挖坑道 的英文怎麼說

中文拼音 [kēngdào]
挖坑道 英文
mine
  • : 動詞(用工具或手從物體的表面向里掘取) dig; excavate; scoop
  • : Ⅰ名詞(道路) road; way; route; path 2 (水流通過的途徑) channel; course 3 (方向; 方法; 道理) ...
  • 坑道 : 1 [采礦工程] (井筒、平峒和巷道的統稱) gallery; adit; mine2 [軍事] (地下工事; 地下通道) (unde...
  1. In a second i had disinterred the box ; then, that it might not be known i had done so, i filled up the hole, threw the spade over the wall, and rushed through the door, which i double - locked, carrying off the key.

    不一會兒,我便出了那隻箱子,然後,為了不讓人知,我又填滿了那個,把那把鏟子拋到了墻外,沖到門口,把門牢牢地鎖上,帶走了那把鑰匙。 」
  2. Ensure that proper access is provided before entering any excavation and note the position of this access

    在進入之前,確認有適當地進出通並牢記其位置。
  3. Article 125. any constructor who engages in excavation, repairs or installation of underground facilities in a public place, on a roadside or in a passageway without setting up clear signs and adopting safety measures and thereby causes damage to others shall bear civil liability

    第一百二十五條在公共場所旁或者通修繕安裝地下設施等,沒有設置明顯標志和採取安全措施造成他人損害的,施工人應當承擔民事責任。
  4. Article 125 any constructor who engages in excavation, repairs or installation of underground facilities in a public place, on a roadside or in a passageway without setting up clear signs and adopting safety measures and thereby causes damage to others shall bear civil liability

    第一百二十五條在公共場所、旁或者通、修繕安裝地下設施等,沒有設置明顯標志和採取安全措施造成他人損害的,施工人應當承擔民事責任。
  5. This paper is based on the construction of jiangbei airport station of the chongqing no. 3 light railway, the control demolition applied to shallow covered and large foundation pit excavation under urban complicated condition is introduced

    摘要以重慶輕軌三號線江北機場站為例,介紹了城市復雜環境條件下淺埋隧、大基控制爆破施工方法。
  6. Red squirrels disappear inside trees, frogs go deep under the mud, and many other animals dig tunnels in the earth

    紅松鼠藏到樹裏面去了;青蛙鉆入泥土的深處。而許多其它的動物,則在地里挖坑道
  7. Red squirrels disappear inside trees, bears use caves, frogs go deep under the mud, and many other animals dig tunnels in the earth

    紅松鼠藏到樹裏面去了;熊利用洞穴'青蛙鉆入泥土的深處.而許多其它的動物,則在地里挖坑道
  8. The strength and stability of diaphragm wall are calculated respectively during different period ( digging period and application period etc ), according to different plans in choosing concatenation wall. it is proved that the support plan of excavation protection of meili garden is safe by introducing diaphragm wall and two horizontal steel supports. it is also proved that the total cost of that is low

    針對所選用的地下連續墻方案,分別計算了基期和使用期等不同受力情況地連墻的強度和穩定性,論證了美荔園深基採用地下連續墻和兩水平鋼支撐的基圍護方案是安全可靠的,其綜合成本也是經濟合理的。
  9. Through the practice of deep foundation top - down for youyou international square, some key construction techniques were introduced, including structure of bored and double stirring piles, down - top construction in high - rise buildings, top - down in low - rise buildings, protection of railways, methods for excavation

    摘要通過由由國際廣場深基逆作施工實踐,著重介紹了灌注樁加雙排攪拌樁止水帷幕圍護體系、主樓順作裙房逆作、電纜翻交、軌交通四號線保護、土施工等關鍵施工技術。
  10. In the demolition designing, using different demolition parameters according to the different external conditions with adopting a series of comprehensive shock absorption steps, the influence of excavation demolition on the outside construction is decreased to the least degree

    在爆破設計中,根據爆破點周圍不同的外部環境,採取了不同的爆破參數,並採用了一系列綜合減震措施,開爆破對隧及基周圍建築物的影響降低到很小程度。
  11. Dredging of an immersed tube tunnel trench to - 30mpd alongside the existing gravity structure seawalls would undermine the seawalls, the bases of which are around - 5mpd

    現有的重力式結構海堤的地基在主水平基準面以下約5米,沿海堤掘沉管隧至主水平基準面以下30米會削弱這些海堤。
  12. Construction options for the running tunnels on no. 3 line of guangzhou metro

    上跨既有地鐵盾構隧的深基支護技術
  13. At last, the law of deformation of pit bottom and surrounding surface in different stress state and in different excavating step is obtained, and the same to the saturatin g process of surrounding soil. to some extent, in predicting the deformation of surrounding soil and retaining structure in construction, in preventing the foundation pit accident from happening, in insuring the security of environment and regular use of pipes underground, and in giving advice to deep loess foundation pit engineering in practice, the conclusion is of theoretical and practical value

    得出了不同應力狀態下和不同開步驟時以及基周圍土浸濕過程中黃土深基底及基周圍地表的變形規律,所獲得的結論對于黃土深基施工過程中周圍土層及圍護結構的變形預測,防止黃土深基事故的發生及周圍環境的安全與地下管的正常使用,指導黃土深基工程的實踐具有一定的理論和實踐參考價值。
  14. The project involves trench excavation, construction of cable trough, cable laying, backfilling and reinstatement works and landscaping works

    工程包括掘、興建混凝土電纜槽、電纜鋪設、回填和修復工程、和景觀美化工程。
  15. 2. on the basis of the soil and water pressure and the lateral horizontal displacement in - situ investigation the force - resisting coefficient of soil layers are back - calculated. and it is less than that determinged form standard codes and the empirical values

    在基過程中,下一土體開對上一支撐的內力和位移有明顯的影響,揭示了經典法(假想梁法、山肩幫男法)的不合理性
  16. An open excavation or pit from which stone is obtained by digging, cutting, or blasting

    採石場通過掘、切割或爆破巖石來獲取石料的露天或洞
  17. The deep foundation excavatfon takes many methods of enclosure in city construction, today there are some immature experiences and lots of teaches on the prediction, prevetion and the control of environmental detrimental effects ( mainly uneven soil set outside foundation pit and effect on cityscape traffic, etc

    城市建設中的深基採用多種圍護形式,施工產生的環境病害(主要是外附近地表土層不均勻沉降及工程施工對路交通的干擾)預測及防治已有一些經驗,但教訓也不少。
分享友人