挖土工人 的英文怎麼說

中文拼音 [gōngrén]
挖土工人 英文
navvy
  • : 動詞(用工具或手從物體的表面向里掘取) dig; excavate; scoop
  • : Ⅰ名詞1 (工人和工人階級) worker; workman; the working class 2 (工作; 生產勞動) work; labour 3 ...
  1. On this foundation the article inducts in detail the method which is based on the relative settlement of calculating unit area end support ( qb ) force at the same time considering the feature of pedestal pile ' s " arch effect " the article introduces conception of pile effective length and finally obtain t he formula of calculating man - made pipe with bulb - shaped axial carrying capacity. the article uses marc program to calculate and analyze foundation soil ' s stress and displacement and gets the change curve chart and the proportion that is shared by king - pipe side soil friction resistance and pipe end counterforce respectively. the article inducts the structure of pedestal in detail on the basis of generalizing pedestal application cases of many countries

    在此基礎上論文詳細歸納了以相對沉降為依據確定單位面積端承力q _ b的計算方法,並考慮擴底樁的「拱效應」特點引入了有效樁長的概念,最後結合公路規范推出了比較實用的孔擴底樁軸向承載力計算公式。論文運用了marc程序對地基的應力和位移進行了有限元數值計算分析,得到了地基的應力和位移場的變化曲線和在加載過程中樁側摩阻力和樁端反力各自所承擔的比例;本文還在總結各國孔擴底樁應用情況的基礎上就擴底樁的構造進行了詳細的歸納。
  2. On the basis of the others, according to the constructional feature of the constitution of the composed soil nails, the computation mode of the he strut frame made of composed soil nails was set up to analyze the distortion of the he strut frame made of composed soil nails when it is stressed. with the engineering data, the strut frame made of composed soil nails is analyzed with the program ababqus, and the effects of the distortion characters, the property of the deposition of the ground, the mechanical property of the soil nails, the variation of the length and the separation of the soil nails, and the diametric of the mixing piles on the strut frame made of composed soil nails, and the distortion property of the strut frame made of composed soil nails under different ground conditions

    在總結前的研究成果下,針對復合釘墻構造的特點,建立了模擬復合釘墻受力變形的計算模型,並結合程實測資料,運用大型通用有限元程序ababqus對復合釘墻進行了有限元分析,詳細討論了復合釘支護結構開過程中的變形特性、地面沉降性狀、釘受力性狀;釘長度變化、釘間距變化、攪拌樁樁徑變化對復合釘支護結構的影響;復合釘支護結構在不同地基條件下的變形特性。
  3. To seek for an optimum plan that properly integrates land resources and taps potential new senses of pride in urban economic development by respecting the history of industrial development and reflecting the scene of modernization in beijing, beijing municipal commission of urban planning and beijing municipal bureau of state land & resources are hereby inviting worldwide urban planning / design firms experienced in property, development, urban planning, urban design, landscaping and track transport design, or joint ventures of such firms, to apply for prequalification, which, as conducted by experts and government agencies organized by beijing municipal commission of urban planning and beijing municipal bureau of state land & resources, is intended to determine about six firms or joint ventures as participants

    為了使北京焦化廠業遺址保護與開發建設的規劃能夠在尊重北京業發展歷史和展現北京現代化發展風貌的基礎上,通過地資源的合理整合,掘城市經濟發展的新亮點,找到一個最佳的建設規劃方案,現北京市規劃委員會和北京市國資源局面向全球范圍,公開邀請具有地產開發、城市規劃、城市設計、景觀設計、軌道交通設計經驗的規劃設計機構或由上述機構組成的聯合體前來參加應征資格預審,由北京市規劃委員會和北京市國資源局組織專家、政府有關部門進行資格預審,通過資格預審選取6名左右應徵或聯合體應徵參加徵集。
  4. A rare statue of the ancient thracian hero orpheus has been unearthed in bulgaria, near a place archaeologists say might house the hero ' s tomb, the leader of excavations said

    希臘神話傳說中的古代色雷斯英雄俄耳甫斯的一件珍貴的雕像近日在保加利亞被掘出,現場作的負責表示,考古學家們認為在出地點附近可能還埋藏著他的墳墓。
  5. He said an engineer was digging up bogland last week to create commercial potting soil somewhere in ireland ' s midlands when, " just beyond the bucket of his bulldozer, he spotted something.

    他說上周一個為了製作商用陶,用掘愛爾蘭中部的一個泥塘,結果在鏟斗前看見了一個東西。
  6. He said an engineer was digging up bogland last week to create commercial potting soil somewhere in ireland ' s midlands when, " just beyond the bucket of his bulldozer 14, he spotted something.

