挖石機 的英文怎麼說

中文拼音 [dàn]
挖石機 英文
spader
  • : 動詞(用工具或手從物體的表面向里掘取) dig; excavate; scoop
  • : 石量詞(容量單位, 十斗為一石) dan, a unit of dry measure for grain (= l00 sheng)
  • : machineengine
  1. According to the multi - areas development strategy, the corporation has expanded its business to engineering and construction of all kinds of civil works, municipal and public works, marine works, dredging and reclamation works as well as manufacture and installation of hydraulic steelworks and electro - mechanical equipment, with the major annual capacity of 150 million m3 in earth and rock works, 15 million m3 in concrete production and placement, 10, 000 mw in installation of generating units, and 150, 000 tons in manufacture and erection of hydraulic steelworks

    根據多元化發展戰略,集團公司的業務范圍除水電工程總承包外,還將業務擴展到各類土木工程、市政工程、海事工程的設計、施工、械設備和金屬結構製造安裝等,核心競爭力進一步得到擴展和增強,形成了年完成土方開15000萬立方米、混凝土澆注1500萬立方米、發電組安裝1000萬千瓦、鋼結構製作安裝15萬噸的綜合施工能力。
  2. This is why a special tunnelling machine capable of excavating through both soft ground as well as hard rock was used. without this machine, the tunnelling would have to be done by cut - and - cover method, causing major traffic and environmental disruption. with this tbm, all these impacts can be avoided

    故此選用這臺既可在軟土又可在硬層運作的隧道鉆,避免以明隨填的方法開鑿隧道,免卻對交通及環境造成嚴重影響。
  3. Analysis of slope stability is one of the most important problems in geotechnical engineering. the stability of all kinds of natural slope, higeway, airport, refuse dump, dam, fill, excavation need to be analysed

    在土木工程中,邊坡穩定分析十分重要,如各種各樣的天然邊坡、高速公路、場、填埋場、土壩工程、各種填方、方工程等等都需要進行穩定分析。
  4. A rock - boring tool used in mining for sinking shafts

    鉆井一種在采礦中用來掘礦井時在頭上打孔的工具
  5. The supporting mechanism of pre - stress anchor is given in following sentences in this paragraph : make full use of sectional stability, put - up steel - net shot concrete to the stratified earth as the trench is being excavated, and by this means, the little liding of soil layers and small broken slumps of rock slopes can be avoided

    預應力錨板的支護理:充分利用巖土層自身或預處理的局部的穩定性,隨基坑開分層掛鋼筋網噴射砼,以避免土層幫片及巖邊坡小的節理破碎滑塌,並把土壓力傳給錨板,由錨桿集中受力,通過錨桿的錨固力平衡土壓力。
  6. Based on site investigation, this paper probes into the technical classification, main engineering characteristics, and construction technology for cemented pebbles, and recommends the construction technology of " dredging after loosening "

    摘要通過實地試驗,對膠結卵技術分類、主要工程特性、施工工藝等進行了分析研究。提出先採用械沖擊松動後用船清渣的「先松后法」的施工工藝。
  7. The yellow river water environment information management system is a computer network system covering the whole basin, the construction of which includes a computer network construction and software development. the software involves database, gis, and man - machine interface. the investment in the system is huge and the period of construction is long, thus, a good design is very important. the design schemes are summarized in this paper. according to the present computer technology, some new methods used in network design and software development are introduced, and it is suggested that expandability and opening of the system should be considered in system construction

    ?水電站輸水渠道地處地質結構比較復雜的地方,由於渠道建成投運的時間較早,且原設計的標準較低,糙率較大.在電站組已更新改造的情況下,若不進行輸水渠道潛改造,已難于滿足電站組的設計流量要求.經反復比較,決定採取減小渠道糙率的方案,對輸水渠道進行三面光護面加固防滲,增加過流,效果很好
  8. The key factors to make the slide is controlled to make the model be similar in geometry, material and fabric with the antetype, then simulate the infection of river, digging of road and so on, measure the data of the distortion of model, analyze the reason of the distortion and factors of the slide

    試驗抓住造成滑坡的主要因素,根據所得的巖力學參數及結構面參數,在幾何條件、模型材料、結構面條件等方面都基本滿足相似原理的情況下,對模型進行了河流下切、公路開等條件的模擬,測量觀察邊坡的卸荷回彈與層面的彎曲變形情況,利用所側數據分析論證滑坡的形成制和影響因素。
  9. Also speaking at the commissioning ceremony, kcrc chairman mr k y yeung noted that because of the mixed ground conditions along the tsing tsuen tunnel site, conventional tunnel - boring machine could not handle the job

