysis and research is mainly focused on organizational structure guarantee as well as administrative method reform and technical measure improving for three great goal ( quality, cost and progress ) control in engineering project administration. the organizational structure selection scheme which aims to geo - engineering project administration as well as systematic and whole progress administration theory method and technical way of engineering project quality, cost, progress is presented

    《工程項目管理方法改革研究》一文在現代項目管理理論和方法的指導下,運用科學管理與工程專業理論知識,對工程項目管理方法改革展開了有益的探索和研究,著重分析研究工程項目管理在組織機構保障方面及三大目標控制(質量、成本和進度)方面的管理方法改革和技術措施改進,提出了適宜於地學工程項目管理的組織結構選擇方案和工程項目質量、成本和進度的系統化全過程管理理論方法和技術途徑。
  8. The geotechnical engineering office ( geo ) of the civil engineering department ( ced ) will open a six - day exhibition tomorrow ( november 18 ) on slope safety and maintenance

    土木工程署轄下土力工程處將于明日(十一月十八日)起一連六天,在葵涌石蔭?石蔭商場舉行斜坡安全及維修展覽。
  9. The geotechnical engineering office ( geo ) of the civil engineering department ( ced ) tomorrow ( september 1 ) stages an exhibition on slope safety and maintenance for six days at po tat shopping centre, po tat estate, kwun tong

    土木工程署轄下土力工程處將于明日(九月一日)起一連六天,在觀塘寶達?寶達商場舉行斜坡安全及維修展覽。
  10. The main results can be taken as the basic data and the theoretical proofs to evaluate cavities stability and guide the correct excavation. ( 5 ) relating closely to the engineering geological condition and the project design of the underground cavities in the right side bank of xiluodu, the effects of rock mass qualities, initial geo - stress f

    ( 5 )密切結合溪洛渡右岸地下廠房洞室群的工程地質條件和工程設計,首次深入地討論了圍巖質量、初始地應力場、開挖順序對大型地下洞室群圍巖穩定性的影響。
  11. Upgrading of geo raingauge system for civil engineering and development department

    土木工程拓展署之山泥傾瀉預警及雨量監測系統升級
  12. The geotechnical engineering office ( geo ) of the civil engineering department will tomorrow ( october 16 ) stage a four - day exhibition on slope safety and maintenance at shek lei shopping centre phase 2, shek lei ( ii ) estate, kwai chung

    土木工程署轄下土力工程處將于明日(十月十六日)起一連四天,在葵涌石籬(二) ?石籬商場第二期舉行斜坡安全及維修展覽。
  13. The author proposes a national strategic target, countermeasures and actions for geo - hazard mitigation, emphasizes the establishment of a partnership for geo - hazard reduction strategy among the government, scientific and technological communities, engineering enterprises and pubic society and promote the change of the concept of disaster mitigation from controlling geo - hazards passively to developing the geo - environment in a scientific and sustainable way

    提出了國家地質災害減輕戰略目標、戰略對策和減災行動,強調建立政府、科學技術界、工程企業界與公眾社會「四位一體」的減災戰略「夥伴」關系,推動減災理念從被動防治向科學開發地質環境的轉變。
  14. Based on geo - technical engineering and materials engineering and using the modern testing technology, this paper analyses the mechanism of the strengthen soils

    基於巖土工程學和材料學,運用現代測試試驗技術,對水泥、石灰類加固土的加固機理進行了詳盡分析。
分享友人