    他說上周一個為了製作商用陶,用掘愛爾蘭中部的一個泥塘,結果在鏟斗前看見了一個東西。
  7. Secondly, this paper made some theoretic researches on its engineering classfication and applicable scope for this technology ; then combining with project example, this paper carried out scheme design for this technology, and compared some different kinds of underpinning scheme and node and structure design, and put forward the method of " reinforcce steel bar through column " to build pile cap beam, " resistant bend and shear anchored reinforce steel bar " to strengthen column consolidation effect, and the method of " steel plate hoop " to build reinforcing bar connection of the foundation beam, etc. in the process of the consturction scheme research and implement, this paper synthetically elaborated the organizaton for project construction, put forward the construction technical measure of specific aim on the artificial pile, and pile cap beam, and underground adding layer and structure stabilization, and overall structure stabilization and so on. for this project, adopt reinforcing bar concrete to brace hole wall to ensure the safety of engineering in the artificial pile construction, use flexible connection catch to make the cage hoisting easier to simplify the construction process, use the method of earthwork statified symmetrical balance in the process of underground adding layer excavation

    本文首先對于基礎托換與結構加固技術的目的和意義、國內外發展狀況進行了綜合闡述;其次對該項技術程分類及適應范圍進行了理論上的分析研究;然後結合程實例對該項技術進行了方案設計,對比幾種不同的托換方案和節點及構造設計,提出了「通筋穿柱法」做承臺梁, 「抗彎抗剪錨筋法」強化柱加固效果, 「鋼板箍法」做地基梁鋼筋連接點等多項技術;在施方案的研究和實施過程中,對于程施組織進行綜合闡述,並就孔樁、承臺梁、地下加層及結構加固、整體結構穩定等專項施方案提出有針對性的施技術措施,孔樁施採用鋼筋砼護壁確保孔樁的安全成型,使用柔性連接鉤進行鋼筋籠吊裝簡化施序;承臺梁施採用梁主筋橫穿柱身化學膠錨固等;地下加層綜合施技術採用方分層對稱平衡開,分段做筏基結構自穩等;最後對于該程實施后的效果分析,說明該項綜合施技術的可行性。
  8. The contributions in this monograph may be valuable for the scientists and engineers engaged in spatial data mining, computer science, geomatics, geographical information system ( gis ), remote sensing ( rs ), global positioning system ( gps ), data analysis, artificial intellengence, cognitive science, spatial resources planning, land science, hazads prevention and cure, management science and engineering, decision making, and so on, and can also be used as a reference book for undergraduate students and graduate students

    本書可供空間數據掘、計算機科學、地球空間信息科學、地理信息系統( gis ) 、遙感( rs ) 、全球定位系統( gps ) 、數據分析、智慧、認知科學、空間資源規劃、地科學、災害防治、管理科學與程和決策支持等領域的研究員和開發員使用,亦可作為高等學校相關專業的本科生、研究生教學用書和參考用書。
  9. Whole days have i passed in these titanic efforts, considering my labor well repaid if, by night - time i had contrived to carry away a square inch of this hard - bound cement, changed by ages into a substance unyielding as the stones themselves ; then to conceal the mass of earth and rubbish i dug up, i was compelled to break through a staircase, and throw the fruits of my labor into the hollow part of it ; but the well is now so completely choked up, that i scarcely think it would be possible to add another handful of dust without leading to discovery

    我整天都做著這種非力所及的作,如果到晚上我能下一寸見方這種堅實的水泥,就認為自己是很不錯的了。你知道,這種水泥,由於年代已久,簡直如同石頭一般難。然後,我又得把出來的大量泥灰沙藏起來,我不得不掘通一條樓梯,把它們扔到樓梯底下的空隙里。
  10. The workman and his wife from the west country are busy digging to make bricks of the kiln

    西鄉來的和他的妻子正忙著替磚窖
  11. Side - slope greening is art important measure to ecological remediation and soil and water erosion prevention for artificial side - slopes

    摘要邊坡綠化防護是對建設形成的各種坡面進行生態修復以及防止水流失的一項重要措施。
  12. Have bore stage car, grab, fork - lift truck, self - propelled to bridge machine, booth shop machine, roller, bulldozer, land leveler, tong carries car of stage of build by laying bricks or stones of line of pump, hydraulic pressure, crane, complete station the construction such as appearance, ride meter, dynamo and detect professional equipment 850 ( set ), technology of average per capita equips twenty - five thousand eight hundred yuan

    擁有鉆孔臺車、掘機、裝載機、自行式架橋機、攤鋪機、壓路機、推機、平地機、砼輸送泵、液壓襯砌臺車、吊車、全站儀、測震儀、發電機等施及檢測專業設備850臺(套) ,均技術裝備2 . 58萬元。
  13. The enterprise schaefer wilhelm gmbh is well - known and engaged not only in mannheim, but also in the specialized industries of its sphere of activity, with imports, importer, spare part service and at the same time with rush service, dumpers and earth - moving machinery a competent partner