    九鐵主席楊啟彥先生在啟動儀式上表示,由於青荃隧道所經的位置混合軟土及硬,傳統的隧道鉆並不適用。
  10. It provides advanced equipment and technology to the customers in china, and imports all kinds of construction machine such as bulldozer, excavator, wheel loader, motor grader, crane, dump truck, special vehicle, road compactor and maintenance equipment, asphalt mixer, crusher, concrete mixer and so on

    為中國的工程用戶帶來日本先進技術和設備,主要經營各類工程械設備:包括推土、裝載、平地、汽車起重、自卸車和各種用途車輛、路面路基壓實維護設備、瀝青灑布拌和設備、以及成套的碎設備、混凝土辦和設備。
  11. During the deep - hole blasting for the excavation of guishan quarry for construction of baoquan pumped storage hydropower station, the blasting powder factor and the charging concentration of the blasting powder in the rock are reasonably controlled, and then the rate of blasting chunk is greatly decreased with the reduction of the working amount of the boulder blasting afterwards in conjunction with the suitable excavator and crusher etc

    摘要在寶泉抽水蓄能電站工程龜山料場開的深孔爆破中,合理控制了爆破單位耗藥量和炸藥在巖中的集中度,最大限度地降低了大塊率,並結合使用適宜的開及破碎械等措施,從而減少了二次爆破工作量。
  12. Hard rock tunnel boring machine

    隧道鉆
  13. The simulation experiment on the granite rock of the shiplock has been carried out with computer, and then regard the media of the rock as elasto - plastic material and in the stress space, the general constitutive relation is described

    在研究中,對三峽船閘的花崗巖體運用flac3d進行了計算模擬試驗,將開類介質視為彈塑性,在應力空間中,給出了彈塑性本構關系的一般形式。
  14. “ can ' t we dig it out ? ” i asked after i hit it full speed with the lawn mower, breaking the blade

    「把它出來吧! 」當這塊頭把我除草上的刀片給碰壞時,我對丈夫說道。
  15. Abstract : xiao wan hydroelectric installation locate in the boundary between nanjian county and fengqing county of the western of yunnan province. the height of dam is 292 m, and its installed capacity is 4, 200, 000 kilowatt, so it ' s a large - scale water - power engineering. the height of excavation reach to 80 m. so it is sure, that the excavation will influence on the stability of the slop. the stability of the slop is the necessary condition to assure the trouble - free operation of the station

    雲南省瀾滄江小灣水電站位於雲南省南澗縣和風慶縣的交界處,最大擬建壩高292m ,裝容量420萬千瓦,屬特大型水電工程。左岸砂系統邊坡位於瀾滄江左岸8 ~ #山樑,主體開高度達80m ,開對邊坡的穩定性產生很大的影響。該邊坡的穩定性對水電工程建設的順利進行。
  16. Combining longshou waterpower station project the mechanism of rock excavation explosion and production test method are studied more completely

    本文結合龍首水電站工程,較全面地研究了巖爆破的理及生產試驗的方法。
  17. Combining of the information fusion with artificial neural networks, various testing information of fault symptoms could be fully used to diagnose the faults of tunnel boring system accurately

    摘要將信息融合技術與神經網路結合起來,充分利用檢測到的各種故障徵兆信息準確診斷巖系統的故障。
  18. The paper presents a detailed numerical analysis to elucidate the failure pattern of the pit wall, the mechanism of the soil - nailed supporting system and its spatial behavior. firstly, a typical two - layer sand - cobble deposit was chosen for a detailed 2d - fem study. it was shown that due to the distinct behaviors of the upper soft sand layer against the much stiffer lower cobble layer, a bi - linear plane failure was recommended to be used in the limit equilibrium analysis

    本論文對砂卵基坑噴錨網支護進行了數值模擬研究,主要研究內容包括以下四個方面: ansys有限元程序中土體本構模型以及分步開與支護計算模擬研究,砂卵基坑邊坡破壞模式研究,噴錨網支護理研究及空間性狀研究。
  19. This thesis expound the area geologic environment of the station and the engineering geologic environment of the slop. this thesis do a lot of survey and analysis about the structure of the rock mass and the destroyed phenomenon of the slop. lt analyse the formation of the destruction and expound the model of the destruction of the slop. on the basis of the analysis of the monitoring data, it expound the influence of excavation to the stability of the slop

    本文闡明了左岸砂系統邊坡區域地質環境,並詳細研究了邊坡的工程地質條件。對邊坡的巖體結構和已經產生的變形破壞現象進行了詳細的調查和分析,對邊坡破壞的形成制進行了分析,闡明了邊坡可能的變形破壞模式。在對監測資料進行匯總分析的基礎上,闡述了邊坡開對邊坡穩定性的影響。
分享友人