排土工程 的英文怎麼說
中文拼音 [bèitǔgōngchéng]
排土工程
英文
soil removal works-
In view of the natural conditions in loess area of gansu, in the light of investigation conditions of seepage of built loess and weak rock highway tunnels in this area and classification of water gushing conditions for railway tunnels, and by engineering analogism, the classification of tunnel water gushing types suited the structure design of highway tunnel waterproof and drainage, and the three methods for checking and subdividing water gushing types are presented
摘要針對甘肅黃土區的自然條件,依據該地區已建黃土及軟巖公路隧道滲漏水調查情況和鐵路隨道涌水狀態分類,運用工程類比法提出適合該地區公路隧道防排水結構設計的隧道涌水類型劃分及對涌水類型校核與細分的三種方法。The following are the large projects undertaking by haifeng company : crude oil electricity plant project of north china oil field hydroelectricity factory, apartment ( 22 stories ) of yuanda real estate company of dalian shipping group, helios hotel of helios group in dalian development zone, tilt aqueduct bridge of shanxi hongqi reservoir ( total span : 267m ), supply and sale building and city construction building ( both are antique architectures ) of shanxi heyang city, sea drainage pipe of hainan fudao fertilizer factory ( 1520 ), 8 oilgas docks of hainan haiyan oilgas company, basha condensable gas transfer station of haiyan company, 10, 000m3 oilgas storage tank of arco company ( usa ) in hainan nanshan, gas pipe and fuel gas installation project of hainan nanshan electricity co., ltd, base and accessory project of hainan gas company, bei da huang cereal and oil market in harerbin, hainan cross island pipe, changhuajiang river pipe crossing project, taihangshan mountain earthwork project ( the 19th section of west - to - east gas transmission project )
海南海峰公司承建大的工程項目:華北油田水電廠原油發電站工程;大連船泊集團遠達地產公司的遠達公寓( 22層) ;大連開發區香港太陽神集團的太陽神大酒店;陜西紅旗水庫斜拉渡槽工程(全跨267m ) ;陜西合陽供銷大樓及城建大樓(均為仿古) ;海南富島化肥廠排海管線( 1520 ) ;海南海燕油氣公司八所油氣碼頭;海燕公司白沙液化氣中轉站;海南南山美國阿科公司儲油氣萬立米大罐工程;海南南山電力股份有限公司天然氣管線及燃氣安裝工程;海南南海天然氣有限公司基地及配套工程;哈爾濱北大荒糧油批發市場;海南環島管線;昌化江穿越工程;西氣東輸十九標段,太行山土石方工程。From roundwood reservoir in county wicklow of a cubic capacity of 2, 400 million gallons, percolating through a subterranean aqueduct of filter mains of single and double pipeage constructed at an initial plant cost of 5 per linear yard by way of the dargle, rathdown, glen of the downs and callowhill to the 26 acre reservoir at stillorgan, a distance of 22 statute miles, and thence, through a system of relieving tanks, by a gradient of 250 feet to the city boundary at eustace bridge, upper leeson street, though from prolonged summer drouth and daily supply of 12 1 2 million gallons the water had fallen below the sill of the overflow weir for which reason the borough surveyor and waterworks engineer, mr spencer harty, c. e., on the instructions of the waterworks committee, had prohibited the use of municipal water for purposes other than those of consumption envisaging the possibility of recourse being had to the importable water of the grand and royal canals as in 1893 particularly as the south dublin guardians, notwithstanding their ration of 15 gallons per day per pauper supplied through a 6 inch meter, had been convicted of a wastage of 20, 000 gallons per night by a reading of their meter on the affirmation of the law agent of the corporation, mr ignatius rice, solicitor, thereby acting to the detriment of another section of the public, selfsupporting taxpayers, solvent, sound