    Schaefer wilhelm gmbh是一家現代化的、可靠的專門產品供應商,這家供應商從事掘機,翻斗車,快速服務,備用品服務,總進口商,進口貨、輸入物,進口商,業機械,緊湊型掘機,履帶式裝載機,爬行車焊縫,牧羊,服務維修,程機械,運輸技術的製造、銷售。
  14. With the rapid development of economy, large area of bare grounds, which are also called the man - made damaged surfaces, appeared in the process of large - scale construction and mining

    隨著我國經濟建設的不斷發展,大規模的基礎建設及礦業生產過程對地表巖體的開移動已形成了大量的裸露面,即地表創面。
  15. On the basis of analyzing factor ( soil particle composition, soil bulk density, water stable aggregate content, antecedent soil moisture, slope gradient, rain intensity, accumulation depth and soil crust, soil and water conservation tillage measures ) affecting soil infiltration rates, several relation models was obtained ; analyzed in detail different soil and water conservation tillage measures intensifying infiltration rates, while there have the same rainfall condition, the increasing infiltration rates of contour tillage and artificial digging and artificial hoeing in gully areas of loess plateau are 67 % and 41 % and 29 % ; the increasing infiltration rates in hilly areas of loess plateau is 45 % and 22 % and 14 %

    在相同的降雨條件下,黃高原溝壑區等高耕作與直線坡相比,可提高入滲67 ,可提高入滲41 ,鋤耕可提高入滲29 ;黃丘陵溝壑區等高耕作可提高入滲45 ,可提高入滲22 ,鋤耕可提高入滲14 。並根據黃高原超滲產流的概念和水量平衡方程,建立了不同水保持耕作措施強化入滲速率模型。
  16. 2. on the basis of analyzing experimental data for slope land of loess plateau in different slope gradient and rain intensity and soil and water conservation tillage measures, using curve - fitting techniques, a soil infiltration rates model was woke out, the accuracy of the model is tested by a series of experiment data, the result of these indicate that the soil infiltration rates model is accurate and has good stability for slope land of loess plateau. 3. using soil infiltration rates and runoff time and wetting frontal surface depth of soil infiltration reflect effect of factor affecting soil infiltration rates

    ( 3 )採用壤穩定入滲速率、坡面開始產流時間、壤濕潤鋒面下滲深度三個指標來反映坡耕地壤入滲影響(壤性質、壤初始含水率、地面坡度、降雨強度、積水深度、水保持耕作措施等)因素效用大小,建立了各因素與三個指標的關系模型,詳細分析了不同水保持耕作措施強化壤入滲的影響,其中等高耕作作用最為顯著,其次是鋤耕。
  17. Abstract : a design and construction method to a new - typed cofferdam is introduced. after its project application, such advantages are proved as less investment, high construction pace, less labour power and dredging river

    文摘:介紹一種新型圍堰的設計施方法.通過程應用證明,新型圍堰比採用傳統的圍堰不僅投資省,而且具有施進度快、節省力、不地、疏浚河道等特點
  18. The spokesman said issues in relation to tunnel construction, including loss and contamination of ground water, subsidence and blow - out, will be addressed by way of the use of an earth pressure balance tunnel boring machine which has been proven to be very successful in the construction of one of the most difficult sections of the west rail, the tsing tsuen tunnel

    九鐵發言指出,透過使用壓平衡隧道鉆機,可以解決各種建造隧道的問題,如地下水流失和污染、地沉降及泥漿從地底湧出等。西鐵即採用了相同的鉆機完成其中一項艱鉅的
  19. Work teams braved the rain and aftershocks of the earthquake to open roads between villages in chungliao, so that the taiwan power company could access these areas to repair damaged power cables. the blocked roads were finally cleared at about 3 : 00 am, at the cost of two broken mounting tracks on the excavators. when the team members left the mountain, the villagers wanted to express their gratitude to them for risking their lives to open up the roads, and they pooled some money to prepare a banquet

    在落石不斷的第一段時間,做作是非常危險的,最後為了打通中寮鄉內村莊的道路,以便讓臺電公司去修護電線,員在下雨以及餘震不斷之中,勉力作,連怪手的履帶都壞掉兩條,最後終于打通了阻絕的道路,那時已是凌晨三點了,員下山後,村民為了表達對員冒著生命危險打通道路的謝意,竟然集資辦了一桌飯菜,邀請吃飯。
  20. While excavating in pakistan, macchiarelli and a team of international scientists found drilled molars from nine adults discovered in a grave that date from 7, 500 to 9, 000 years ago

    報道說,通過在巴基斯坦的作,馬基亞切利和一支國際科研小組在一個墓穴中出的9名早期成年的臼齒上,發現了被鉆出來的小孔。
分享友人