但是由於夏季久旱,再加上每天供水一千二百五十萬加侖,水位已降到低於排水口。都市監察官兼水道局技官土木工程師斯潘塞哈蒂奉水道局的指示鑒于有可能會像一八九三年那樣被迫利用大運河和皇家運河那不宜飲用的水,除了飲用外,下令一律禁止使用市裡供應的自來水。尤其是南都柏林濟貧院,盡管限定用六英寸的計量器,每個貧民每日配給十五加侖水,然而在市政府法律顧問辯護律師伊格內修斯賴斯的監督下,經查表證實,每夜要浪費兩萬加侖水,從而使院外的社會各階層也就是自費並有支付能力的納稅者們蒙受損害。The paper is based on the construction of the express - highway between yiyang and changde in hunan province, aiming at enhancing the serviceability of cement concrete pavement, probing into the structural assemblage of the cement concrete pavement, the roadway drainage system, contraction joint with the dowel bar and precaution of bumping at the end of the abutment. it presents some achievements of the research, including more reasonable structural assemblage and roadway drainage system, the method of setting dowelled bar in contraction joint, putting forward the concept of stage - transition from rigid to flexile behind abutment
本文以湖南省益陽至常德高速公路項目為依託,以提高水泥混凝土路面使用性能為目標,就水泥混凝土路面結構組合、路面排水系統、縮縫設置傳力桿、橋頭跳車問題的防治等方面開展研究和工程實踐,取得了豐富的研究成果,如研究採用了更合理的路面結構組合,設置了較完善的路面排水系統,在國內高速公路上率先全面採用縮縫加傳力桿技術,對所有橋涵構造物臺背全部採用剛柔過渡技術處理橋頭跳車問題等。Layout is an important part of the sea reclamation works, which consists of for kinds of rational layout of the exploitation of the embanked area, the irrigation and drainage works, the sea exploitation work schedule and the silt acceleration work schedule. not only are the four kind layout works interrelated and interrestricted, but also they come down to many natural and society factors
圍海工程規劃是圍海工程重要組成部分,圍海規劃由圍區土地合理開發利用規劃、圍區排灌工程規劃、圍塗開發進度規劃和圍塗的促淤進度規劃組成,這四部分的內容不僅相互聯系又相互制約,而且還涉及到眾多的自然因素和社會因素。Specification for the deformation joint design of concrete structures in water work engineering
給水排水工程混凝土構築物變形縫設計規程The culvert is the works buried under the fillings, which is often used in hydraulics, communication, and water supplying engineering
涵洞是埋設在填土下的輸水建築物,它在水利、交通、供排水工程中被廣泛使用。Specification for structural design of buried prestressed concrete pipeline of water supply and sewerage engineering
給水排水工程埋地管芯纏絲預應力混凝土管和預應力鋼筒混凝土管管道結構設計規程Landslide hazard mitigation works including earthworks, installation of soil nail, concrete check dam and flexible boulder fence, drainage works and maintenance access road works
山坡災害防護工程,包括土木工事、裝設泥釘、擋土堤和柔性防石欄、排水工程和維修通道工程。Fundamental behavior and constitutive modeling of a cdg residual soil under undrained shear
不排水條件下全風化花崗巖殘積土工程特性與本構模型Tsing yi north coastal road, castle peak road and fan kam road ), drainage improvement works in yuen long and shenzhen river, site formation, slope works, landfill, reinforced fill works, reclamation, and work on rock tunnels and caverns
這些工務計劃包括了道路改善工程(例如青衣北岸道路、青山公路和粉錦公路) 、元朗及深圳河的排水渠改善工程、其他各類計劃的地盤平整及斜坡工程、填土及加筋填土工程、填海工程、開鑿巖石隧道及巖洞等。Bearing capacity and displacement are two main problems in the application of geotechnical engineering. based on a series of pull - out tests using three kinds of paper and a sort of window screening as geogrid, twenty - seven in limit and several in working - stress geogrid - reinforced slope model tests designed through orthogonal principle have been conducted to have obtained the relationship between the bearing capacity and four factors ( i. e. reinforcement, angle of reinforced slope, the designed - length of reinforcement and the distance between layers of reinforcement ). the law of slope lateral ( horizontal ) displacement versus to the height of slope vary with external - load was derived from the model test data, and the main factor affecting the lateral and vertical displacement of geogrid - reinforced slope was obtained through analysis
承載力(強度)和變形是巖土工程應用領域的兩大主要問題,本文以紙和窗紗布模擬加筋土邊坡的土工格柵,在一系列拉拔試驗的基礎上,以正交設計理論分別安排27個極限應力狀態和若干個工作應力狀態加筋土邊坡模型試驗,並以模型試驗獲得的數據為依據,採用誤差、極差及回歸分析方法,探討了加筋土邊坡承載力與筋類、筋長、層間距、坡角4因素的相關關系,獲得了在外荷載作用下加筋土邊坡的側向位移隨坡高的變化規律(並進行了定性解釋)和坡頂的豎向位移特性,並分析其主要控制因素。Specification for structural design of reinforced concrete sinking well of water supply and sewerage engineering
給水排水工程鋼筋混凝土沉井結構設計規程Based on the engineering geologic investigation reports of 22 buildings and the author ' s own tests in lab ( which includes 18 groups of conventional test and compression test, 8 groups of unconsolidated undrained triaxial test and 8 groups of quick direct shearing test ), taiyuan silt is studied in the paper. firstly, the variability of silt indexes is analyzed. the analyses results show the change laws on variability, in addition, the average value and variability coefficient ranges of silt indexes are given for reference
本文以太原地區粉土為研究對象,在收集、整理了22個建築工程場地勘察報告和作者室內試驗成果( 18組常規試驗和壓縮試驗、 8組不固結不排水三軸剪切和8組直剪快剪試驗)的基礎上,對太原粉土作了以下方面的分析研究:首先研究了粉土工程性質指標的變異性,得出了變異系數的變化規律,給出了各工程性質指標均值和變異系數范圍的建議值。Specification for structural design of reinforced concrete water tank of water supply and sewerage engineering
給水排水工程鋼筋混凝土水池結構設計規程Article 35 people ' s governments at all levels shall adopt measures to maintain and protect irrigation and drainage facilities, ameliorate the soil to raise fertility and prevent desertification, salinization, water loss and soil erosion and pollution
第三十五條各級人民政府應當採取措施,維護排灌工程設施,改良土壤,提高地力,防止土地荒漠化、鹽漬化、水土流失和污染土地。4. dicussing soil pressure ( supposed as p ) and level displacement ( supposed as s ) in condition that consideration time performance, the relation is p = ae, when the defomation of wall has evidently effect on the soil pressure. 5. the deformation of wall ( supposed as sw ) leads to soil layer sedimentation ( supposed as pw ), the research find pw = 1. 22sw 6. the artifical neural networks has vast and applied foreground in the information construcion of deep foundation excluding the accidental factor
4 、探討了考慮時間效應的土壓力和位移關系曲線,認為在當墻體的變形對土壓力分佈產生明顯影響時,二者間的關系可用一指數函數來表達: p = ae ~ ( ( / s ) ) 5 、墻體側向變形,導致墻後土體產生沉降,在本次研究中,排除掉基坑降水施工因素的影響,由墻體變形導致的墻後土體沉降,二者具有p _ w = 1 . 22s _ w關系; 6 、將基於時間窗口滾動多步神經網路預測方法和應用於深基坑工程墻體變形的預測工作,具有較高的預測精度,該方法在巖土工程變形預測方法中具有廣泛的應用前景。Use of drained method for reclamation for all phases instead of dredged method - drained reclamation takes longer but does not require dredging of contaminated bottom sediments
建築期間所有填土工程應避免使用挖掘方法而改用排放方法填土,雖然需時較長,但不需挖掘備受污染的海床沉積物Specification for structural design of buried premade concrete round pipeline of water supply and sewerage engineering
給水排水工程埋地預制混凝土圓形管管道結構設計規程Engineering of functioning soil and water conservation have engineering prevented and protected for no - rock slope dug, engineering to drain on the ground and engineering to plant trees in the major engineering design
水電工程主體工程設計中具有水土保持功能的工程主要有開挖形成的非巖石邊坡的防護工程、地表截排水工程和綠化工程等。分享友人